Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms in the home and they are also certainly the most costly to renovate. Bathroom renovation can be a job that, if done well, will add value with a home and a great space filled with design and lightweight.
Yellowstone travel trailer  Theres no place like homemade

Bathroom design
Bathroom design may be the first part of your bathroom renovation you need right. Just replacing the existing bathroom with the same design may not be enough. The key to great bathroom design is to design it with the individuals who will certainly put it to use in mind. However ensure that your bathrooms design also has an over-all use factor as well.

For example: If you were designing a bath room for families you can still design the bathroom with easy accessibility to the shower and bath. This would ensure that the style would recieve treatment for those who have limited mobility. This means if you sell your house or if you might be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the space well, taking into consideration the light or window space, size of fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of your room. Mark the current drainage points and after that and water inlet points. Write down a wish set of the restroom fittings to require and desire making use of their sizes. Now marry both together and see what fits. Note: Most bathroom drainage and water inlet points may be moved but this certainly does come at extra expense.
关于我们  纽星达教育移民纽星达教育移民

Bathroom remodel
If you have chosen to accomplish the task yourself or part of the task it is time to employ a skip bin and grab the previous bathroom. If your house was developed pre 1980 you could have fibro bathroom wall linings with asbestos in it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in place you will not have to turn water off for your house. Also you will need to jack hammer a floor tiles up and the sand and cement bed actually laid on.
关于我们  纽星达教育移民纽星达教育移民

Bathroom Renovation and construction
Bathrooms has to be construction properly from the start to be sure that the finished job is correct and true. This also ensures the look and search of the toilet will have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bath hob and bath.

Waterproof the bottom and shower and bath recess.

Correct december the bottom with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Modern Home Interior Designs Ideas design  Desktop Backgrounds for Free HD Wallpaper  wall


Paint ceiling and final  one - Plumbing and electrical
At this point new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the brand new plumbing so that the plumbing fittings are correct when the tiling is completed. For example: To centre a fitting in a shower recess you should consider the thickness of the wall board, tile glue and tile therefore the fitting will likely be centred as soon as the tiles are in position. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness has to be considered so the pipe is within the correct position when the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
Interior Design Ideas  Home Bunch Interior Design Ideas

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board having a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling do not install the cornice because done after tiling. If you are not tiling on the ceiling just install the cornice following the wallboard and ceiling lining are actually installed. Also if your bath is not freestanding now you can form the frame and install the bathtub. Ensure the bathtub is installed correctly making it possible for the thickness with the tiles and  sure to check all linings and pipes before you decide to continue with a bath room renovation.

关于我们 纽星达教育移民纽星达教育移民
Yellowstone travel trailer  Theres no place like homemade

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the bottom make certain that the waterproofing comes 100mm the walls. The shower recess will need to be waterproofed 100mm higher than the shower rose outlet. Also the tub must be waterproofed 100mm above the lip of the bath about and to the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, therefore the all water will simply drop a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most significant.
Step four - Lay inside the cement screed for the ground.

Before the bottom tiles can laid a floor have to be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you must use sand and cement mix and it is best to include a waterproofing agent into this as well. With a level, set the floor level at the doorway. Use the top aluminum angle because the finished floor level and measure on the thickness of the tile plus 10mm to the glue. Mark about the bathroom having a level and after that screed in your sand and cement mix having a 1 to 3 degree fall to the top of the drain outlet. Take your time and have it right with all the finished level as smooth as you possibly can. When the sand cement mix has set but isn't dry (you are able to walk onto it but you it is a little soft) rub it over having a house brick. This will remove every one of the small highs and lows and check having a level as you go. Let the toilet floor fully dry and after that you should have an excellent surface to tile onto. Tip: the harder work you add into the ground screed the easier your tiling will probably be.
关于我们 纽星达教育移民纽星达教育移民
关于我们  纽星达教育移民纽星达教育移民

Step five: Tile floor and walls
Lay your tiles on a floor first then grout. Then lay your wall tiles ensuring actually level because you lay. Once the bathroom tiles are actually cut and laid, grout your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your bathroom vanity making sure it can be level and sealed around the top with silicone and in addition seal around the tub. Tip: make sure they have been in the right place prior to deciding to drill into the tiles.
Modern Home Interior Designs Ideas design Desktop Backgrounds for Free HD Wallpaper wall
关于我们  纽星达教育移民纽星达教育移民

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring that things are fitted correctly and that there are no leaks inside your plumbing. - Enjoy your bathroom.