Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms in the home and they are also certainly the most costly to renovate. Bathroom renovation is really a job that, if done well, may add value to a home plus a great space packed with design and light.
简欧风格超小户型装修_装修效果图X团装修网

Bathroom design
Bathroom design could be the first area of your bathrooms renovation you ought to get right. Just replacing the current bathroom with the same design is probably not enough. The key to great bathroom design is usually to design it while using people who will apply it at heart. However make certain that your bathroom design boasts an over-all use factor as well.

For example: If you were designing your bathrooms for families you might still design the bathroom with easy access towards the shower and bath. This would be sure that the structure would also work for people with limited mobility. This means if you opt to sell your property or if you happen to be renovating for profit your design carries a wider market appeal. Great bathroom design also uses space well, considering the sunlight or window space, size fittings, and drainage options. Draw out an idea to scale and down the sizes of your respective room. Mark the existing drainage points and then and water inlet points. Write down a wish list of the lavatory fittings to wish and wish using sizes. Now marry the 2 together to see what fits. Note: Most bathroom drainage and water inlet points can be moved but this certainly does come at extra expense.
Oneroom Apartment Kept Spacious By A Scandinavian Design

Bathroom remodel
If you decide to do the job yourself or part of the job it can be time to work with a skip bin and grab that old bathroom. If your property was developed pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in position you will not have to turn the water off for your house. Also you will have to jack hammer the ground tiles up along with the sand and cement bed they are laid on.
Studio  studio floorplans in 2019  Studio apartment floor plans, Studio apartment layout

Bathroom Renovation and construction
Bathrooms has to be construction properly from the start to make certain that the finished job is correct and true. This also ensures the structure and search of the bathroom will have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bath hob and bath.

Waterproof the bottom and shower and bath recess.

Correct late a floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Top 60 Best Studio Apartment Ideas  Small Space Designs


Paint ceiling and final  one - Plumbing and electrical
At this point new plumbing is installed for clean hot and cold water and drainage. Careful attention needs to be taken when positioning the brand new plumbing so the plumbing fittings are correct when the tiling is fully gone. For example: To centre a fitting in a very shower recess you should consider the thickness with the wall board, tile glue and tile and so the fitting will be centred as soon as the tiles are in position. The same pertains to installing drainage pipes to get a toilet; the wall lining and tile thickness have to be considered and so the pipe is in the correct position when the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them to the mains power.
7 Stylish Decorating Ideas for a Japanese Studio Apartment  Blog

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board which has a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling tend not to install the cornice because this is best done after tiling. If you might be not tiling for the ceiling go on and install the cornice as soon as the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding anyone can form the frame and install the bathtub. Ensure the bath is installed correctly allowing for the thickness in the tiles and  sure to check all linings and pipes before you decide to continue with your bathrooms renovation.

Oneroom Apartment Kept Spacious By A Scandinavian Design
简欧风格超小户型装修_装修效果图X团装修网

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the floor ensure that the waterproofing comes 100mm up the walls. The shower recess will need to be waterproofed 100mm higher than the shower rose outlet. Also the tub must be waterproofed 100mm across the lip in the bath about and to the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, and so the all water will only drop a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most significant.
Step four - Lay inside the cement screed for the floor.

Before the bottom tiles can laid the floor should be smooth and fairly flat with a slight fall for the drainage outlet. To do this you must use sand and cement mix and it is advisable to include a waterproofing agent into this too. With a level, set a floor level with the doorway. Use the top aluminum angle because finished floor level and measure down the thickness from the tile plus 10mm for that glue. Mark right around the restroom having a level after which screed in your sand and cement mix using a 1 to 3 degree fall on the top of the drain outlet. Take your time and have it right using the finished level as smooth as possible. When the sand cement mix has set but is just not dry (it is possible to walk into it however you it is still a bit soft) rub it over using a house brick. This will remove all the small highs and lows and look having a level as you go. Let the lavatory floor fully dry then you really should have an excellent surface to tile onto. Tip: the harder work you set into the floor screed the simpler your tiling will likely be.
Studio studio floorplans in 2019 Studio apartment floor plans, Studio apartment layout
Oneroom Apartment Kept Spacious By A Scandinavian Design

Step five: Tile floor and walls
Lay your tiles on a floor first after which grout. Then lay your wall tiles making sure that they're level when you lay. Once the lavatory tiles happen to be cut and laid, grout your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity ensuring it is level and sealed round the top with silicone plus seal around the tub. Tip: make sure they are in the right place before you decide to drill into the tiles.
Top 60 Best Studio Apartment Ideas Small Space Designs
Studio  studio floorplans in 2019  Studio apartment floor plans, Studio apartment layout

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring things are all fitted correctly understanding that there isn't any leaks in your plumbing. - Enjoy your bathroom.