Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house and they're also certainly the most expensive to renovate. Bathroom renovation is really a job that, if done well, may add value to a home and a great space brimming with design and light.
WorldClass Views  21425DR  CAD Available, Canadian, Metric, PDF  Architectural Designs

Bathroom design
Bathroom design is the first part of your bathroom renovation you need right. Just replacing the present bathroom with the same design is probably not enough. The key to great bathroom design is to design it with the folks that are likely to put it to use at heart. However be sure that your bathrooms design also offers a broad use factor also.

For example: If you were designing a bath room for families you may still design the lavatory with easy access to the shower and bath. This would be sure that the design would work for those who have limited mobility. This means if you sell your own home or if you happen to be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the space well, looking at the light or window space, sized fittings, and drainage options. Draw out an agenda to scale and right down the sizes of your respective room. Mark the prevailing drainage points after which and water inlet points. Write down a wish report on the lavatory fittings to need and desire with their sizes. Now marry the 2 together and find out what fits. Note: Most bathroom drainage and water inlet points could be moved but this certainly does come at expense.
Single Family House by BC Estudio Architects « HomeAdore

Bathroom remodel
If you have chosen to perform the project yourself or part of the project it can be time to employ a skip bin and retrieve the old bathroom. If your home appeared pre 1980 maybe you have fibro bathroom wall linings with asbestos inside and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in place you do not must turn water off for the whole house. Also you will likely need to jack hammer the ground tiles up and the sand and cement bed that they're laid on.
3D House View

Bathroom Renovation and construction
Bathrooms has to be construction properly in the ground up to make sure that the finished job is correct and true. This also ensures the style and look of the lavatory can have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Architectural Designs  Home Plans MultiFamily 8 Unit Design  Floor plans  Pinterest  House


Paint ceiling and final  one - Plumbing and electrical
At now all new plumbing is installed for clean cold and hot water and drainage. Careful attention has to be taken when positioning the new plumbing so your plumbing fittings are correct once the tiling is fully gone. For example: To centre a fitting in a shower recess you have to take into account the thickness in the wall board, tile glue and tile so the fitting will likely be centred after the tiles are in position. The same refers to installing drainage pipes to get a toilet; the wall lining and tile thickness has to be looked at therefore the pipe is within the correct position once the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them for the mains power.
Make It Right Releases Six SingleFamily House Designs for Manheim Park Community  ArchDaily

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout onto your new wall board having a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice as this is most effectively achieved after tiling. If you happen to be not tiling on the ceiling go on and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath isn't freestanding now you can from the frame and install the bath. Ensure the bathtub is installed correctly permitting the thickness with the tiles and  sure to check on all linings and pipes before you decide to continue with your bathrooms renovation.

Single Family House by BC Estudio Architects « HomeAdore
WorldClass Views  21425DR  CAD Available, Canadian, Metric, PDF  Architectural Designs

Step three - Waterproof your bathrooms
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the floor ensure that the waterproofing comes 100mm the walls. The shower recess will need to be waterproofed 100mm across the shower rose outlet. Also the tub ought to be waterproofed 100mm over the lip with the bath about and towards the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, therefore the all water will simply decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most important.
Step four - Lay inside cement screed for the bottom.

Before a floor tiles can laid a floor has to be smooth and fairly flat having a slight fall on the drainage outlet. To do this you have to use sand and cement mix in fact it is better to add a waterproofing agent into this also. With a level, set the ground level in the doorway. Use the top aluminum angle because finished floor level and measure along the thickness in the tile plus 10mm to the glue. Mark around the lavatory with a level after which screed within your sand and cement mix with a 1 to 3 degree fall to the top in the drain outlet. Take your time and acquire it right with all the finished level as smooth as you can. When the sand cement mix has set but just isn't dry (you are able to walk about it however you it's still a little soft) rub it over with a house brick. This will remove each of the small highs and lows and appearance which has a level when you go. Let the toilet floor fully dry and then you must have an excellent surface to tile onto. Tip: the greater work you add into the bottom screed the easier your tiling will probably be.
3D House View
Single Family House by BC Estudio Architects « HomeAdore

Step five: Tile floor and walls
Lay your tiles on the ground first then grout. Then lay your wall tiles ensuring that they are level when you lay. Once the bathroom tiles are actually cut and laid, grout all of your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring it's level and sealed around the top with silicone and also seal around the bathtub. Tip: make sure they have been in the right place before you decide to drill to your tiles.
Architectural Designs Home Plans MultiFamily 8 Unit Design Floor plans Pinterest House
3D House View

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making certain everything is fitted correctly and that there aren't any leaks in your plumbing. - Enjoy your bathroom.