Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the home and they are also certainly the most expensive to renovate. Bathroom renovation is a job that, if done well, can also add value to a home along with a great space packed with design and light-weight.
Wheatland Village

Bathroom design
Bathroom design may be the first section of your bathroom renovation you ought to get right. Just replacing the present bathroom with similar design might not be enough. The key to great bathroom design is usually to design it using the individuals who are likely to use it in mind. However be sure that your bathrooms design even offers a general use factor at the same time.

For example: If you were designing your bathroom for families you could still design the toilet with comfortable access to the shower and bath. This would make sure that the structure would work if you have limited mobility. This means if you opt to sell your home or if you're renovating for profit your design carries a wider market appeal. Great bathroom design also uses the room well, considering the sunshine or window space, sized fittings, and drainage options. Draw out a plan to scale and down the sizes of your respective room. Mark the prevailing drainage points and after that and water inlet points. Write down a wish list of the lavatory fittings to wish and desire using sizes. Now marry the 2 together to see what fits. Note: Most bathroom drainage and water inlet points may be moved but this will come at expense.
Floor Plans – Horizon House Continuing Care Retirement Community, Seattle WA

Bathroom remodel
If you've decided to accomplish the task yourself or part of the work it can be time to hire a skip bin and pull out the existing bathroom. If your property appeared pre 1980 you could have fibro bathroom wall linings with asbestos inside and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing available you will not ought to turn water off for the complete house. Also you will need to jack hammer the bottom tiles up and also the sand and cement bed that they are laid on.
50 One “1” Bedroom Apartment/House Plans  Architecture  Design

Bathroom Renovation and construction
Bathrooms have to be construction properly in the start to be sure that the finished job is correct and true. This also ensures the design and look of the lavatory will have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct late the bottom with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Apartment Plan Possibilities  Possible layouts for apartmen…  Flickr


Paint ceiling and final  one - Plumbing and electrical
At this aspect new plumbing is installed for clean cold and warm water and drainage. Careful attention must be taken when positioning the newest plumbing so the plumbing fittings are correct once the tiling is finished. For example: To centre a fitting inside a shower recess you need to take into consideration the thickness from the wall board, tile glue and tile hence the fitting will likely be centred after the tiles are available. The same relates to installing drainage pipes for a toilet; the wall lining and tile thickness have to be considered and so the pipe is within the correct position in the event the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
50 Three “3” Bedroom Apartment/House Plans  Architecture  Design

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board which has a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you happen to be laying your tiles from floor to ceiling tend not to install the cornice because this is most effectively achieved after tiling. If you're not tiling for the ceiling go on and install the cornice following the wallboard and ceiling lining happen to be installed. Also if your bath just isn't freestanding anyone can make up the frame and install the tub. Ensure the tub is installed correctly allowing for the thickness with the tiles and  sure to evaluate all linings and pipes when you continue with your bathrooms renovation.

Floor Plans – Horizon House Continuing Care Retirement Community, Seattle WA
Wheatland Village

Step three - Waterproof your bathroom
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing a floor be sure that the waterproofing comes 100mm inside the walls. The shower recess should be waterproofed 100mm across the shower rose outlet. Also the bathtub needs to be waterproofed 100mm over the lip in the bath around and on the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water will still only decrease a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay in the cement screed for the ground.

Before the ground tiles can laid the bottom must be smooth and fairly flat which has a slight fall to the drainage outlet. To do this you must use sand and cement mix and it's also far better to include a waterproofing agent into this also. With a level, set the bottom level at the doorway. Use the top aluminum angle because finished floor level and measure around the thickness from the tile plus 10mm for the glue. Mark right around the toilet which has a level and then screed in your sand and cement mix with a 1 to 3 degree fall to the top with the drain outlet. Take your time and get it right using the finished level as smooth as you can. When the sand cement mix has set but is not dry (you can walk about it but you it is still somewhat soft) rub it over using a house brick. This will remove all the small highs and lows and look with a level as you go. Let the lavatory floor fully dry and after that you must have an incredible surface to tile onto. Tip: the greater work you put into the ground screed the easier your tiling will be.
50 One “1” Bedroom Apartment/House Plans Architecture Design
Floor Plans – Horizon House Continuing Care Retirement Community, Seattle WA

Step five: Tile floor and walls
Lay your tiles on the ground first after which grout. Then lay your wall tiles making sure they are level when you lay. Once the lavatory tiles have been cut and laid, grout your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your bathroom vanity making certain it is level and sealed across the top with silicone and in addition seal around the bathtub. Tip: make sure they have been in the right place prior to deciding to drill to your tiles.
Apartment Plan Possibilities Possible layouts for apartmen… Flickr
50 One “1” Bedroom Apartment/House Plans  Architecture  Design

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making sure it is all totally fitted correctly which there aren't any leaks within your plumbing. - Enjoy a new bathroom.