Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms inside your home and they're also the most costly to renovate. Bathroom renovation is really a job that, if done well, can add value to a home and a great space filled with design and light-weight.
Top 60 Best Log Cabin Interior Design Ideas  Mountain Retreat Homes

Bathroom design
Bathroom design could be the first part of a bath room renovation you need to get right. Just replacing the existing bathroom with the same design might not be enough. The key to great bathroom design would be to design it with all the people who are going to apply it at heart. However ensure that your bathroom design even offers an over-all use factor at the same time.

For example: If you were designing your bathroom for families you could still design the toilet with quick access for the shower and bath. This would make sure that the structure would work for people with limited mobility. This means if you decide to sell your home or if you might be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, taking into account the sunlight or window space, size fittings, and drainage options. Draw out a strategy to scale and all the way down the sizes of one's room. Mark the current drainage points and then and water inlet points. Write down a wish report on the toilet fittings to require and wish with their sizes. Now marry both together and find out what fits. Note: Most bathroom drainage and water inlet points may be moved but this does come at extra cost.
Log Home Interiors  Yellowstone Log Homes

Bathroom remodel
If you have decided to do the project yourself or part of the work it's time to work with a skip bin and take out the existing bathroom. If your own home was developed pre 1980 you may have fibro bathroom wall linings with asbestos inside it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing available you do not need to turn the river off for the complete house. Also you will need to jack hammer the bottom tiles up along with the sand and cement bed that they are laid on.
Log Cabin Interiors  Houzz

Bathroom Renovation and construction
Bathrooms have to be construction properly through the ground-up to make sure that the finished job is correct and true. This also ensures the design and appearance of the bathroom may have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct december the floor with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Log Home Interiors  Yellowstone Log Homes


Paint ceiling and final  one - Plumbing and electrical
At this time many new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the modern plumbing in order that the plumbing fittings are correct when the tiling ends. For example: To centre a fitting in the shower recess you must take into account the thickness with the wall board, tile glue and tile and so the fitting will likely be centred as soon as the tiles are available. The same applies to installing drainage pipes for the toilet; the wall lining and tile thickness has to be considered hence the pipe is within the correct position when the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them to the mains power.
1000+ images about Home: Cabins on Pinterest  Stove, Cabin and Cabin interiors

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board which has a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you happen to be laying your tiles from floor to ceiling do not install the cornice because best done after tiling. If you might be not tiling towards the ceiling just install the cornice following your wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding you can now from the frame and install the bath. Ensure the bath is installed correctly permitting the thickness of the tiles and  sure to evaluate all linings and pipes before you decide to continue with your bathrooms renovation.

Log Home Interiors Yellowstone Log Homes
Top 60 Best Log Cabin Interior Design Ideas  Mountain Retreat Homes

Step three - Waterproof your bathrooms
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the ground be sure that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm over the shower rose outlet. Also the tub must be waterproofed 100mm over the lip of the bath about and towards the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, therefore the all water will only decrease a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most significant.
Step four - Lay in the cement screed for the bottom.

Before the ground tiles can laid the floor should be smooth and fairly flat using a slight fall for the drainage outlet. To do this you need to use sand and cement mix which is far better to add a waterproofing agent into this as well. With a level, set the floor level at the doorway. Use the top aluminum angle because finished floor level and measure on the thickness of the tile plus 10mm for your glue. Mark around the toilet having a level and after that screed in your sand and cement mix with a 1 to 3 degree fall on the top with the drain outlet. Take your time and acquire it right with the finished level as smooth as you possibly can. When the sand cement mix has set but just isn't dry (you are able to walk about it but you it's still a lttle bit soft) rub it over having a house brick. This will remove all the small highs and lows and appearance having a level when you go. Let the bathroom floor fully dry and after that you must have a great surface to tile onto. Tip: greater work you put into the ground screed the easier your tiling will likely be.
Log Cabin Interiors Houzz
Log Home Interiors  Yellowstone Log Homes

Step five: Tile floor and walls
Lay your tiles on the floor first and after that grout. Then lay your wall tiles ensuring that they're level when you lay. Once the bathroom tiles have been cut and laid, grout your entire tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity ensuring it really is level and sealed throughout the top with silicone as well as seal around the tub. Tip: make sure they come in the right place when you drill into the tiles.
Log Home Interiors Yellowstone Log Homes
Log Cabin Interiors  Houzz

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making sure things are fitted correctly knowning that there isn't any leaks inside your plumbing. - Enjoy your new bathroom.