THOUGHTSKOTO

3 Bedroom Home Design Plans Plan For A House Of 3 Bedroom Homes Floor Plans THOUGHTSKOTO

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms at home and they are also one the most costly to renovate. Bathroom renovation is really a job that, if done well, will add value to a home along with a great space brimming with design and lightweight.
THOUGHTSKOTO

Bathroom design
Bathroom design could be the first part of your bathrooms renovation you need right. Just replacing the present bathroom with similar design is probably not enough. The key to great bathroom design would be to design it with all the individuals who will use it planned. However ensure that your bathrooms design even offers a general use factor as well.

For example: If you were designing your bathroom for families you could still design the toilet with easy access to the shower and bath. This would be sure that the style would also work for those who have limited mobility. This means if you opt to sell your house or if you are renovating for profit your design has a wider market appeal. Great bathroom design also uses the area well, considering the sunshine or window space, size fittings, and drainage options. Draw out an idea to scale and right down the sizes of your respective room. Mark the prevailing drainage points and then and water inlet points. Write down a wish set of the toilet fittings to want and need with their sizes. Now marry both together and see what fits. Note: Most bathroom drainage and water inlet points may be moved but this does come at extra cost.
50 Three “3” Bedroom Apartment/House Plans  Architecture  Design

Bathroom remodel
If you decide to perform the job yourself or part of the work it really is time to employ a skip bin and pull out that old bathroom. If your home was made pre 1980 you may have fibro bathroom wall linings with asbestos inside and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing available you'll not have to turn the lake off for the whole house. Also you will need to jack hammer the floor tiles up and the sand and cement bed they are laid on.
Small 3 Bedroom Bungalow House Plans  Small 3 Bedroom 2 Bath House Plans  YouTube

Bathroom Renovation and construction
Bathrooms must be construction properly from the start to make certain that the finished job is correct and true. This also ensures the structure and look of the restroom could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof the floor and shower and bath recess.

Correct nov the bottom with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
3 Bedroom Apartment/House Plans


Paint ceiling and final  one - Plumbing and electrical
At this aspect new plumbing is installed for clean cold and hot water and drainage. Careful attention needs to be taken when positioning the modern plumbing so the plumbing fittings are correct when the tiling is completed. For example: To centre a fitting in a shower recess you need to take into account the thickness from the wall board, tile glue and tile so the fitting will likely be centred following the tiles are available. The same refers to installing drainage pipes for any toilet; the wall lining and tile thickness have to be taken into consideration therefore the pipe influences correct position in the event the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them towards the mains power.
3 bedroom ranch floor plans  Three Bedroom Ranch  home ideas  Pinterest  Image search, Floor

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice because best done after tiling. If you're not tiling towards the ceiling proceed to install the cornice following your wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding it's simple to from the frame and install the bathtub. Ensure the bath is installed correctly allowing for the thickness of the tiles and  sure to test all linings and pipes prior to deciding to continue with a bath room renovation.

50 Three “3” Bedroom Apartment/House Plans Architecture Design
THOUGHTSKOTO

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the bath. When waterproofing a floor be sure that the waterproofing comes 100mm inside the walls. The shower recess should be waterproofed 100mm higher than the shower rose outlet. Also the bathtub must be waterproofed 100mm across the lip from the bath right around and for the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water is only going to go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most significant.
Step four - Lay within the cement screed for a floor.

Before a floor tiles can laid a floor has to be smooth and fairly flat with a slight fall to the drainage outlet. To do this you should use sand and cement mix and it's also best to put in a waterproofing agent into this as well. With a level, set the bottom level at the doorway. Use the top aluminum angle because finished floor level and measure around the thickness with the tile plus 10mm for that glue. Mark right around the toilet having a level and after that screed with your sand and cement mix which has a 1 to 3 degree fall for the top with the drain outlet. Take your time and obtain it right while using finished level as smooth as you possibly can. When the sand cement mix has set but is not dry (you are able to walk onto it however, you it is a bit soft) rub it over using a house brick. This will remove all the small highs and lows and check which has a level when you go. Let the toilet floor fully dry after which you should have a fantastic surface to tile onto. Tip: the harder work you add into the ground screed the simpler your tiling will be.
Small 3 Bedroom Bungalow House Plans Small 3 Bedroom 2 Bath House Plans YouTube
50 Three “3” Bedroom Apartment/House Plans  Architecture  Design

Step five: Tile floor and walls
Lay your tiles on the bottom first then grout. Then lay your wall tiles ensuring that that they are level as you lay. Once the bathroom tiles happen to be cut and laid, grout all your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your bathroom vanity making sure it's level and sealed throughout the top with silicone plus seal around the bathtub. Tip: make sure they are in the right place before you drill in your tiles.
3 Bedroom Apartment/House Plans
Small 3 Bedroom Bungalow House Plans  Small 3 Bedroom 2 Bath House Plans  YouTube

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that things are fitted correctly understanding that there isn't any leaks with your plumbing. - Enjoy your brand-new bathroom.

Comments