Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms at home and they are also one the most costly to renovate. Bathroom renovation is really a job that, if done well, can also add value to a home as well as a great space packed with design and lightweight.
The 25+ best Boy bedrooms ideas on Pinterest  Boys room ideas, Kids bedroom boys and Boys room

Bathroom design
Bathroom design will be the first area of your bathroom renovation you ought to get right. Just replacing the existing bathroom with similar design might not be enough. The key to great bathroom design is to design it using the people that will certainly apply it planned. However be sure that a bath room design also offers a broad use factor as well.

For example: If you were designing a bathroom for families you could still design the lavatory with quick access for the shower and bath. This would make certain that the design would work for people with limited mobility. This means if you decide to sell your house or if you happen to be renovating for profit your design carries a wider market appeal. Great bathroom design also uses space well, taking into account the sunshine or window space, sized fittings, and drainage options. Draw out an idea to scale and right down the sizes of the room. Mark the present drainage points after which and water inlet points. Write down a wish list of the toilet fittings to want and desire with their sizes. Now marry the two together and find out what fits. Note: Most bathroom drainage and water inlet points might be moved but this certainly does come at expense.
30 Awesome Teenage Boy Bedroom Ideas DesignBump

Bathroom remodel
If you decide to perform the job yourself or part of the job it's time to work with a skip bin and pull out the old bathroom. If your house was developed pre 1980 you might have fibro bathroom wall linings with asbestos inside it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in place you do not need to turn water off for the complete house. Also you will need to jack hammer the bottom tiles up and the sand and cement bed that they're laid on.
5 stylish boys bedrooms  boys room  Soccer bedroom, Football bedroom y Soccer room

Bathroom Renovation and construction
Bathrooms should be construction properly from your ground up to be sure that the finished job is correct and true. This also ensures the structure and appearance of the bathroom may have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bath hob and bath.

Waterproof a floor and shower and bath recess.

Correct december the bottom with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
teen boy bedroom ideas  Google Search  DIY Home Decor  Pinterest  Teen boy rooms, Teenage


Paint ceiling and final  one - Plumbing and electrical
At this time all new plumbing is installed for clean cold and hot water and drainage. Careful attention should be taken when positioning the new plumbing so your plumbing fittings are correct if the tiling ends. For example: To centre a fitting inside a shower recess you need to consider the thickness of the wall board, tile glue and tile therefore the fitting is going to be centred after the tiles are in position. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness has to be taken into consideration therefore the pipe is incorporated in the correct position once the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them towards the mains power.
40 Teenage Boys Room Designs We Love

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you are laying your tiles from floor to ceiling do not install the cornice because this is most effectively achieved after tiling. If you are not tiling towards the ceiling just install the cornice following the wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding now you can form the frame and install the bath. Ensure the bathtub is installed correctly enabling the thickness with the tiles and  sure to evaluate all linings and pipes prior to deciding to continue with your bathroom renovation.

30 Awesome Teenage Boy Bedroom Ideas DesignBump
The 25+ best Boy bedrooms ideas on Pinterest  Boys room ideas, Kids bedroom boys and Boys room

Step three - Waterproof your bathrooms
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the bottom be sure that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm over the shower rose outlet. Also the tub must be waterproofed 100mm over the lip in the bath around and towards the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, so the all water will still only go lower a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most crucial.
Step four - Lay within the cement screed for the floor.

Before the floor tiles can laid the floor have to be smooth and fairly flat using a slight fall for the drainage outlet. To do this you have to use sand and cement mix and it's also best to give a waterproofing agent into this too. With a level, set the ground level with the doorway. Use the top aluminum angle since the finished floor level and measure around the thickness in the tile plus 10mm for that glue. Mark right around the toilet with a level then screed within your sand and cement mix with a 1 to 3 degree fall towards the top of the drain outlet. Take your time and have it right with all the finished level as smooth as you possibly can. When the sand cement mix has set but is not dry (you are able to walk onto it nevertheless, you it is still somewhat soft) rub it over with a house brick. This will remove every one of the small highs and lows and appearance using a level because you go. Let the toilet floor fully dry and after that you should have a great surface to tile onto. Tip: the harder work you set into the floor screed the more your tiling will probably be.
5 stylish boys bedrooms boys room Soccer bedroom, Football bedroom y Soccer room
30 Awesome Teenage Boy Bedroom Ideas DesignBump

Step five: Tile floor and walls
Lay your tiles on the ground first after which grout. Then lay your wall tiles ensuring they are level as you lay. Once the restroom tiles are already cut and laid, grout your entire tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity making sure it really is level and sealed round the top with silicone plus seal around the tub. Tip: make sure they are in the right place when you drill into the tiles.
teen boy bedroom ideas Google Search DIY Home Decor Pinterest Teen boy rooms, Teenage
5 stylish boys bedrooms  boys room  Soccer bedroom, Football bedroom y Soccer room

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring everything is fitted correctly knowning that there isn't any leaks inside your plumbing. - Enjoy your new bathroom.