Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms inside your home plus they are also one the most expensive for renovate. Bathroom renovation is a job that, if done well, can add value to your home as well as a great space brimming with design and light.
Small Bathroom Designs Picture Gallery  QNUD

Bathroom design
Bathroom design is the first area of a bath room renovation you ought to get right. Just replacing the existing bathroom sticking with the same design is probably not enough. The key to great bathroom design would be to design it with all the individuals who will certainly utilize it planned. However be sure that a bath room design also offers an overall use factor also.

For example: If you were designing a bathroom for families you could still design the lavatory with easy accessibility for the shower and bath. This would make certain that the design would recieve treatment if you have limited mobility. This means if you choose to sell your property or if you happen to be renovating for profit your design carries a wider market appeal. Great bathroom design also uses space well, considering the sunshine or window space, size of fittings, and drainage options. Draw out an idea to scale and right down the sizes of your respective room. Mark the prevailing drainage points after which and water inlet points. Write down a wish set of the bathroom fittings to wish and want using sizes. Now marry both together and see what fits. Note: Most bathroom drainage and water inlet points can be moved but this certainly does come at extra expense.
Small Bathroom Remodeling Ideas

Bathroom remodel
If you have chosen to perform the job yourself or part of the task it's time to engage a skip bin and take out the existing bathroom. If your home is made pre 1980 maybe you have fibro bathroom wall linings with asbestos inside and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing in place you'll not ought to turn water off for your house. Also you should jack hammer the ground tiles up and also the sand and cement bed that they're laid on.
Nicely done for a small basement bathroom.  Living big in a small space  Pinterest  Small

Bathroom Renovation and construction
Bathrooms should be construction properly from your start to be sure that the finished job is correct and true. This also ensures the design and appear of the lavatory will have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof a floor and shower and bath recess.

Correct december the floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
ACR Kitchen and Bathroom Remodeling Serving all Greensburg and Pittsburgh Areas


Paint ceiling and final  one - Plumbing and electrical
At this point brand new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the brand new plumbing in order that the plumbing fittings are correct in the event the tiling is fully gone. For example: To centre a fitting in a very shower recess you have to think about the thickness with the wall board, tile glue and tile hence the fitting will be centred following the tiles are available. The same refers to installing drainage pipes for the toilet; the wall lining and tile thickness have to be looked at so the pipe is incorporated in the correct position if the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them to the mains power.
Vermont Professional Construction  Painting LLC: Tolchin Bathroom Remodel

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout onto your new wall board having a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling do not install the cornice because most effectively achieved after tiling. If you happen to be not tiling on the ceiling go ahead and install the cornice following the wallboard and ceiling lining happen to be installed. Also if your bath is not freestanding it's simple to form the frame and install the bathtub. Ensure the bath is installed correctly permitting the thickness from the tiles and  sure to test all linings and pipes when you continue with your bathrooms renovation.

Small Bathroom Remodeling Ideas
Small Bathroom Designs Picture Gallery  QNUD

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the bottom ensure that the waterproofing comes 100mm up the walls. The shower recess must be waterproofed 100mm higher than the shower rose outlet. Also the tub ought to be waterproofed 100mm over the lip with the bath around and for the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, so the all water will still only go lower a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most important.
Step four - Lay in the cement screed for the ground.

Before the floor tiles can laid the ground has to be smooth and fairly flat having a slight fall for the drainage outlet. To do this you have to use sand and cement mix and it is advisable to include a waterproofing agent into this as well. With a level, set the ground level with the doorway. Use the top aluminum angle as the finished floor level and measure down the thickness from the tile plus 10mm for your glue. Mark right around the restroom with a level and after that screed in your sand and cement mix having a 1 to 3 degree fall for the top in the drain outlet. Take your time and get it right using the finished level as smooth as you can. When the sand cement mix has set but isn't dry (you'll be able to walk into it however, you it is still a lttle bit soft) rub it over using a house brick. This will remove all the small highs and lows and check having a level when you go. Let the lavatory floor fully dry then you really should have a fantastic surface to tile onto. Tip: greater work you set into the bottom screed the more your tiling will probably be.
Nicely done for a small basement bathroom. Living big in a small space Pinterest Small
Small Bathroom Remodeling Ideas

Step five: Tile floor and walls
Lay your tiles on the ground first and after that grout. Then lay your wall tiles ensuring that actually level while you lay. Once the toilet tiles happen to be cut and laid, grout your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your bathroom vanity making sure it really is level and sealed round the top with silicone and in addition seal around the bath. Tip: make sure they are in the right place before you decide to drill to your tiles.
ACR Kitchen and Bathroom Remodeling Serving all Greensburg and Pittsburgh Areas
Nicely done for a small basement bathroom.  Living big in a small space  Pinterest  Small

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring that things are all fitted correctly and that there won't be any leaks within your plumbing. - Enjoy your new bathroom.