shophomexpressions Lake Home Decorating Ideas WordPress.com site

Log Homes Interior Designs Log Home Interiors Picture Of A Log Home Loft Bedroom Log Home shophomexpressions Lake Home Decorating Ideas WordPress.com site

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house plus they are also the most expensive to renovate. Bathroom renovation is really a job that, if done well, will add value to some home as well as a great space brimming with design and light-weight.
shophomexpressions  Lake Home Decorating Ideas WordPress.com site

Bathroom design
Bathroom design could be the first area of your bathrooms renovation you need to get right. Just replacing the existing bathroom sticking with the same design may not be enough. The key to great bathroom design is to design it while using people that will put it to use planned. However make sure that your bathrooms design also has an overall use factor also.

For example: If you were designing your bathrooms for families you may still design the restroom with comfortable access towards the shower and bath. This would make sure that the design would work if you have limited mobility. This means if you decide to sell your house or if you happen to be renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, taking into consideration the sunlight or window space, sized fittings, and drainage options. Draw out a plan to scale and down the sizes of one's room. Mark the current drainage points then and water inlet points. Write down a wish list of the restroom fittings to require and need making use of their sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points can be moved but this will come at extra expense.
1000+ ideas about Log Home Decorating on Pinterest  Log homes, Living room designs and Modern

Bathroom remodel
If you have decided to accomplish the work yourself or part of the task it is time to engage a skip bin and take out the existing bathroom. If your home was made pre 1980 maybe you have fibro bathroom wall linings with asbestos within it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing available you will not have to turn the water off for your house. Also you will likely need to jack hammer a floor tiles up along with the sand and cement bed that they're laid on.
shophomexpressions  Lake Home Decorating Ideas WordPress.com site

Bathroom Renovation and construction
Bathrooms have to be construction properly from the ground-up to be sure that the finished job is correct and true. This also ensures the design and search of the restroom can have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
22 Luxurious Log Cabin Interiors You HAVE To See  Log Cabin Hub


Paint ceiling and final  one - Plumbing and electrical
At this point new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the newest plumbing so the plumbing fittings are correct when the tiling is completed. For example: To centre a fitting in a very shower recess you must take into account the thickness in the wall board, tile glue and tile therefore the fitting will be centred after the tiles are available. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness should be looked at hence the pipe is within the correct position in the event the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them on the mains power.
25+ Best Ideas about Log Home Decorating on Pinterest  Log home designs, Log cabin houses and

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board using a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice because this is best done after tiling. If you are not tiling to the ceiling just install the cornice following your wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now from the frame and install the bathtub. Ensure the bath is installed correctly permitting the thickness from the tiles and  sure to test all linings and pipes prior to deciding to continue with your bathrooms renovation.

1000+ ideas about Log Home Decorating on Pinterest Log homes, Living room designs and Modern
shophomexpressions  Lake Home Decorating Ideas WordPress.com site

Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the floor ensure that the waterproofing comes 100mm inside the walls. The shower recess will have to be waterproofed 100mm above the shower rose outlet. Also the bath needs to be waterproofed 100mm higher than the lip of the bath right around and on the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, and so the all water will still only drop a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most significant.
Step four - Lay within the cement screed for the floor.

Before the bottom tiles can laid the floor has to be smooth and fairly flat using a slight fall for the drainage outlet. To do this you have to use sand and cement mix and it is far better to put in a waterproofing agent into this as well. With a level, set the ground level with the doorway. Use the top aluminum angle because finished floor level and measure on the thickness with the tile plus 10mm for your glue. Mark right around the lavatory which has a level after which screed with your sand and cement mix with a 1 to 3 degree fall on the top of the drain outlet. Take your time and acquire it right with the finished level as smooth as you possibly can. When the sand cement mix has set but is just not dry (you'll be able to walk on it but you will still be a lttle bit soft) rub it over which has a house brick. This will remove every one of the small highs and lows and check using a level while you go. Let the bathroom floor fully dry then you needs to have an incredible surface to tile onto. Tip: greater work you add into the floor screed the more your tiling will probably be.
shophomexpressions Lake Home Decorating Ideas WordPress.com site
1000+ ideas about Log Home Decorating on Pinterest  Log homes, Living room designs and Modern

Step five: Tile floor and walls
Lay your tiles on the floor first after which grout. Then lay your wall tiles ensuring that actually level as you lay. Once the bathroom tiles have been cut and laid, grout your entire tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity making sure it is level and sealed around the top with silicone and also seal around the bathtub. Tip: make sure they will be in the right place before you decide to drill into the tiles.
22 Luxurious Log Cabin Interiors You HAVE To See Log Cabin Hub
shophomexpressions  Lake Home Decorating Ideas WordPress.com site

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making certain everything is fitted correctly understanding that there isn't any leaks within your plumbing. - Enjoy a new bathroom.

Comments