Shipping container house design project YouTube

Container Homes Designs And Plans Container Home Designer For Worthy Shipping Container House Shipping container house design project YouTube

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms at home and they are generally also one the most costly to renovate. Bathroom renovation is really a job that, if done well, will add value to a home plus a great space packed with design and light.
Shipping container house design project  YouTube

Bathroom design
Bathroom design could be the first section of your bathrooms renovation you need right. Just replacing the existing bathroom with the exact same design may not be enough. The key to great bathroom design would be to design it with all the people that will put it to use at heart. However be sure that your bathrooms design boasts an over-all use factor at the same time.

For example: If you were designing a bathroom for families you could still design the lavatory with comfortable access towards the shower and bath. This would ensure that the structure would work for those who have limited mobility. This means if you sell your house or if you happen to be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the room well, considering the lighting or window space, size fittings, and drainage options. Draw out a plan to scale and right down the sizes of your room. Mark the existing drainage points and after that and water inlet points. Write down a wish list of the toilet fittings to want and need using their sizes. Now marry the 2 together and see what fits. Note: Most bathroom drainage and water inlet points might be moved but this may come at extra expense.
Shipping Container Homes for Sale

Bathroom remodel
If you have chosen to accomplish the job yourself or part of the project it's time to employ a skip bin and take out the previous bathroom. If your home was made pre 1980 maybe you have fibro bathroom wall linings with asbestos inside and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in position you will not need to turn the water off for the entire house. Also you should jack hammer the ground tiles up and also the sand and cement bed actually laid on.
Best shipping container house design ideas 88  AmzHouse.com

Bathroom Renovation and construction
Bathrooms must be construction properly in the ground up to ensure that the finished job is correct and true. This also ensures the style and appear of the bathroom could have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct late a floor with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
10 more container house design ideas  Container Living


Paint ceiling and final  one - Plumbing and electrical
At now brand new plumbing is installed for clean hot and cold water and drainage. Careful attention has to be taken when positioning the new plumbing so your plumbing fittings are correct if the tiling is finished. For example: To centre a fitting in the shower recess you should take into account the thickness in the wall board, tile glue and tile therefore the fitting will likely be centred after the tiles are in place. The same refers to installing drainage pipes for a toilet; the wall lining and tile thickness must be considered therefore the pipe is incorporated in the correct position when the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them towards the mains power.
Best 8 MODERN Shipping Container HOUSE DESIGNS with FLOOR PLANS by ShelterMode  YouTube

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you happen to be laying your tiles from floor to ceiling usually do not install the cornice as this is best done after tiling. If you might be not tiling for the ceiling go on and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath is just not freestanding it's simple to from the frame and install the bath. Ensure the tub is installed correctly enabling the thickness of the tiles and  sure to check all linings and pipes when you continue with your bathroom renovation.

Shipping Container Homes for Sale
Shipping container house design project  YouTube

Step three - Waterproof your bathrooms
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the ground make certain that the waterproofing comes 100mm in the walls. The shower recess will have to be waterproofed 100mm above the shower rose outlet. Also the bath ought to be waterproofed 100mm above the lip with the bath right around and to the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, and so the all water will only go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most significant.
Step four - Lay in the cement screed for a floor.

Before the bottom tiles can laid a floor should be smooth and fairly flat with a slight fall for the drainage outlet. To do this you must use sand and cement mix and it's also better to include a waterproofing agent into this at the same time. With a level, set a floor level at the doorway. Use the top aluminum angle because finished floor level and measure along the thickness from the tile plus 10mm for your glue. Mark right around the restroom using a level and then screed inside your sand and cement mix with a 1 to 3 degree fall to the top from the drain outlet. Take your time and obtain it right while using finished level as smooth as you can. When the sand cement mix has set but isn't dry (you are able to walk into it however you it is still a lttle bit soft) rub it over having a house brick. This will remove all of the small highs and lows and look using a level when you go. Let the bathroom floor fully dry and after that you really should have a great surface to tile onto. Tip: the harder work you set into the floor screed the simpler your tiling will likely be.
Best shipping container house design ideas 88 AmzHouse.com
Shipping Container Homes for Sale

Step five: Tile floor and walls
Lay your tiles on a floor first after which grout. Then lay your wall tiles ensuring that that they are level because you lay. Once the restroom tiles have been cut and laid, grout all your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring it's level and sealed across the top with silicone as well as seal around the bathtub. Tip: make sure they are in the right place before you drill in your tiles.
10 more container house design ideas Container Living
Best shipping container house design ideas 88  AmzHouse.com

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring it is all totally fitted correctly knowning that there are no leaks in your plumbing. - Enjoy your brand-new bathroom.

Comments