Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms in the house and they are generally also the most expensive for renovate. Bathroom renovation is often a job that, if done well, can add value to some home as well as a great space filled with design and lightweight.
Shipping Container Home Floor Plans House  Home  Shipping container house plans, Shipping

Bathroom design
Bathroom design is the first section of a bath room renovation you should get right. Just replacing the existing bathroom with similar design is probably not enough. The key to great bathroom design would be to design it while using people who are going to apply it at heart. However ensure that your bathroom design boasts an over-all use factor also.

For example: If you were designing your bathrooms for families you can still design the restroom with easy access for the shower and bath. This would ensure that the structure would recieve treatment for people with limited mobility. This means if you opt to sell your property or if you're renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, considering the sunlight or window space, size fittings, and drainage options. Draw out an idea to scale and all the way down the sizes of your respective room. Mark the present drainage points and then and water inlet points. Write down a wish listing of the lavatory fittings to require and need making use of their sizes. Now marry the two together to see what fits. Note: Most bathroom drainage and water inlet points may be moved but this will come at expense.
Shipping Container HOMES PLANS and MODULAR REFAB Design Ideas  SPLAYBOX 1280  YouTube

Bathroom remodel
If you have chosen to complete the work yourself or part of the task it can be time to engage a skip bin and retrieve that old bathroom. If your house was made pre 1980 you may have fibro bathroom wall linings with asbestos inside and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in place you won't have to turn water off for the complete house. Also you will need to jack hammer the bottom tiles up along with the sand and cement bed they are laid on.
Shipping Container Home Floorplans

Bathroom Renovation and construction
Bathrooms must be construction properly from the start to ensure that the finished job is correct and true. This also ensures the style and search of the bathroom could have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
plans garage small story cabin plans garage floor residential underground garage plans rv xcb


Paint ceiling and final  one - Plumbing and electrical
At this point brand new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the brand new plumbing so that the plumbing fittings are correct once the tiling is completed. For example: To centre a fitting in a very shower recess you must consider the thickness in the wall board, tile glue and tile so the fitting is going to be centred as soon as the tiles are set up. The same pertains to installing drainage pipes to get a toilet; the wall lining and tile thickness has to be looked at and so the pipe influences correct position when the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them to the mains power.
Shipping Container Home Designs  Off Grid World

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board which has a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you are laying your tiles from floor to ceiling tend not to install the cornice as this is best done after tiling. If you're not tiling on the ceiling just install the cornice after the wallboard and ceiling lining happen to be installed. Also if your bath isn't freestanding you can now form the frame and install the tub. Ensure the bath is installed correctly enabling the thickness from the tiles and  sure to test all linings and pipes when you continue with your bathroom renovation.

Shipping Container HOMES PLANS and MODULAR REFAB Design Ideas SPLAYBOX 1280 YouTube
Shipping Container Home Floor Plans House  Home  Shipping container house plans, Shipping

Step three - Waterproof your bathrooms
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the floor ensure that the waterproofing comes 100mm up the walls. The shower recess should be waterproofed 100mm across the shower rose outlet. Also the tub ought to be waterproofed 100mm across the lip of the bath about and for the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water will only go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most significant.
Step four - Lay inside cement screed for the floor.

Before the bottom tiles can laid the floor should be smooth and fairly flat using a slight fall for the drainage outlet. To do this you must use sand and cement mix which is better to give a waterproofing agent into this too. With a level, set the ground level at the doorway. Use the top aluminum angle since the finished floor level and measure down the thickness of the tile plus 10mm to the glue. Mark right around the bathroom having a level and after that screed with your sand and cement mix using a 1 to 3 degree fall towards the top of the drain outlet. Take your time and obtain it right using the finished level as smooth as is possible. When the sand cement mix has set but just isn't dry (you are able to walk on it but you it is still a lttle bit soft) rub it over having a house brick. This will remove all of the small highs and lows and look with a level as you go. Let the bathroom floor fully dry and after that you really should have an excellent surface to tile onto. Tip: the more work you place into the floor screed the easier your tiling will likely be.
Shipping Container Home Floorplans
Shipping Container HOMES PLANS and MODULAR REFAB Design Ideas  SPLAYBOX 1280  YouTube

Step five: Tile floor and walls
Lay your tiles on a floor first and then grout. Then lay your wall tiles making sure actually level because you lay. Once the restroom tiles happen to be cut and laid, grout all your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit a new bathroom vanity making sure it's level and sealed throughout the top with silicone and in addition seal around the tub. Tip: make sure they come in the right place before you drill into your tiles.
plans garage small story cabin plans garage floor residential underground garage plans rv xcb
Shipping Container Home Floorplans

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making sure everything is fitted correctly understanding that there are no leaks in your plumbing. - Enjoy your brand-new bathroom.