Shaker Extension Dining Room Table by Keystone

Shaker Dining Table Shaker Style Dining Table Shaker Extension Dining Room Table by Keystone

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms inside your home and they're also certainly the most expensive to renovate. Bathroom renovation can be a job that, if done well, will add value to some home plus a great space packed with design and light.
Shaker Extension Dining Room Table by Keystone

Bathroom design
Bathroom design may be the first area of a bath room renovation you should get right. Just replacing the present bathroom sticking with the same design may not be enough. The key to great bathroom design is to design it with the individuals who are likely to utilize it at heart. However be sure that your bathrooms design also has a broad use factor too.

For example: If you were designing a bath room for families you might still design the bathroom with comfortable access on the shower and bath. This would be sure that the design would also work for those who have limited mobility. This means if you sell your home or if you happen to be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the room well, taking into account the sunlight or window space, size of fittings, and drainage options. Draw out an agenda to scale and right down the sizes of the room. Mark the prevailing drainage points then and water inlet points. Write down a wish report on the toilet fittings to require and desire using sizes. Now marry both together to see what fits. Note: Most bathroom drainage and water inlet points can be moved but this will come at expense.
Shaker Style Dining Table  Wolds Furniture Company

Bathroom remodel
If you decide to complete the task yourself or part of the task it really is time to employ a skip bin and take out that old bathroom. If your own home was made pre 1980 you may have fibro bathroom wall linings with asbestos in it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you'll not have to turn the lake off for the entire house. Also you should jack hammer a floor tiles up and the sand and cement bed that they're laid on.
Shaker Dining Table  Chris Harter

Bathroom Renovation and construction
Bathrooms has to be construction properly from the start to be sure that the finished job is correct and true. This also ensures the design and search of the bathroom may have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof the bottom and shower and bath recess.

Correct december the bottom with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Vermont Shaker Dining Table  Vermont Woods Studios


Paint ceiling and final  one - Plumbing and electrical
At this point new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the brand new plumbing so your plumbing fittings are correct in the event the tiling is finished. For example: To centre a fitting in the shower recess you have to think about the thickness of the wall board, tile glue and tile and so the fitting will be centred following the tiles are in place. The same pertains to installing drainage pipes for a toilet; the wall lining and tile thickness have to be considered and so the pipe is within the correct position when the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them to the mains power.
Shaker Solid Top Dining Table – Chilton Furniture

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board using a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because best done after tiling. If you're not tiling to the ceiling proceed to install the cornice following the wallboard and ceiling lining are already installed. Also if your bath is not freestanding you can now form the frame and install the bath. Ensure the bath is installed correctly allowing for the thickness in the tiles and  sure to check all linings and pipes before you continue with your bathroom renovation.

Shaker Style Dining Table Wolds Furniture Company
Shaker Extension Dining Room Table by Keystone

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the floor be sure that the waterproofing comes 100mm in the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the tub needs to be waterproofed 100mm across the lip from the bath right around and to the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, and so the all water will simply go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay inside the cement screed for the bottom.

Before a floor tiles can laid the floor have to be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you need to use sand and cement mix and it's also best to include a waterproofing agent into this at the same time. With a level, set the floor level with the doorway. Use the top aluminum angle because the finished floor level and measure along the thickness from the tile plus 10mm to the glue. Mark around the toilet using a level and then screed with your sand and cement mix which has a 1 to 3 degree fall towards the top from the drain outlet. Take your time and acquire it right using the finished level as smooth as is possible. When the sand cement mix has set but just isn't dry (you are able to walk on it however, you it is still a little soft) rub it over using a house brick. This will remove every one of the small highs and lows and appearance having a level because you go. Let the toilet floor fully dry and after that you needs to have a great surface to tile onto. Tip: greater work you add into the floor screed the more your tiling will likely be.
Shaker Dining Table Chris Harter
Shaker Style Dining Table  Wolds Furniture Company

Step five: Tile floor and walls
Lay your tiles on the floor first and after that grout. Then lay your wall tiles ensuring they are level when you lay. Once the toilet tiles are actually cut and laid, grout all your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your brand-new bathroom vanity making sure it can be level and sealed around the top with silicone as well as seal around the bathtub. Tip: make sure they come in the right place before you decide to drill to your tiles.
Vermont Shaker Dining Table Vermont Woods Studios
Shaker Dining Table  Chris Harter

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring it is all totally fitted correctly and that there are no leaks with your plumbing. - Enjoy your new bathroom.

Comments