See The Baltimore 3 Bedroom Townhouse for Rent in Lancaster PA

3 Bedroom Home Design Plans Floor Plan See The Baltimore 3 Bedroom Townhouse for Rent in Lancaster PA

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home and they are also one the most expensive for renovate. Bathroom renovation is a job that, if done well, may add value to your home as well as a great space filled with design and light.
See The Baltimore 3 Bedroom Townhouse for Rent in Lancaster PA

Bathroom design
Bathroom design is the first area of a bath room renovation you need right. Just replacing the current bathroom with the same design might not be enough. The key to great bathroom design is usually to design it with all the people who are likely to use it at heart. However be sure that a bath room design also has an overall use factor also.

For example: If you were designing a bathroom for families you may still design the toilet with comfortable access to the shower and bath. This would be sure that the structure would recieve treatment for those who have limited mobility. This means if you opt to sell your house or if you are renovating for profit your design includes a wider market appeal. Great bathroom design also uses space well, considering the light or window space, size of fittings, and drainage options. Draw out an agenda to scale and right down the sizes of one's room. Mark the current drainage points and then and water inlet points. Write down a wish report on the toilet fittings to need and want using sizes. Now marry both the together and see what fits. Note: Most bathroom drainage and water inlet points could be moved but this may come at extra cost.
3 Bedroom 285m2 [FLOOR PLAN ONLY] – HousePlansHQ

Bathroom remodel
If you have decided to perform the task yourself or part of the project it's time to employ a skip bin and pull out that old bathroom. If your home was made pre 1980 you may have fibro bathroom wall linings with asbestos in it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing in place you'll not have to turn the lake off for the complete house. Also you will likely need to jack hammer a floor tiles up as well as the sand and cement bed that they're laid on.
Contemporary House Plan 1751134: 3 Bedrm, 2684 Sq Ft Home Plan

Bathroom Renovation and construction
Bathrooms has to be construction properly from the start to make sure that the finished job is correct and true. This also ensures the design and appearance of the lavatory could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bath hob and bath.

Waterproof the bottom and shower and bath recess.

Correct the fall of a floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Middleton Stoney, Nr Bicester  OX25  Ref: 30242  Bicester


Paint ceiling and final  one - Plumbing and electrical
At this aspect all new plumbing is installed for clean hot and cold water and drainage. Careful attention needs to be taken when positioning the modern plumbing so your plumbing fittings are correct if the tiling is fully gone. For example: To centre a fitting in a shower recess you must take into account the thickness of the wall board, tile glue and tile therefore the fitting will likely be centred after the tiles are in position. The same refers to installing drainage pipes for any toilet; the wall lining and tile thickness should be taken into consideration and so the pipe influences correct position once the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them to the mains power.
THOUGHTSKOTO

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board using a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling do not install the cornice as this is most effectively achieved after tiling. If you might be not tiling to the ceiling just install the cornice as soon as the wallboard and ceiling lining happen to be installed. Also if your bath isn't freestanding now you can make up the frame and install the bath. Ensure the bath is installed correctly enabling the thickness of the tiles and  sure to check on all linings and pipes before you continue with your bathrooms renovation.

3 Bedroom 285m2 [FLOOR PLAN ONLY] – HousePlansHQ
See The Baltimore 3 Bedroom Townhouse for Rent in Lancaster PA

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the bottom make certain that the waterproofing comes 100mm up the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the bathtub ought to be waterproofed 100mm over the lip with the bath around and to the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, hence the all water will still only go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay inside cement screed for a floor.

Before a floor tiles can laid the ground has to be smooth and fairly flat having a slight fall for the drainage outlet. To do this you should use sand and cement mix and it's also advisable to include a waterproofing agent into this at the same time. With a level, set a floor level at the doorway. Use the top aluminum angle because the finished floor level and measure along the thickness from the tile plus 10mm for the glue. Mark right around the restroom with a level then screed within your sand and cement mix with a 1 to 3 degree fall for the top of the drain outlet. Take your time and obtain it right using the finished level as smooth as possible. When the sand cement mix has set but is not dry (you are able to walk on it however, you it's still a little soft) rub it over which has a house brick. This will remove all the small highs and lows and look which has a level when you go. Let the restroom floor fully dry then you must have a great surface to tile onto. Tip: greater work you put into a floor screed the more your tiling is going to be.
Contemporary House Plan 1751134: 3 Bedrm, 2684 Sq Ft Home Plan
3 Bedroom 285m2 [FLOOR PLAN ONLY] – HousePlansHQ

Step five: Tile floor and walls
Lay your tiles on the bottom first and then grout. Then lay your wall tiles making sure actually level while you lay. Once the lavatory tiles have been cut and laid, grout your entire tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity ensuring it's level and sealed throughout the top with silicone and in addition seal around the bath. Tip: make sure they come in the right place when you drill in your tiles.
Middleton Stoney, Nr Bicester OX25 Ref: 30242 Bicester
Contemporary House Plan 1751134: 3 Bedrm, 2684 Sq Ft Home Plan

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making sure everything is fitted correctly knowning that there are no leaks within your plumbing. - Enjoy a new bathroom.

Comments