Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms in the home and they are also the most expensive to renovate. Bathroom renovation is often a job that, if done well, can also add value to a home along with a great space filled with design and light-weight.
Rustic DIY Barn Wood Shutters  Shelterness

Bathroom design
Bathroom design is the first area of your bathroom renovation you should get right. Just replacing the current bathroom sticking with the same design might not be enough. The key to great bathroom design is usually to design it using the people that will certainly put it to use in your mind. However ensure that a bath room design even offers a general use factor also.

For example: If you were designing a bath room for families you can still design the restroom with easy access for the shower and bath. This would make sure that the structure would recieve treatment for those who have limited mobility. This means if you choose to sell your home or if you're renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, taking into account the light or window space, size fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of your respective room. Mark the prevailing drainage points after which and water inlet points. Write down a wish set of the lavatory fittings to require and wish with their sizes. Now marry the two together and discover what fits. Note: Most bathroom drainage and water inlet points can be moved but this certainly does come at expense.
15 Vintage Decor Ideas That Are Sure To Inspire

Bathroom remodel
If you have decided to accomplish the job yourself or part of the work it is time to employ a skip bin and pull out the previous bathroom. If your own home was developed pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing available you won't ought to turn water off for the whole house. Also you will likely need to jack hammer the bottom tiles up and the sand and cement bed that they're laid on.
40 Home Decor DIY Projects for Summer

Bathroom Renovation and construction
Bathrooms should be construction properly from your ground-up to be sure that the finished job is correct and true. This also ensures the design and appear of the restroom will have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct december the floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
25 DIY Home Decor Ideas  Cheap Home Decorating Crafts


Paint ceiling and final  one - Plumbing and electrical
At this point brand new plumbing is installed for clean cold and hot water and drainage. Careful attention has to be taken when positioning the modern plumbing so your plumbing fittings are correct once the tiling is completed. For example: To centre a fitting inside a shower recess you must take into consideration the thickness of the wall board, tile glue and tile and so the fitting will probably be centred as soon as the tiles are available. The same refers to installing drainage pipes for any toilet; the wall lining and tile thickness have to be taken into consideration hence the pipe influences correct position in the event the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them for the mains power.
35 Glamorous Vintage Christmas Decorating Ideas  All About Christmas

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board having a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you might be laying your tiles from floor to ceiling usually do not install the cornice as this is most effectively achieved after tiling. If you happen to be not tiling towards the ceiling go ahead and install the cornice following the wallboard and ceiling lining are already installed. Also if your bath isn't freestanding you can now make up the frame and install the tub. Ensure the bathtub is installed correctly permitting the thickness in the tiles and  sure to evaluate all linings and pipes before you continue with your bathroom renovation.

15 Vintage Decor Ideas That Are Sure To Inspire
Rustic DIY Barn Wood Shutters  Shelterness

Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing a floor ensure that the waterproofing comes 100mm inside the walls. The shower recess should be waterproofed 100mm over the shower rose outlet. Also the bath needs to be waterproofed 100mm above the lip with the bath around and towards the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, and so the all water will only decrease a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay within the cement screed for a floor.

Before the floor tiles can laid the floor has to be smooth and fairly flat which has a slight fall on the drainage outlet. To do this you should use sand and cement mix and it's also better to include a waterproofing agent into this also. With a level, set the bottom level in the doorway. Use the top aluminum angle because the finished floor level and measure along the thickness from the tile plus 10mm for the glue. Mark around the toilet using a level and after that screed within your sand and cement mix using a 1 to 3 degree fall towards the top of the drain outlet. Take your time and have it right with the finished level as smooth as is possible. When the sand cement mix has set but is just not dry (you'll be able to walk about it but you it is still a little soft) rub it over with a house brick. This will remove all the small highs and lows and look using a level as you go. Let the toilet floor fully dry and then you really should have an excellent surface to tile onto. Tip: the greater work you add into the ground screed the more your tiling will be.
40 Home Decor DIY Projects for Summer
15 Vintage Decor Ideas That Are Sure To Inspire

Step five: Tile floor and walls
Lay your tiles on the bottom first and then grout. Then lay your wall tiles making certain that they are level as you lay. Once the restroom tiles happen to be cut and laid, grout all your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your bathroom vanity making sure it is level and sealed throughout the top with silicone and also seal around the bath. Tip: make sure they have been in the right place prior to deciding to drill in your tiles.
25 DIY Home Decor Ideas Cheap Home Decorating Crafts
40 Home Decor DIY Projects for Summer

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making sure it is all totally fitted correctly which there won't be any leaks within your plumbing. - Enjoy a new bathroom.