Plan 30081RT: Open Floor Plan Farmhouse Architectural Designs Editors Picks House plans

Open Concept Kitchen Design 16 Open Concept Kitchen Designs In Modern Style That Will Beautify Plan 30081RT: Open Floor Plan Farmhouse Architectural Designs Editors Picks House plans

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the home plus they are also the most costly to renovate. Bathroom renovation is often a job that, if done well, can add value to your home as well as a great space brimming with design and lightweight.
Plan 30081RT: Open Floor Plan Farmhouse  Architectural Designs Editors Picks  House plans

Bathroom design
Bathroom design is the first section of your bathrooms renovation you need to get right. Just replacing the existing bathroom with similar design will not be enough. The key to great bathroom design is to design it while using individuals who will utilize it planned. However make certain that a bath room design boasts a broad use factor as well.

For example: If you were designing a bath room for families you can still design the bathroom with easy accessibility towards the shower and bath. This would make sure that the structure would also work for people with limited mobility. This means if you choose to sell your home or if you happen to be renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, taking into account the sunlight or window space, size of fittings, and drainage options. Draw out a strategy to scale and right down the sizes of the room. Mark the prevailing drainage points and after that and water inlet points. Write down a wish set of the toilet fittings to require and need making use of their sizes. Now marry the two together to see what fits. Note: Most bathroom drainage and water inlet points may be moved but this certainly does come at extra expense.
16 Open Concept Kitchen Designs In Modern Style That Will Beautify Your Home

Bathroom remodel
If you've decided to perform the task yourself or part of the job it can be time to engage a skip bin and take out the old bathroom. If your own home is made pre 1980 you could have fibro bathroom wall linings with asbestos within it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing in position you do not must turn the river off for your house. Also you will have to jack hammer a floor tiles up and also the sand and cement bed actually laid on.
Midcentury Modern OpenConcept Kitchen  HGTV Faces of Design  HGTV

Bathroom Renovation and construction
Bathrooms should be construction properly through the ground up to be sure that the finished job is correct and true. This also ensures the design and appear of the toilet may have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the tub hob and bath.

Waterproof the floor and shower and bath recess.

Correct nov the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
28 Open Kitchen Dining Living Room Ideas, 17 Open Concept Kitchen Living Room Design Ideas Style


Paint ceiling and final  one - Plumbing and electrical
At now new plumbing is installed for clean hot and cold water and drainage. Careful attention should be taken when positioning the brand new plumbing so your plumbing fittings are correct when the tiling ends. For example: To centre a fitting inside a shower recess you must consider the thickness with the wall board, tile glue and tile therefore the fitting will probably be centred after the tiles are in position. The same pertains to installing drainage pipes for a toilet; the wall lining and tile thickness have to be taken into account hence the pipe is within the correct position in the event the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them to the mains power.
29 Awesome OpenConcept Dining Room Designs

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on to your new wall board with a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you might be laying your tiles from floor to ceiling tend not to install the cornice as this is best done after tiling. If you happen to be not tiling towards the ceiling just install the cornice following your wallboard and ceiling lining are actually installed. Also if your bath is not freestanding now you can form the frame and install the bathtub. Ensure the bath is installed correctly enabling the thickness from the tiles and  sure to check all linings and pipes before you decide to continue with your bathrooms renovation.

16 Open Concept Kitchen Designs In Modern Style That Will Beautify Your Home
Plan 30081RT: Open Floor Plan Farmhouse  Architectural Designs Editors Picks  House plans

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the bottom make sure that the waterproofing comes 100mm the walls. The shower recess should be waterproofed 100mm across the shower rose outlet. Also the bath ought to be waterproofed 100mm above the lip in the bath around and towards the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, and so the all water is only going to go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most important.
Step four - Lay inside cement screed for the ground.

Before the floor tiles can laid the ground has to be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you need to use sand and cement mix and it's also advisable to put in a waterproofing agent into this as well. With a level, set the ground level with the doorway. Use the top aluminum angle since the finished floor level and measure around the thickness with the tile plus 10mm for the glue. Mark around the lavatory which has a level and after that screed inside your sand and cement mix using a 1 to 3 degree fall towards the top from the drain outlet. Take your time and acquire it right with all the finished level as smooth as is possible. When the sand cement mix has set but is just not dry (you are able to walk on it however you it is a bit soft) rub it over with a house brick. This will remove every one of the small highs and lows and look using a level while you go. Let the toilet floor fully dry after which you should have a great surface to tile onto. Tip: greater work you add into a floor screed the simpler your tiling will probably be.
Midcentury Modern OpenConcept Kitchen HGTV Faces of Design HGTV
16 Open Concept Kitchen Designs In Modern Style That Will Beautify Your Home

Step five: Tile floor and walls
Lay your tiles on the bottom first then grout. Then lay your wall tiles ensuring they are level as you lay. Once the toilet tiles happen to be cut and laid, grout your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit a new bathroom vanity ensuring that it really is level and sealed round the top with silicone as well as seal around the tub. Tip: make sure they have been in the right place before you decide to drill in your tiles.
28 Open Kitchen Dining Living Room Ideas, 17 Open Concept Kitchen Living Room Design Ideas Style
Midcentury Modern OpenConcept Kitchen  HGTV Faces of Design  HGTV

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring that things are all fitted correctly which there isn't any leaks inside your plumbing. - Enjoy your bathroom.

Comments