Picline la deco avec vos photos

Boy Bedroom Designs Ideas For Decorating A Boys Bedroom Awesome Design Cf Boys Room Picline la deco avec vos photos

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the home plus they are also the most expensive for renovate. Bathroom renovation can be a job that, if done well, can also add value to some home along with a great space brimming with design and light-weight.
Picline la deco avec vos photos

Bathroom design
Bathroom design will be the first area of a bath room renovation you should get right. Just replacing the existing bathroom sticking with the same design is probably not enough. The key to great bathroom design would be to design it with the folks that are going to utilize it in mind. However be sure that your bathrooms design also has an over-all use factor too.

For example: If you were designing your bathrooms for families you may still design the lavatory with quick access on the shower and bath. This would be sure that the style would also work if you have limited mobility. This means if you opt to sell your house or if you might be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the room well, taking into consideration the light or window space, height and width of fittings, and drainage options. Draw out a strategy to scale and right down the sizes of your respective room. Mark the prevailing drainage points and then and water inlet points. Write down a wish set of the bathroom fittings to require and desire with their sizes. Now marry the two together and find out what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at extra cost.
Key Interiors by Shinay: Bunk It Out for Young Boys Bedrooms

Bathroom remodel
If you have decided to accomplish the work yourself or part of the task it can be time to hire a skip bin and grab the old bathroom. If your home is made pre 1980 maybe you have fibro bathroom wall linings with asbestos inside it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in position you won't ought to turn the lake off for the entire house. Also you will likely need to jack hammer the ground tiles up along with the sand and cement bed that they are laid on.
10 Teen Room Ideas  To keep your Boys Happy

Bathroom Renovation and construction
Bathrooms should be construction properly from the ground up to make certain that the finished job is correct and true. This also ensures the design and appear of the bathroom can have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the tub hob and bath.

Waterproof a floor and shower and bath recess.

Correct nov a floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
20 Very Cool Kids Room Decor Ideas  Dream Home  Cool kids rooms, Cool kids bedrooms, Kids bedroom


Paint ceiling and final  one - Plumbing and electrical
At this time many new plumbing is installed for clean cold and hot water and drainage. Careful attention needs to be taken when positioning the new plumbing so that the plumbing fittings are correct if the tiling is finished. For example: To centre a fitting in the shower recess you should consider the thickness from the wall board, tile glue and tile so the fitting will probably be centred after the tiles are set up. The same applies to installing drainage pipes for any toilet; the wall lining and tile thickness must be looked at and so the pipe is in the correct position if the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
The 25+ best Boy bedrooms ideas on Pinterest  Boys room ideas, Kids bedroom boys and Boys room

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on your new wall board using a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you might be laying your tiles from floor to ceiling do not install the cornice because this is best done after tiling. If you're not tiling for the ceiling go on and install the cornice following your wallboard and ceiling lining are already installed. Also if your bath is not freestanding anyone can from the frame and install the bath. Ensure the bathtub is installed correctly enabling the thickness with the tiles and  sure to test all linings and pipes when you continue with your bathroom renovation.

Key Interiors by Shinay: Bunk It Out for Young Boys Bedrooms
Picline la deco avec vos photos

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the bottom ensure that the waterproofing comes 100mm in the walls. The shower recess must be waterproofed 100mm over the shower rose outlet. Also the tub needs to be waterproofed 100mm over the lip with the bath around and on the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, and so the all water will still only decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most significant.
Step four - Lay in the cement screed for a floor.

Before the floor tiles can laid the floor have to be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you must use sand and cement mix in fact it is best to give a waterproofing agent into this too. With a level, set a floor level on the doorway. Use the top aluminum angle because the finished floor level and measure down the thickness with the tile plus 10mm for your glue. Mark right around the bathroom having a level and then screed inside your sand and cement mix having a 1 to 3 degree fall to the top from the drain outlet. Take your time and acquire it right with all the finished level as smooth as you can. When the sand cement mix has set but is not dry (you are able to walk onto it but you it is a lttle bit soft) rub it over having a house brick. This will remove every one of the small highs and lows and look which has a level because you go. Let the toilet floor fully dry and then you really should have an incredible surface to tile onto. Tip: the harder work you place into a floor screed the simpler your tiling will probably be.
10 Teen Room Ideas To keep your Boys Happy
Key Interiors by Shinay: Bunk It Out for Young Boys Bedrooms

Step five: Tile floor and walls
Lay your tiles on the bottom first then grout. Then lay your wall tiles making certain that they're level when you lay. Once the bathroom tiles happen to be cut and laid, grout all of your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity ensuring it's level and sealed around the top with silicone and in addition seal around the bathtub. Tip: make sure they have been in the right place when you drill in your tiles.
20 Very Cool Kids Room Decor Ideas Dream Home Cool kids rooms, Cool kids bedrooms, Kids bedroom
10 Teen Room Ideas  To keep your Boys Happy

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making sure things are all fitted correctly understanding that there isn't any leaks with your plumbing. - Enjoy your bathroom.

Comments