Open Concept Kitchen and Family Room Designs Plans Ideas Pictures YouTube

Open Concept Kitchen Design Open Concept Kitchen and Family Room Designs Plans Ideas Pictures YouTube

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house and they are also one the most expensive to renovate. Bathroom renovation is a job that, if done well, can also add value to some home plus a great space filled with design and light.
Open Concept Kitchen and Family Room Designs Plans Ideas Pictures  YouTube

Bathroom design
Bathroom design will be the first part of your bathroom renovation you should get right. Just replacing the prevailing bathroom sticking with the same design may not be enough. The key to great bathroom design is always to design it with all the people that are going to utilize it in mind. However ensure that your bathroom design also has an over-all use factor at the same time.

For example: If you were designing a bathroom for families you can still design the lavatory with quick access on the shower and bath. This would ensure that the design would work if you have limited mobility. This means if you sell your house or if you might be renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, taking into account the sunlight or window space, height and width of fittings, and drainage options. Draw out an agenda to scale and down the sizes of one's room. Mark the prevailing drainage points then and water inlet points. Write down a wish listing of the bathroom fittings to want and desire making use of their sizes. Now marry the 2 together to see what fits. Note: Most bathroom drainage and water inlet points may be moved but this certainly does come at expense.
Open Concept Kitchen Design Ideas  Remodel Works

Bathroom remodel
If you have chosen to complete the work yourself or part of the project it really is time to engage a skip bin and pull out the old bathroom. If your property was developed pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you do not ought to turn the river off for the entire house. Also you should jack hammer the floor tiles up along with the sand and cement bed actually laid on.
15 OpenConcept Kitchens and Living Spaces With Flow  HGTV

Bathroom Renovation and construction
Bathrooms has to be construction properly from the start to make sure that the finished job is correct and true. This also ensures the look and search of the restroom could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bath hob and bath.

Waterproof the floor and shower and bath recess.

Correct december the ground with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
25+ Best Ideas about Open Concept Kitchen on Pinterest  Open concept great room, Kitchen plans


Paint ceiling and final  one - Plumbing and electrical
At this time brand new plumbing is installed for clean cold and hot water and drainage. Careful attention should be taken when positioning the new plumbing so that the plumbing fittings are correct in the event the tiling is fully gone. For example: To centre a fitting in a shower recess you need to consider the thickness from the wall board, tile glue and tile so the fitting is going to be centred after the tiles are in place. The same applies to installing drainage pipes to get a toilet; the wall lining and tile thickness should be taken into account therefore the pipe is incorporated in the correct position when the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
3 OpenConcept Kitchen Ideas For Small Homes  Qanvast

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on to your new wall board using a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice because this is done after tiling. If you might be not tiling towards the ceiling go on and install the cornice following your wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now form the frame and install the tub. Ensure the bath is installed correctly making it possible for the thickness in the tiles and  sure to evaluate all linings and pipes before you continue with your bathroom renovation.

Open Concept Kitchen Design Ideas Remodel Works
Open Concept Kitchen and Family Room Designs Plans Ideas Pictures  YouTube

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the bath. When waterproofing the bottom make sure that the waterproofing comes 100mm the walls. The shower recess will have to be waterproofed 100mm across the shower rose outlet. Also the bathtub must be waterproofed 100mm higher than the lip from the bath around and to the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, so the all water will still only decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most critical.
Step four - Lay in the cement screed for the floor.

Before a floor tiles can laid a floor have to be smooth and fairly flat having a slight fall to the drainage outlet. To do this you need to use sand and cement mix which is advisable to put in a waterproofing agent into this at the same time. With a level, set the ground level with the doorway. Use the top aluminum angle because finished floor level and measure down the thickness of the tile plus 10mm for your glue. Mark right around the toilet which has a level after which screed in your sand and cement mix which has a 1 to 3 degree fall for the top from the drain outlet. Take your time and obtain it right with the finished level as smooth as possible. When the sand cement mix has set but is not dry (it is possible to walk into it however you it is a little soft) rub it over using a house brick. This will remove every one of the small highs and lows and look having a level because you go. Let the restroom floor fully dry and then you really should have an incredible surface to tile onto. Tip: the harder work you place into the floor screed the easier your tiling will be.
15 OpenConcept Kitchens and Living Spaces With Flow HGTV
Open Concept Kitchen Design Ideas  Remodel Works

Step five: Tile floor and walls
Lay your tiles on the ground first after which grout. Then lay your wall tiles making certain actually level because you lay. Once the bathroom tiles are actually cut and laid, grout your entire tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your bathroom vanity making certain it's level and sealed throughout the top with silicone plus seal around the bathtub. Tip: make sure they will be in the right place before you decide to drill into the tiles.
25+ Best Ideas about Open Concept Kitchen on Pinterest Open concept great room, Kitchen plans
15 OpenConcept Kitchens and Living Spaces With Flow  HGTV

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring everything is fitted correctly and that there isn't any leaks within your plumbing. - Enjoy your new bathroom.