Noroof Architects’ BedStuy porcHouse reimagines the classic American front porch 6sqft

Bedroom Windows Designs Modern Bedroom With Large Windows | Interior Design Ideas Noroof Architects’ BedStuy porcHouse reimagines the classic American front porch 6sqft

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms at home and they're also the most costly to renovate. Bathroom renovation is a job that, if done well, can add value to some home plus a great space filled with design and light.
Noroof Architects’ BedStuy porcHouse reimagines the classic American front porch  6sqft

Bathroom design
Bathroom design is the first area of your bathrooms renovation you need to get right. Just replacing the present bathroom sticking with the same design may not be enough. The key to great bathroom design is to design it while using people who are likely to utilize it in your mind. However be sure that your bathrooms design even offers an overall use factor at the same time.

For example: If you were designing a bath room for families you can still design the toilet with easy accessibility to the shower and bath. This would make certain that the design would also work for those who have limited mobility. This means if you choose to sell your home or if you happen to be renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, taking into account the light or window space, size of fittings, and drainage options. Draw out a plan to scale and right down the sizes of the room. Mark the prevailing drainage points and then and water inlet points. Write down a wish set of the toilet fittings to want and wish with their sizes. Now marry the two together to see what fits. Note: Most bathroom drainage and water inlet points can be moved but this will come at extra cost.
Black And White Interior Design Ideas: Modern Apartment by ID White  Architecture Beast

Bathroom remodel
If you have chosen to do the work yourself or part of the project it can be time to employ a skip bin and take out the old bathroom. If your house is made pre 1980 you might have fibro bathroom wall linings with asbestos inside it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in place you will not need to turn the water off for the complete house. Also you should jack hammer the floor tiles up and the sand and cement bed actually laid on.
稻香集團  鍾菜‧鍾廚

Bathroom Renovation and construction
Bathrooms must be construction properly through the ground-up to make sure that the finished job is correct and true. This also ensures the design and appear of the lavatory will have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof the ground and shower and bath recess.

Correct december a floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Hotel Photos of The Boxer  Boutique Hotel in Downtown Boston, MA


Paint ceiling and final  one - Plumbing and electrical
At this aspect all new plumbing is installed for clean hot and cold water and drainage. Careful attention needs to be taken when positioning the modern plumbing so your plumbing fittings are correct in the event the tiling is completed. For example: To centre a fitting in the shower recess you have to think about the thickness from the wall board, tile glue and tile therefore the fitting is going to be centred following your tiles are available. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness has to be considered therefore the pipe is incorporated in the correct position if the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them towards the mains power.
Detalles de una habitación en estilo cottage

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you are laying your tiles from floor to ceiling don't install the cornice because best done after tiling. If you are not tiling on the ceiling go ahead and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath isn't freestanding now you can from the frame and install the bathtub. Ensure the bath is installed correctly permitting the thickness from the tiles and  sure to check on all linings and pipes when you continue with your bathrooms renovation.

Black And White Interior Design Ideas: Modern Apartment by ID White Architecture Beast
Noroof Architects’ BedStuy porcHouse reimagines the classic American front porch  6sqft

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the bottom make sure that the waterproofing comes 100mm up the walls. The shower recess will need to be waterproofed 100mm above the shower rose outlet. Also the bathtub needs to be waterproofed 100mm over the lip with the bath right around and towards the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, and so the all water will only drop a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most critical.
Step four - Lay within the cement screed for the ground.

Before the bottom tiles can laid the ground must be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you need to use sand and cement mix which is advisable to add a waterproofing agent into this too. With a level, set a floor level at the doorway. Use the top aluminum angle since the finished floor level and measure around the thickness of the tile plus 10mm to the glue. Mark right around the lavatory with a level and then screed in your sand and cement mix using a 1 to 3 degree fall for the top in the drain outlet. Take your time and get it right using the finished level as smooth as is possible. When the sand cement mix has set but just isn't dry (you are able to walk onto it nevertheless, you it's still somewhat soft) rub it over using a house brick. This will remove every one of the small highs and lows and check which has a level when you go. Let the restroom floor fully dry then you must have a fantastic surface to tile onto. Tip: the more work you put into the ground screed the more your tiling will be.
稻香集團 鍾菜‧鍾廚
Black And White Interior Design Ideas: Modern Apartment by ID White  Architecture Beast

Step five: Tile floor and walls
Lay your tiles on the floor first and after that grout. Then lay your wall tiles ensuring that that they are level when you lay. Once the bathroom tiles are already cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your new bathroom vanity making certain it really is level and sealed throughout the top with silicone and in addition seal around the tub. Tip: make sure they have been in the right place prior to deciding to drill into the tiles.
Hotel Photos of The Boxer Boutique Hotel in Downtown Boston, MA
稻香集團  鍾菜‧鍾廚

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring it is all totally fitted correctly and that there are no leaks inside your plumbing. - Enjoy a new bathroom.

Comments