绿色家居设计图__室内设计_环境设计_设计图库_昵图网nipic.com

Best Paint For Home Exterior Best Color Combinations For Home Exterior In India | Home Painting 绿色家居设计图__室内设计_环境设计_设计图库_昵图网nipic.com

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the home and they are also certainly the most costly to renovate. Bathroom renovation can be a job that, if done well, will add value to some home as well as a great space packed with design and lightweight.
绿色家居设计图__室内设计_环境设计_设计图库_昵图网nipic.com

Bathroom design
Bathroom design is the first division of a bath room renovation you should get right. Just replacing the prevailing bathroom with the same design might not be enough. The key to great bathroom design would be to design it with all the people that will apply it in mind. However make sure that a bath room design even offers an overall use factor too.

For example: If you were designing a bathroom for families you might still design the restroom with comfortable access to the shower and bath. This would be sure that the design would recieve treatment if you have limited mobility. This means if you opt to sell your home or if you happen to be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, looking at the lighting or window space, size of fittings, and drainage options. Draw out an agenda to scale and all the way down the sizes of one's room. Mark the current drainage points and after that and water inlet points. Write down a wish set of the restroom fittings to require and need making use of their sizes. Now marry both together and find out what fits. Note: Most bathroom drainage and water inlet points may be moved but this will come at extra expense.
The Top 10 Ways to Paint Like a Pro  DIY

Bathroom remodel
If you have chosen to perform the job yourself or part of the job it really is time to work with a skip bin and retrieve the old bathroom. If your property appeared pre 1980 you could have fibro bathroom wall linings with asbestos inside it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing in position you do not have to turn the river off for the whole house. Also you should jack hammer the bottom tiles up and the sand and cement bed that they are laid on.
Smart Tips for Painting Your House  House Painting

Bathroom Renovation and construction
Bathrooms has to be construction properly through the ground up to make sure that the finished job is correct and true. This also ensures the style and appearance of the restroom may have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the tub hob and bath.

Waterproof the ground and shower and bath recess.

Correct nov the floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
The Top 10 Ways to Paint Like a Pro  DIY


Paint ceiling and final  one - Plumbing and electrical
At this aspect new plumbing is installed for clean hot and cold water and drainage. Careful attention has to be taken when positioning the new plumbing so your plumbing fittings are correct in the event the tiling is finished. For example: To centre a fitting in a shower recess you have to consider the thickness in the wall board, tile glue and tile hence the fitting will be centred following your tiles are in position. The same refers to installing drainage pipes for a toilet; the wall lining and tile thickness should be looked at and so the pipe influences correct position if the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them to the mains power.
Votre Façadier / Enduiseur de Brest

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board which has a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because most effectively achieved after tiling. If you happen to be not tiling to the ceiling proceed to install the cornice after the wallboard and ceiling lining are already installed. Also if your bath isn't freestanding you can now make up the frame and install the tub. Ensure the bath is installed correctly making it possible for the thickness from the tiles and  sure to test all linings and pipes before you continue with your bathroom renovation.

The Top 10 Ways to Paint Like a Pro DIY
绿色家居设计图__室内设计_环境设计_设计图库_昵图网nipic.com

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the ground make certain that the waterproofing comes 100mm up the walls. The shower recess should be waterproofed 100mm higher than the shower rose outlet. Also the bathtub needs to be waterproofed 100mm across the lip from the bath around and to the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, so the all water will still only go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most critical.
Step four - Lay within the cement screed for the bottom.

Before a floor tiles can laid the ground has to be smooth and fairly flat using a slight fall towards the drainage outlet. To do this you must use sand and cement mix which is better to put in a waterproofing agent into this as well. With a level, set the floor level with the doorway. Use the top aluminum angle because finished floor level and measure down the thickness with the tile plus 10mm to the glue. Mark around the toilet with a level after which screed with your sand and cement mix using a 1 to 3 degree fall to the top with the drain outlet. Take your time and obtain it right with the finished level as smooth as you can. When the sand cement mix has set but is not dry (you'll be able to walk onto it but you will still be a little soft) rub it over with a house brick. This will remove every one of the small highs and lows and check which has a level as you go. Let the restroom floor fully dry after which you needs to have an incredible surface to tile onto. Tip: greater work you set into a floor screed the easier your tiling will be.
Smart Tips for Painting Your House House Painting
The Top 10 Ways to Paint Like a Pro  DIY

Step five: Tile floor and walls
Lay your tiles on the bottom first then grout. Then lay your wall tiles making sure that they are level while you lay. Once the toilet tiles have been cut and laid, grout your entire tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your new bathroom vanity ensuring it's level and sealed round the top with silicone as well as seal around the bath. Tip: make sure they are in the right place when you drill in your tiles.
The Top 10 Ways to Paint Like a Pro DIY
Smart Tips for Painting Your House  House Painting

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring everything is fitted correctly understanding that there are no leaks with your plumbing. - Enjoy your brand-new bathroom.

Comments