New West Classic

Best New West Classic Traditional Bathroom Vancouver By Clay New West Classic

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms inside your home and they are also one the most expensive to renovate. Bathroom renovation is a job that, if done well, can also add value to your home along with a great space full of design and lightweight.
New West Classic

Bathroom design
Bathroom design may be the first area of your bathrooms renovation you need to get right. Just replacing the current bathroom sticking with the same design might not be enough. The key to great bathroom design is to design it using the people who will certainly put it to use planned. However be sure that your bathroom design also has an overall use factor as well.

For example: If you were designing your bathroom for families you might still design the bathroom with easy access towards the shower and bath. This would ensure that the design would work for those who have limited mobility. This means if you sell your home or if you are renovating for profit your design features a wider market appeal. Great bathroom design also uses the room well, considering the light or window space, height and width of fittings, and drainage options. Draw out an agenda to scale and down the sizes of your room. Mark the prevailing drainage points after which and water inlet points. Write down a wish listing of the bathroom fittings to need and need using sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points could be moved but this may come at expense.
New West Classic  Traditional  Bathroom  Vancouver  by Clay Construction Inc.

Bathroom remodel
If you have chosen to accomplish the work yourself or part of the project it's time to engage a skip bin and grab that old bathroom. If your property appeared pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in position you will not ought to turn the water off for the entire house. Also you will need to jack hammer the ground tiles up and also the sand and cement bed that they're laid on.
Best Traditional Bathroom Design Ideas  Remodel Pictures  Houzz

Bathroom Renovation and construction
Bathrooms should be construction properly from the start to ensure that the finished job is correct and true. This also ensures the style and look of the lavatory could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bathtub hob and bath.

Waterproof the floor and shower and bath recess.

Correct the fall of the floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
New West Classic  Traditional  Bathroom  Vancouver  by Clay Construction Inc.


Paint ceiling and final  one - Plumbing and electrical
At this time new plumbing is installed for clean hot and cold water and drainage. Careful attention needs to be taken when positioning the new plumbing so that the plumbing fittings are correct in the event the tiling is completed. For example: To centre a fitting in a very shower recess you have to consider the thickness with the wall board, tile glue and tile therefore the fitting is going to be centred following the tiles are in place. The same pertains to installing drainage pipes for a toilet; the wall lining and tile thickness should be taken into account therefore the pipe is in the correct position in the event the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
New West Classic  Traditional  Bathroom  Vancouver  by Clay Construction Inc.

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on to your new wall board with a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice because this is done after tiling. If you might be not tiling on the ceiling just install the cornice as soon as the wallboard and ceiling lining are actually installed. Also if your bath is not freestanding now you can from the frame and install the bath. Ensure the bathtub is installed correctly enabling the thickness in the tiles and  sure to check on all linings and pipes before you continue with a bath room renovation.

New West Classic Traditional Bathroom Vancouver by Clay Construction Inc.
New West Classic

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the bottom be sure that the waterproofing comes 100mm the walls. The shower recess will need to be waterproofed 100mm above the shower rose outlet. Also the tub ought to be waterproofed 100mm above the lip of the bath right around and to the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, hence the all water will simply drop a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most significant.
Step four - Lay in the cement screed for a floor.

Before the floor tiles can laid the floor has to be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you have to use sand and cement mix and it's also far better to add a waterproofing agent into this also. With a level, set a floor level at the doorway. Use the top aluminum angle as the finished floor level and measure along the thickness in the tile plus 10mm for the glue. Mark around the lavatory which has a level after which screed inside your sand and cement mix with a 1 to 3 degree fall towards the top of the drain outlet. Take your time and have it right with all the finished level as smooth as you possibly can. When the sand cement mix has set but isn't dry (you can walk about it however you it's still a lttle bit soft) rub it over with a house brick. This will remove every one of the small highs and lows and check having a level as you go. Let the restroom floor fully dry and then you must have an incredible surface to tile onto. Tip: the greater work you set into the bottom screed the simpler your tiling will likely be.
Best Traditional Bathroom Design Ideas Remodel Pictures Houzz
New West Classic  Traditional  Bathroom  Vancouver  by Clay Construction Inc.

Step five: Tile floor and walls
Lay your tiles on the ground first after which grout. Then lay your wall tiles ensuring that they are level when you lay. Once the restroom tiles happen to be cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your bathroom vanity making sure it can be level and sealed round the top with silicone plus seal around the tub. Tip: make sure they are in the right place when you drill into your tiles.
New West Classic Traditional Bathroom Vancouver by Clay Construction Inc.
Best Traditional Bathroom Design Ideas  Remodel Pictures  Houzz

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring that it is all totally fitted correctly and that there aren't any leaks inside your plumbing. - Enjoy a new bathroom.