Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house plus they are also one the most expensive to renovate. Bathroom renovation is often a job that, if done well, can also add value to some home along with a great space filled with design and lightweight.
New West Classic

Bathroom design
Bathroom design could be the first part of your bathrooms renovation you need to get right. Just replacing the existing bathroom with the exact same design might not be enough. The key to great bathroom design is usually to design it using the people who will certainly utilize it planned. However make certain that your bathroom design also offers a general use factor as well.

For example: If you were designing your bathroom for families you can still design the lavatory with easy access towards the shower and bath. This would be sure that the style would recieve treatment for people with limited mobility. This means if you sell your house or if you might be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the room well, taking into consideration the sunlight or window space, size fittings, and drainage options. Draw out an agenda to scale and all the way down the sizes of your room. Mark the prevailing drainage points after which and water inlet points. Write down a wish listing of the restroom fittings to need and wish making use of their sizes. Now marry both the together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at extra cost.
Best 25+ Large shower ideas on Pinterest

Bathroom remodel
If you have chosen to accomplish the task yourself or part of the task it can be time to employ a skip bin and retrieve that old bathroom. If your house appeared pre 1980 you could have fibro bathroom wall linings with asbestos within it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing set up you won't need to turn the water off for the complete house. Also you will have to jack hammer the bottom tiles up and the sand and cement bed actually laid on.
New West Classic  Traditional  Powder Room  vancouver  by Clay Construction Inc.

Bathroom Renovation and construction
Bathrooms have to be construction properly from your ground up to ensure that the finished job is correct and true. This also ensures the design and appearance of the lavatory may have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bathtub hob and bath.

Waterproof the floor and shower and bath recess.

Correct late the floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
New West Classic


Paint ceiling and final  one - Plumbing and electrical
At this aspect all new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the new plumbing in order that the plumbing fittings are correct once the tiling is completed. For example: To centre a fitting inside a shower recess you should think about the thickness from the wall board, tile glue and tile therefore the fitting will be centred as soon as the tiles are available. The same relates to installing drainage pipes to get a toilet; the wall lining and tile thickness should be taken into consideration hence the pipe is incorporated in the correct position if the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
New West Classic  Traditional  Bathroom  Vancouver  by Clay Construction Inc.

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board which has a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you happen to be laying your tiles from floor to ceiling usually do not install the cornice as this is done after tiling. If you are not tiling towards the ceiling just install the cornice following the wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now from the frame and install the tub. Ensure the bath is installed correctly permitting the thickness with the tiles and  sure to check on all linings and pipes when you continue with your bathrooms renovation.

Best 25+ Large shower ideas on Pinterest
New West Classic

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing a floor make sure that the waterproofing comes 100mm in the walls. The shower recess must be waterproofed 100mm over the shower rose outlet. Also the bath ought to be waterproofed 100mm above the lip of the bath about and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, and so the all water will still only decrease a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay inside cement screed for the bottom.

Before the bottom tiles can laid a floor have to be smooth and fairly flat which has a slight fall to the drainage outlet. To do this you need to use sand and cement mix and it's also better to give a waterproofing agent into this at the same time. With a level, set the bottom level with the doorway. Use the top aluminum angle because finished floor level and measure on the thickness in the tile plus 10mm for the glue. Mark around the restroom having a level then screed with your sand and cement mix using a 1 to 3 degree fall for the top in the drain outlet. Take your time and obtain it right while using finished level as smooth as possible. When the sand cement mix has set but just isn't dry (it is possible to walk onto it nevertheless, you will still be a little soft) rub it over using a house brick. This will remove each of the small highs and lows and check using a level when you go. Let the bathroom floor fully dry and after that you must have a great surface to tile onto. Tip: the more work you place into the ground screed the easier your tiling will be.
New West Classic Traditional Powder Room vancouver by Clay Construction Inc.
Best 25+ Large shower ideas on Pinterest

Step five: Tile floor and walls
Lay your tiles on a floor first after which grout. Then lay your wall tiles making certain that they're level while you lay. Once the restroom tiles have been cut and laid, grout your entire tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your bathroom vanity ensuring it can be level and sealed throughout the top with silicone and in addition seal around the bathtub. Tip: make sure they come in the right place prior to deciding to drill into your tiles.
New West Classic
New West Classic  Traditional  Powder Room  vancouver  by Clay Construction Inc.

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring everything is fitted correctly which there are no leaks within your plumbing. - Enjoy your new bathroom.