New home designs latest.: October 2011

Narrow Block Home Designs Home Designs For Narrow Blocks | Home Design Ideas New home designs latest.: October 2011

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms in the home plus they are also one the most costly to renovate. Bathroom renovation can be a job that, if done well, can also add value to some home and a great space packed with design and light-weight.
New home designs latest.: October 2011

Bathroom design
Bathroom design will be the first area of your bathroom renovation you need right. Just replacing the present bathroom with similar design might not be enough. The key to great bathroom design is always to design it with all the people that are going to use it in mind. However make certain that a bath room design also has a broad use factor at the same time.

For example: If you were designing a bathroom for families you might still design the bathroom with quick access on the shower and bath. This would make certain that the structure would work for people with limited mobility. This means if you decide to sell your house or if you're renovating for profit your design carries a wider market appeal. Great bathroom design also uses the room well, taking into consideration the light or window space, size of fittings, and drainage options. Draw out an agenda to scale and down the sizes of your respective room. Mark the current drainage points after which and water inlet points. Write down a wish set of the bathroom fittings to want and wish with their sizes. Now marry both the together to see what fits. Note: Most bathroom drainage and water inlet points may be moved but this does come at expense.
Home Design Ideas  idee arredamento casa

Bathroom remodel
If you have chosen to perform the job yourself or part of the job it is time to work with a skip bin and pull out the old bathroom. If your house is made pre 1980 you may have fibro bathroom wall linings with asbestos in it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in place you won't ought to turn the water off for your house. Also you will likely need to jack hammer the ground tiles up along with the sand and cement bed that they are laid on.
Spectacular modern mountain home in Park City, Utah  Foyers and Mudrooms  Pinterest  Home

Bathroom Renovation and construction
Bathrooms should be construction properly through the ground-up to make certain that the finished job is correct and true. This also ensures the design and search of the bathroom may have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof the floor and shower and bath recess.

Correct december a floor with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
New home designs latest.: home design ideas.


Paint ceiling and final  one - Plumbing and electrical
At this point all new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the newest plumbing so the plumbing fittings are correct when the tiling ends. For example: To centre a fitting in a very shower recess you should take into account the thickness of the wall board, tile glue and tile therefore the fitting will be centred as soon as the tiles are available. The same pertains to installing drainage pipes to get a toilet; the wall lining and tile thickness have to be taken into account therefore the pipe influences correct position when the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them for the mains power.
Home Design Ideas with Cape Cod Interior Design  MidCityEast

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout onto your new wall board using a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because this is best done after tiling. If you might be not tiling to the ceiling go on and install the cornice after the wallboard and ceiling lining happen to be installed. Also if your bath just isn't freestanding now you can form the frame and install the bathtub. Ensure the bath is installed correctly allowing for the thickness from the tiles and  sure to check all linings and pipes before you continue with your bathroom renovation.

Home Design Ideas idee arredamento casa
New home designs latest.: October 2011

Step three - Waterproof your bathrooms
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing the floor be sure that the waterproofing comes 100mm inside the walls. The shower recess will need to be waterproofed 100mm over the shower rose outlet. Also the tub needs to be waterproofed 100mm above the lip from the bath around and towards the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, therefore the all water will only go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most critical.
Step four - Lay in the cement screed for the ground.

Before the ground tiles can laid the floor must be smooth and fairly flat using a slight fall to the drainage outlet. To do this you need to use sand and cement mix in fact it is better to include a waterproofing agent into this at the same time. With a level, set a floor level in the doorway. Use the top aluminum angle because the finished floor level and measure on the thickness with the tile plus 10mm for that glue. Mark around the restroom having a level and then screed inside your sand and cement mix with a 1 to 3 degree fall for the top in the drain outlet. Take your time and acquire it right with the finished level as smooth as is possible. When the sand cement mix has set but is not dry (you'll be able to walk about it however you it is still a lttle bit soft) rub it over having a house brick. This will remove all of the small highs and lows and check with a level as you go. Let the bathroom floor fully dry and after that you really should have an incredible surface to tile onto. Tip: the more work you add into the ground screed the easier your tiling will be.
Spectacular modern mountain home in Park City, Utah Foyers and Mudrooms Pinterest Home
Home Design Ideas  idee arredamento casa

Step five: Tile floor and walls
Lay your tiles on the floor first and after that grout. Then lay your wall tiles ensuring that they are level as you lay. Once the toilet tiles have been cut and laid, grout all your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your bathroom vanity ensuring it can be level and sealed around the top with silicone and in addition seal around the tub. Tip: make sure they have been in the right place when you drill to your tiles.
New home designs latest.: home design ideas.
Spectacular modern mountain home in Park City, Utah  Foyers and Mudrooms  Pinterest  Home

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring things are all fitted correctly which there isn't any leaks in your plumbing. - Enjoy a new bathroom.

Comments