New false ceiling designs ideas for bedroom 2019 with LED lights

Fall Ceiling Designs For Bedroom 7 Latest And Modern False Ceiling Designs New false ceiling designs ideas for bedroom 2019 with LED lights

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms in the home and they are also certainly the most costly to renovate. Bathroom renovation is often a job that, if done well, can also add value to your home as well as a great space full of design and lightweight.
New false ceiling designs ideas for bedroom 2019 with LED lights

Bathroom design
Bathroom design is the first section of your bathroom renovation you need to get right. Just replacing the existing bathroom with the same design might not be enough. The key to great bathroom design is usually to design it with all the people that are likely to utilize it in mind. However make certain that your bathrooms design even offers an over-all use factor too.

For example: If you were designing a bathroom for families you may still design the restroom with comfortable access towards the shower and bath. This would make certain that the structure would work if you have limited mobility. This means if you opt to sell your home or if you happen to be renovating for profit your design includes a wider market appeal. Great bathroom design also uses space well, taking into consideration the sunshine or window space, size of fittings, and drainage options. Draw out an idea to scale and right down the sizes of your room. Mark the present drainage points after which and water inlet points. Write down a wish report on the toilet fittings to need and need using their sizes. Now marry both together and discover what fits. Note: Most bathroom drainage and water inlet points can be moved but this may come at extra expense.
Bedroom  Residential  Bedroom false ceiling design, Bedroom bed design, False ceiling design

Bathroom remodel
If you've decided to accomplish the task yourself or part of the task it really is time to work with a skip bin and pull out the existing bathroom. If your house was developed pre 1980 you could have fibro bathroom wall linings with asbestos inside it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing available you'll not ought to turn the lake off for the complete house. Also you will likely need to jack hammer the floor tiles up and also the sand and cement bed they are laid on.
Gyproc ‪‎falseceiling‬ can completely change your bedroom  give it a refined and modern look

Bathroom Renovation and construction
Bathrooms must be construction properly in the ground-up to make sure that the finished job is correct and true. This also ensures the design and appear of the lavatory may have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof the ground and shower and bath recess.

Correct nov the ground with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Gyproc ‪‎falseceiling‬ can completely change your bedroom  give it a refined and modern look


Paint ceiling and final  one - Plumbing and electrical
At this time new plumbing is installed for clean cold and warm water and drainage. Careful attention must be taken when positioning the newest plumbing so your plumbing fittings are correct once the tiling is fully gone. For example: To centre a fitting in the shower recess you need to take into consideration the thickness of the wall board, tile glue and tile therefore the fitting will probably be centred after the tiles are set up. The same pertains to installing drainage pipes for a toilet; the wall lining and tile thickness must be considered therefore the pipe is incorporated in the correct position once the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them for the mains power.
False Ceiling Design, False Ceiling Designing  Vasson Interior, Chennai  ID: 11802860962

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on to your new wall board having a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you happen to be laying your tiles from floor to ceiling tend not to install the cornice because this is best done after tiling. If you are not tiling on the ceiling just install the cornice following the wallboard and ceiling lining are already installed. Also if your bath is not freestanding you can now make up the frame and install the tub. Ensure the bath is installed correctly enabling the thickness of the tiles and  sure to check on all linings and pipes prior to deciding to continue with a bath room renovation.

Bedroom Residential Bedroom false ceiling design, Bedroom bed design, False ceiling design
New false ceiling designs ideas for bedroom 2019 with LED lights

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing the bottom be sure that the waterproofing comes 100mm in the walls. The shower recess will have to be waterproofed 100mm above the shower rose outlet. Also the tub must be waterproofed 100mm above the lip of the bath around and for the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, and so the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most significant.
Step four - Lay inside the cement screed for a floor.

Before the floor tiles can laid the floor should be smooth and fairly flat with a slight fall to the drainage outlet. To do this you must use sand and cement mix and it's also advisable to include a waterproofing agent into this as well. With a level, set the ground level at the doorway. Use the top aluminum angle because the finished floor level and measure around the thickness with the tile plus 10mm to the glue. Mark around the lavatory with a level and then screed within your sand and cement mix using a 1 to 3 degree fall on the top with the drain outlet. Take your time and get it right with the finished level as smooth as you possibly can. When the sand cement mix has set but just isn't dry (you can walk into it but you will still be a little soft) rub it over using a house brick. This will remove all the small highs and lows and appearance having a level when you go. Let the lavatory floor fully dry and after that you should have an incredible surface to tile onto. Tip: the more work you place into the floor screed the simpler your tiling will be.
Gyproc ‪‎falseceiling‬ can completely change your bedroom give it a refined and modern look
Bedroom  Residential  Bedroom false ceiling design, Bedroom bed design, False ceiling design

Step five: Tile floor and walls
Lay your tiles on the floor first and then grout. Then lay your wall tiles making sure that they are level while you lay. Once the lavatory tiles are actually cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit a new bathroom vanity making sure it's level and sealed round the top with silicone plus seal around the bath. Tip: make sure they will be in the right place before you decide to drill into your tiles.
Gyproc ‪‎falseceiling‬ can completely change your bedroom give it a refined and modern look
Gyproc ‪‎falseceiling‬ can completely change your bedroom  give it a refined and modern look

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that everything is fitted correctly and that there aren't any leaks with your plumbing. - Enjoy your bathroom.

Comments