Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms in the house and they are also one the most expensive for renovate. Bathroom renovation is really a job that, if done well, can add value to a home plus a great space full of design and lightweight.
MODIFY THIS ONE 8x11 Bathroom Floor Plan with Double Bowl Vanity Cabinet and Linens  bathrooms

Bathroom design
Bathroom design will be the first area of your bathroom renovation you ought to get right. Just replacing the present bathroom sticking with the same design might not be enough. The key to great bathroom design is always to design it while using folks that will utilize it in your mind. However ensure that your bathrooms design even offers an overall use factor too.

For example: If you were designing your bathroom for families you might still design the lavatory with comfortable access to the shower and bath. This would make sure that the design would also work for those who have limited mobility. This means if you opt to sell your home or if you are renovating for profit your design carries a wider market appeal. Great bathroom design also uses space well, looking at the light or window space, sized fittings, and drainage options. Draw out an agenda to scale and right down the sizes of the room. Mark the prevailing drainage points and after that and water inlet points. Write down a wish set of the toilet fittings to require and want with their sizes. Now marry the 2 together and discover what fits. Note: Most bathroom drainage and water inlet points might be moved but this does come at extra expense.
An Indepth Look at 8 Luxury Bathrooms

Bathroom remodel
If you have decided to perform the job yourself or part of the project it is time to employ a skip bin and pull out the old bathroom. If your home appeared pre 1980 you could have fibro bathroom wall linings with asbestos inside it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing set up you won't have to turn water off for the complete house. Also you should jack hammer the bottom tiles up and the sand and cement bed actually laid on.
Four Master Bathroom Remodeling Tips – MGZ

Bathroom Renovation and construction
Bathrooms has to be construction properly through the ground up to ensure that the finished job is correct and true. This also ensures the style and look of the bathroom may have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bath hob and bath.

Waterproof the ground and shower and bath recess.

Correct nov a floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
10 best Jack and Jill bathroom floor plans images on Pinterest  Bathroom floor plans, Bathroom


Paint ceiling and final  one - Plumbing and electrical
At this time new plumbing is installed for clean hot and cold water and drainage. Careful attention has to be taken when positioning the new plumbing so the plumbing fittings are correct once the tiling ends. For example: To centre a fitting in the shower recess you have to consider the thickness with the wall board, tile glue and tile therefore the fitting will likely be centred as soon as the tiles are available. The same applies to installing drainage pipes for any toilet; the wall lining and tile thickness must be taken into account therefore the pipe is in the correct position once the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them for the mains power.
Bathroom Floor Plans  Bathroom Floor Plan Design Gallery

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on to your new wall board which has a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling tend not to install the cornice because this is most effectively achieved after tiling. If you happen to be not tiling towards the ceiling go on and install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding it's simple to make up the frame and install the bathtub. Ensure the bath is installed correctly permitting the thickness from the tiles and  sure to evaluate all linings and pipes before you decide to continue with your bathrooms renovation.

An Indepth Look at 8 Luxury Bathrooms
MODIFY THIS ONE 8x11 Bathroom Floor Plan with Double Bowl Vanity Cabinet and Linens  bathrooms

Step three - Waterproof your bathrooms
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the floor make certain that the waterproofing comes 100mm up the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the bath needs to be waterproofed 100mm higher than the lip from the bath around and towards the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, so the all water will simply drop a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most important.
Step four - Lay within the cement screed for the floor.

Before the bottom tiles can laid a floor has to be smooth and fairly flat with a slight fall towards the drainage outlet. To do this you must use sand and cement mix which is far better to give a waterproofing agent into this too. With a level, set the floor level at the doorway. Use the top aluminum angle since the finished floor level and measure along the thickness of the tile plus 10mm for the glue. Mark around the bathroom with a level and after that screed within your sand and cement mix which has a 1 to 3 degree fall to the top of the drain outlet. Take your time and have it right while using finished level as smooth as you possibly can. When the sand cement mix has set but is just not dry (you can walk onto it nevertheless, you will still be a little soft) rub it over with a house brick. This will remove every one of the small highs and lows and appearance with a level when you go. Let the lavatory floor fully dry and after that you should have a great surface to tile onto. Tip: greater work you place into the bottom screed the simpler your tiling is going to be.
Four Master Bathroom Remodeling Tips – MGZ
An Indepth Look at 8 Luxury Bathrooms

Step five: Tile floor and walls
Lay your tiles on the floor first after which grout. Then lay your wall tiles ensuring that they are level because you lay. Once the restroom tiles have been cut and laid, grout your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring that it's level and sealed across the top with silicone and in addition seal around the bath. Tip: make sure they come in the right place when you drill in your tiles.
10 best Jack and Jill bathroom floor plans images on Pinterest Bathroom floor plans, Bathroom
Four Master Bathroom Remodeling Tips – MGZ

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean making certain things are all fitted correctly which there aren't any leaks inside your plumbing. - Enjoy a new bathroom.