Modern Living Room Best Interior Design 22

Best Interior Design For Living Room Interior Design Modern Living Room Extraordinary Ideas Modern Living Modern Living Room Best Interior Design 22

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms at home and they are also certainly the most costly to renovate. Bathroom renovation is a job that, if done well, may add value with a home plus a great space brimming with design and light.
Modern Living Room Best Interior Design 22

Bathroom design
Bathroom design may be the first area of a bath room renovation you ought to get right. Just replacing the present bathroom with the same design might not be enough. The key to great bathroom design would be to design it with the folks that will apply it in mind. However be sure that your bathrooms design also offers a general use factor at the same time.

For example: If you were designing your bathroom for families you might still design the toilet with comfortable access on the shower and bath. This would be sure that the structure would also work if you have limited mobility. This means if you sell your home or if you might be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the area well, taking into consideration the light or window space, height and width of fittings, and drainage options. Draw out an agenda to scale and all the way down the sizes of the room. Mark the present drainage points and after that and water inlet points. Write down a wish list of the bathroom fittings to require and desire with their sizes. Now marry both together to see what fits. Note: Most bathroom drainage and water inlet points might be moved but this certainly does come at expense.
35 Beautiful Modern Living Room Interior Design examples

Bathroom remodel
If you have decided to complete the job yourself or part of the task it's time to hire a skip bin and pull out the previous bathroom. If your property is made pre 1980 maybe you have fibro bathroom wall linings with asbestos inside it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing set up you will not ought to turn the water off for the complete house. Also you will likely need to jack hammer the bottom tiles up and the sand and cement bed that they're laid on.
35 Modern Living Room Designs For 2017 / 2018  Living Room

Bathroom Renovation and construction
Bathrooms must be construction properly from your start to ensure that the finished job is correct and true. This also ensures the structure and appearance of the lavatory can have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the tub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct late the floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
35 Modern Living Room Designs For 2017 / 2018  Living Room


Paint ceiling and final  one - Plumbing and electrical
At this aspect new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the newest plumbing so that the plumbing fittings are correct if the tiling is completed. For example: To centre a fitting in a very shower recess you have to take into account the thickness with the wall board, tile glue and tile and so the fitting will be centred following the tiles are in place. The same refers to installing drainage pipes to get a toilet; the wall lining and tile thickness have to be taken into consideration and so the pipe is within the correct position in the event the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
50 Excellent Modern Design Ideas For Living Room  Interior Design Inspirations

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout onto your new wall board which has a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you're laying your tiles from floor to ceiling tend not to install the cornice as this is best done after tiling. If you're not tiling to the ceiling just install the cornice as soon as the wallboard and ceiling lining are already installed. Also if your bath isn't freestanding anyone can make up the frame and install the bath. Ensure the bathtub is installed correctly making it possible for the thickness of the tiles and  sure to test all linings and pipes before you decide to continue with your bathrooms renovation.

35 Beautiful Modern Living Room Interior Design examples
Modern Living Room Best Interior Design 22

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing a floor make sure that the waterproofing comes 100mm inside the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the bathtub needs to be waterproofed 100mm higher than the lip with the bath right around and on the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, so the all water will still only go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most crucial.
Step four - Lay inside cement screed for the ground.

Before the floor tiles can laid a floor must be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you should use sand and cement mix and it is far better to put in a waterproofing agent into this as well. With a level, set the ground level with the doorway. Use the top aluminum angle because the finished floor level and measure on the thickness from the tile plus 10mm to the glue. Mark around the restroom with a level then screed with your sand and cement mix using a 1 to 3 degree fall for the top with the drain outlet. Take your time and get it right with all the finished level as smooth as is possible. When the sand cement mix has set but isn't dry (you are able to walk on it however you it's still somewhat soft) rub it over using a house brick. This will remove all the small highs and lows and appearance which has a level when you go. Let the lavatory floor fully dry then you must have an incredible surface to tile onto. Tip: the harder work you add into the ground screed the more your tiling will likely be.
35 Modern Living Room Designs For 2017 / 2018 Living Room
35 Beautiful Modern Living Room Interior Design examples

Step five: Tile floor and walls
Lay your tiles on a floor first and then grout. Then lay your wall tiles making certain that they're level because you lay. Once the bathroom tiles are actually cut and laid, grout your entire tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your bathroom vanity ensuring it is level and sealed round the top with silicone and in addition seal around the bath. Tip: make sure they come in the right place when you drill in your tiles.
35 Modern Living Room Designs For 2017 / 2018 Living Room
35 Modern Living Room Designs For 2017 / 2018  Living Room

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean making certain things are fitted correctly understanding that there are no leaks with your plumbing. - Enjoy your brand-new bathroom.

Comments