Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms in the home and they are also certainly the most expensive for renovate. Bathroom renovation is really a job that, if done well, can also add value to some home plus a great space brimming with design and light.
Modern 2 Story House Plans Modern Contemporary House Design, modern two storey house designs

Bathroom design
Bathroom design may be the first section of a bath room renovation you need to get right. Just replacing the current bathroom sticking with the same design may not be enough. The key to great bathroom design is usually to design it while using people that are likely to utilize it in your mind. However make sure that your bathrooms design even offers an over-all use factor also.

For example: If you were designing a bath room for families you can still design the bathroom with easy accessibility for the shower and bath. This would make sure that the structure would work for those who have limited mobility. This means if you choose to sell your home or if you happen to be renovating for profit your design includes a wider market appeal. Great bathroom design also uses space well, taking into consideration the lighting or window space, height and width of fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of one's room. Mark the prevailing drainage points then and water inlet points. Write down a wish report on the lavatory fittings to require and need using sizes. Now marry both the together and see what fits. Note: Most bathroom drainage and water inlet points might be moved but this will come at expense.
Story Modern House Plans Home Designs Design  House Plans  39640

Bathroom remodel
If you've decided to accomplish the task yourself or part of the job it really is time to engage a skip bin and pull out the old bathroom. If your house was made pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in place you'll not ought to turn the lake off for the entire house. Also you will need to jack hammer the floor tiles up along with the sand and cement bed actually laid on.
Modern Minimalist 2 Floor House Design  2019 Ideas

Bathroom Renovation and construction
Bathrooms must be construction properly from the ground-up to make certain that the finished job is correct and true. This also ensures the look and search of the toilet could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct nov the floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Best Of 2 Story Modern House Floor Plans  New Home Plans Design


Paint ceiling and final  one - Plumbing and electrical
At now many new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the brand new plumbing in order that the plumbing fittings are correct once the tiling is finished. For example: To centre a fitting in a very shower recess you have to take into account the thickness of the wall board, tile glue and tile hence the fitting will be centred following the tiles are available. The same pertains to installing drainage pipes for any toilet; the wall lining and tile thickness has to be taken into account and so the pipe is incorporated in the correct position when the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them on the mains power.
Metricon Home Designs: The Elysian. Visit www.localbuilders.com.au/builders_nsw.htm to find your

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout onto your new wall board which has a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you might be laying your tiles from floor to ceiling tend not to install the cornice because this is most effectively achieved after tiling. If you're not tiling on the ceiling go on and install the cornice as soon as the wallboard and ceiling lining have been installed. Also if your bath isn't freestanding anyone can form the frame and install the bath. Ensure the tub is installed correctly enabling the thickness with the tiles and  sure to check on all linings and pipes prior to deciding to continue with your bathroom renovation.

Story Modern House Plans Home Designs Design House Plans 39640
Modern 2 Story House Plans Modern Contemporary House Design, modern two storey house designs

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing a floor make certain that the waterproofing comes 100mm inside the walls. The shower recess should be waterproofed 100mm across the shower rose outlet. Also the bath should be waterproofed 100mm over the lip in the bath right around and towards the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, so the all water will only drop a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay inside cement screed for the floor.

Before the floor tiles can laid the ground have to be smooth and fairly flat using a slight fall to the drainage outlet. To do this you must use sand and cement mix which is better to put in a waterproofing agent into this at the same time. With a level, set the bottom level in the doorway. Use the top aluminum angle because finished floor level and measure along the thickness with the tile plus 10mm for that glue. Mark about the bathroom having a level and after that screed with your sand and cement mix with a 1 to 3 degree fall on the top from the drain outlet. Take your time and obtain it right using the finished level as smooth as possible. When the sand cement mix has set but is not dry (you can walk about it however, you it's still a lttle bit soft) rub it over using a house brick. This will remove each of the small highs and lows and appearance which has a level while you go. Let the restroom floor fully dry after which you really should have an excellent surface to tile onto. Tip: the more work you set into a floor screed the more your tiling will probably be.
Modern Minimalist 2 Floor House Design 2019 Ideas
Story Modern House Plans Home Designs Design  House Plans  39640

Step five: Tile floor and walls
Lay your tiles on the ground first then grout. Then lay your wall tiles making sure they are level while you lay. Once the bathroom tiles happen to be cut and laid, grout all your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your bathroom vanity ensuring that it can be level and sealed round the top with silicone as well as seal around the bathtub. Tip: make sure they will be in the right place before you drill in your tiles.
Best Of 2 Story Modern House Floor Plans New Home Plans Design
Modern Minimalist 2 Floor House Design  2019 Ideas

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring everything is fitted correctly understanding that there isn't any leaks within your plumbing. - Enjoy a new bathroom.