Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house and they are generally also certainly the most expensive for renovate. Bathroom renovation is a job that, if done well, can add value to a home as well as a great space packed with design and lightweight.
Mediterranean MultiFamily House Plan  66174GW  1st Floor Master Suite, Butler Walkin Pantry

Bathroom design
Bathroom design may be the first section of a bath room renovation you need right. Just replacing the present bathroom with the same design will not be enough. The key to great bathroom design is to design it with the people that will certainly utilize it at heart. However make sure that your bathroom design boasts an overall use factor at the same time.

For example: If you were designing your bathrooms for families you could still design the lavatory with quick access for the shower and bath. This would make sure that the structure would also work for people with limited mobility. This means if you decide to sell your property or if you're renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, taking into account the light or window space, size of fittings, and drainage options. Draw out a plan to scale and down the sizes of one's room. Mark the existing drainage points and after that and water inlet points. Write down a wish set of the lavatory fittings to want and need with their sizes. Now marry both the together and discover what fits. Note: Most bathroom drainage and water inlet points may be moved but this does come at extra cost.
3D House View

Bathroom remodel
If you have chosen to perform the job yourself or part of the project it's time to engage a skip bin and pull out the previous bathroom. If your home was developed pre 1980 you might have fibro bathroom wall linings with asbestos in it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing set up you won't have to turn the lake off for the whole house. Also you should jack hammer a floor tiles up as well as the sand and cement bed that they are laid on.
Dryden  Single Family Home Floor Plans  Claridge Homes

Bathroom Renovation and construction
Bathrooms should be construction properly in the ground up to ensure that the finished job is correct and true. This also ensures the structure and look of the bathroom can have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the tub hob and bath.

Waterproof the floor and shower and bath recess.

Correct nov the ground with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Single Family Residential House Plans  Wonderlandworkshops Weblog


Paint ceiling and final  one - Plumbing and electrical
At this aspect brand new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the newest plumbing so that the plumbing fittings are correct once the tiling is finished. For example: To centre a fitting inside a shower recess you must take into consideration the thickness from the wall board, tile glue and tile hence the fitting will likely be centred following the tiles are in place. The same applies to installing drainage pipes for any toilet; the wall lining and tile thickness has to be taken into consideration so the pipe is within the correct position once the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
House Plan 1202230 : 4 Bedroom, 2607 Sq Ft Craftsman  Traditional Home  TPC

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on to your new wall board having a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling don't install the cornice as this is most effectively achieved after tiling. If you happen to be not tiling on the ceiling go ahead and install the cornice as soon as the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding anyone can from the frame and install the bathtub. Ensure the bathtub is installed correctly enabling the thickness of the tiles and  sure to check all linings and pipes before you continue with your bathroom renovation.

3D House View
Mediterranean MultiFamily House Plan  66174GW  1st Floor Master Suite, Butler Walkin Pantry

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the bottom make sure that the waterproofing comes 100mm the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the bath ought to be waterproofed 100mm higher than the lip in the bath around and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, and so the all water will only decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most critical.
Step four - Lay in the cement screed for the ground.

Before a floor tiles can laid a floor has to be smooth and fairly flat using a slight fall for the drainage outlet. To do this you must use sand and cement mix in fact it is far better to put in a waterproofing agent into this also. With a level, set a floor level at the doorway. Use the top aluminum angle because finished floor level and measure on the thickness in the tile plus 10mm for that glue. Mark about the bathroom which has a level after which screed within your sand and cement mix with a 1 to 3 degree fall for the top from the drain outlet. Take your time and obtain it right using the finished level as smooth as you can. When the sand cement mix has set but just isn't dry (you are able to walk about it however, you it is still a little soft) rub it over which has a house brick. This will remove all the small highs and lows and appearance having a level while you go. Let the lavatory floor fully dry after which you needs to have an incredible surface to tile onto. Tip: the greater work you set into a floor screed the easier your tiling is going to be.
Dryden Single Family Home Floor Plans Claridge Homes
3D House View

Step five: Tile floor and walls
Lay your tiles on a floor first then grout. Then lay your wall tiles making certain that they're level while you lay. Once the restroom tiles are actually cut and laid, grout all of your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your bathroom vanity making sure it is level and sealed round the top with silicone and also seal around the bathtub. Tip: make sure they are in the right place before you drill into the tiles.
Single Family Residential House Plans Wonderlandworkshops Weblog
Dryden  Single Family Home Floor Plans  Claridge Homes

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring things are fitted correctly knowning that there isn't any leaks in your plumbing. - Enjoy a new bathroom.