Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home plus they are also certainly the most expensive for renovate. Bathroom renovation is really a job that, if done well, can add value with a home as well as a great space packed with design and lightweight.
Master bedroom designs in white – modern home interior ideas

Bathroom design
Bathroom design will be the first part of a bath room renovation you need to get right. Just replacing the prevailing bathroom with the same design may not be enough. The key to great bathroom design is to design it using the people that will apply it at heart. However be sure that a bath room design also has an over-all use factor as well.

For example: If you were designing a bathroom for families you may still design the toilet with quick access on the shower and bath. This would be sure that the style would also work for people with limited mobility. This means if you decide to sell your house or if you might be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the space well, taking into consideration the sunlight or window space, sized fittings, and drainage options. Draw out a strategy to scale and right down the sizes of your respective room. Mark the present drainage points and then and water inlet points. Write down a wish set of the lavatory fittings to want and desire making use of their sizes. Now marry both the together and see what fits. Note: Most bathroom drainage and water inlet points can be moved but this does come at extra cost.
15 Master Bedroom Interior Design  Pooja Room and Rangoli Designs

Bathroom remodel
If you decide to perform the job yourself or part of the job it's time to employ a skip bin and take out the previous bathroom. If your own home was made pre 1980 you could have fibro bathroom wall linings with asbestos within it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing available you do not must turn the water off for the whole house. Also you should jack hammer the bottom tiles up as well as the sand and cement bed that they're laid on.
Bedroom Ideas: 52 Modern Design Ideas for your Bedroom  The LuxPad

Bathroom Renovation and construction
Bathrooms has to be construction properly in the ground-up to make sure that the finished job is correct and true. This also ensures the style and search of the toilet can have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bathtub hob and bath.

Waterproof the floor and shower and bath recess.

Correct december the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Great luxury master bedroom ideas  GreenVirals Style


Paint ceiling and final  one - Plumbing and electrical
At this aspect new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the brand new plumbing so that the plumbing fittings are correct once the tiling ends. For example: To centre a fitting in a shower recess you need to consider the thickness with the wall board, tile glue and tile and so the fitting will be centred following your tiles are in place. The same refers to installing drainage pipes for the toilet; the wall lining and tile thickness has to be considered therefore the pipe is within the correct position if the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them for the mains power.
Fresh Modern Master Bedroom Interior Design  Creative Maxx Ideas

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on to your new wall board which has a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because this is best done after tiling. If you happen to be not tiling to the ceiling go on and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath is just not freestanding you can now from the frame and install the bath. Ensure the tub is installed correctly enabling the thickness from the tiles and  sure to check on all linings and pipes prior to deciding to continue with a bath room renovation.

15 Master Bedroom Interior Design Pooja Room and Rangoli Designs
Master bedroom designs in white – modern home interior ideas

Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing a floor make certain that the waterproofing comes 100mm up the walls. The shower recess must be waterproofed 100mm above the shower rose outlet. Also the bath needs to be waterproofed 100mm over the lip of the bath about and towards the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, and so the all water will only go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most crucial.
Step four - Lay inside cement screed for a floor.

Before the ground tiles can laid the ground has to be smooth and fairly flat using a slight fall on the drainage outlet. To do this you have to use sand and cement mix and it is better to include a waterproofing agent into this too. With a level, set the floor level at the doorway. Use the top aluminum angle because the finished floor level and measure down the thickness with the tile plus 10mm to the glue. Mark right around the toilet having a level after which screed in your sand and cement mix with a 1 to 3 degree fall on the top in the drain outlet. Take your time and get it right with all the finished level as smooth as possible. When the sand cement mix has set but isn't dry (it is possible to walk onto it however, you it is a bit soft) rub it over which has a house brick. This will remove all of the small highs and lows and appearance which has a level while you go. Let the toilet floor fully dry then you needs to have a great surface to tile onto. Tip: the greater work you put into the bottom screed the simpler your tiling will probably be.
Bedroom Ideas: 52 Modern Design Ideas for your Bedroom The LuxPad
15 Master Bedroom Interior Design  Pooja Room and Rangoli Designs

Step five: Tile floor and walls
Lay your tiles on the ground first then grout. Then lay your wall tiles making certain that they are level as you lay. Once the bathroom tiles happen to be cut and laid, grout your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit a new bathroom vanity making certain it's level and sealed around the top with silicone and also seal around the tub. Tip: make sure they will be in the right place prior to deciding to drill to your tiles.
Great luxury master bedroom ideas GreenVirals Style
Bedroom Ideas: 52 Modern Design Ideas for your Bedroom  The LuxPad

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring things are fitted correctly understanding that there aren't any leaks within your plumbing. - Enjoy your new bathroom.

Comments