Luxury Small Studio Apartment Design Combined Modern and Minimalist Style Decor Looks Stunning

Luxury Apartment Interior Design Luxury Apartment Interior Design Hd Luxury Apartment Design Luxury Small Studio Apartment Design Combined Modern and Minimalist Style Decor Looks Stunning

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home and they are also the most costly to renovate. Bathroom renovation can be a job that, if done well, may add value to your home along with a great space filled with design and light-weight.
Luxury Small Studio Apartment Design Combined Modern and Minimalist Style Decor Looks Stunning

Bathroom design
Bathroom design may be the first part of a bath room renovation you ought to get right. Just replacing the present bathroom sticking with the same design will not be enough. The key to great bathroom design is to design it with all the individuals who are going to use it planned. However be sure that a bath room design also offers an overall use factor as well.

For example: If you were designing a bathroom for families you might still design the lavatory with easy access on the shower and bath. This would ensure that the style would also work for people with limited mobility. This means if you decide to sell your house or if you happen to be renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, taking into consideration the sunlight or window space, size of fittings, and drainage options. Draw out a plan to scale and down the sizes of the room. Mark the prevailing drainage points and then and water inlet points. Write down a wish listing of the toilet fittings to wish and wish using their sizes. Now marry both together to see what fits. Note: Most bathroom drainage and water inlet points can be moved but this does come at extra cost.
Ultra Luxury Apartment Design

Bathroom remodel
If you've decided to perform the work yourself or part of the task it can be time to hire a skip bin and take out that old bathroom. If your house was made pre 1980 you may have fibro bathroom wall linings with asbestos inside it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing set up you do not have to turn the lake off for the entire house. Also you will need to jack hammer the floor tiles up and also the sand and cement bed actually laid on.
Mixathem: november 2010

Bathroom Renovation and construction
Bathrooms must be construction properly through the ground up to make sure that the finished job is correct and true. This also ensures the structure and appearance of the bathroom could have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof the ground and shower and bath recess.

Correct december the bottom with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Veladores Normales 5  Dormitorios de Matrimonio Moderno  Dormitorios de matrimonio modernos


Paint ceiling and final  one - Plumbing and electrical
At now all new plumbing is installed for clean cold and hot water and drainage. Careful attention should be taken when positioning the newest plumbing so the plumbing fittings are correct once the tiling is completed. For example: To centre a fitting in the shower recess you need to think about the thickness in the wall board, tile glue and tile hence the fitting will probably be centred following your tiles are in position. The same applies to installing drainage pipes for any toilet; the wall lining and tile thickness has to be looked at so the pipe is within the correct position in the event the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
Ultra Luxury Apartment Design

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board with a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you happen to be laying your tiles from floor to ceiling do not install the cornice because done after tiling. If you're not tiling to the ceiling go on and install the cornice following the wallboard and ceiling lining are already installed. Also if your bath isn't freestanding now you can from the frame and install the bathtub. Ensure the bath is installed correctly making it possible for the thickness of the tiles and  sure to test all linings and pipes before you decide to continue with your bathroom renovation.

Ultra Luxury Apartment Design
Luxury Small Studio Apartment Design Combined Modern and Minimalist Style Decor Looks Stunning

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the ground be sure that the waterproofing comes 100mm inside the walls. The shower recess should be waterproofed 100mm across the shower rose outlet. Also the tub must be waterproofed 100mm over the lip of the bath right around and to the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, therefore the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most significant.
Step four - Lay in the cement screed for a floor.

Before the ground tiles can laid the ground have to be smooth and fairly flat which has a slight fall on the drainage outlet. To do this you have to use sand and cement mix in fact it is advisable to give a waterproofing agent into this at the same time. With a level, set a floor level with the doorway. Use the top aluminum angle because the finished floor level and measure around the thickness with the tile plus 10mm to the glue. Mark right around the toilet using a level then screed in your sand and cement mix having a 1 to 3 degree fall towards the top of the drain outlet. Take your time and get it right while using finished level as smooth as possible. When the sand cement mix has set but is not dry (you are able to walk about it nevertheless, you it is a little soft) rub it over which has a house brick. This will remove all the small highs and lows and check having a level as you go. Let the bathroom floor fully dry then you needs to have a great surface to tile onto. Tip: the more work you add into the bottom screed the simpler your tiling will probably be.
Mixathem: november 2010
Ultra Luxury Apartment Design

Step five: Tile floor and walls
Lay your tiles on the bottom first then grout. Then lay your wall tiles ensuring that that they're level as you lay. Once the lavatory tiles happen to be cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your brand-new bathroom vanity making sure it is level and sealed around the top with silicone plus seal around the tub. Tip: make sure they will be in the right place prior to deciding to drill into your tiles.
Veladores Normales 5 Dormitorios de Matrimonio Moderno Dormitorios de matrimonio modernos
Mixathem: november 2010

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring that it is all totally fitted correctly and that there aren't any leaks in your plumbing. - Enjoy your bathroom.

Comments