Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms inside your home and they are generally also the most costly to renovate. Bathroom renovation is often a job that, if done well, will add value to a home and a great space packed with design and lightweight.
Luxury master bedroom by Pure Art

Bathroom design
Bathroom design may be the first section of your bathrooms renovation you need to get right. Just replacing the existing bathroom with the exact same design may not be enough. The key to great bathroom design is to design it while using people who will certainly use it in your mind. However make sure that a bath room design also offers a broad use factor also.

For example: If you were designing a bathroom for families you may still design the toilet with easy accessibility on the shower and bath. This would be sure that the style would work for those who have limited mobility. This means if you choose to sell your property or if you're renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, looking at the lighting or window space, sized fittings, and drainage options. Draw out a plan to scale and down the sizes of your respective room. Mark the present drainage points and after that and water inlet points. Write down a wish set of the lavatory fittings to require and need making use of their sizes. Now marry both together to see what fits. Note: Most bathroom drainage and water inlet points might be moved but this certainly does come at expense.
Master Bedrooms with luxury bathrooms  Inspiration and Ideas from Maison Valentina

Bathroom remodel
If you decide to accomplish the task yourself or part of the task it can be time to work with a skip bin and pull out that old bathroom. If your property appeared pre 1980 maybe you have fibro bathroom wall linings with asbestos inside and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing set up you do not have to turn the water off for the complete house. Also you will have to jack hammer the bottom tiles up and the sand and cement bed actually laid on.
37 Clever Small Master Bedroom Ideas Photos

Bathroom Renovation and construction
Bathrooms must be construction properly in the ground-up to be sure that the finished job is correct and true. This also ensures the look and search of the toilet may have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof a floor and shower and bath recess.

Correct the fall of the floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
South Shore Decorating Blog: Master Bedroom Full Reveal  many beautiful pictures from different


Paint ceiling and final  one - Plumbing and electrical
At this time brand new plumbing is installed for clean hot and cold water and drainage. Careful attention needs to be taken when positioning the modern plumbing so that the plumbing fittings are correct once the tiling is completed. For example: To centre a fitting inside a shower recess you need to think about the thickness in the wall board, tile glue and tile so the fitting will be centred after the tiles are in position. The same refers to installing drainage pipes for any toilet; the wall lining and tile thickness must be taken into consideration hence the pipe is incorporated in the correct position in the event the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
Tuscan Bedroom Decorating Ideas and Photos

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout onto your new wall board using a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you happen to be laying your tiles from floor to ceiling don't install the cornice because most effectively achieved after tiling. If you are not tiling on the ceiling just install the cornice following the wallboard and ceiling lining have been installed. Also if your bath isn't freestanding you can now make up the frame and install the bathtub. Ensure the tub is installed correctly enabling the thickness with the tiles and  sure to test all linings and pipes prior to deciding to continue with your bathrooms renovation.

Master Bedrooms with luxury bathrooms Inspiration and Ideas from Maison Valentina
Luxury master bedroom by Pure Art

Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing a floor make sure that the waterproofing comes 100mm inside the walls. The shower recess must be waterproofed 100mm across the shower rose outlet. Also the bathtub should be waterproofed 100mm across the lip in the bath right around and to the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, and so the all water will simply go lower a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most crucial.
Step four - Lay inside cement screed for the floor.

Before the ground tiles can laid the ground have to be smooth and fairly flat with a slight fall towards the drainage outlet. To do this you must use sand and cement mix in fact it is best to give a waterproofing agent into this at the same time. With a level, set the ground level on the doorway. Use the top aluminum angle since the finished floor level and measure along the thickness in the tile plus 10mm for your glue. Mark around the toilet using a level then screed within your sand and cement mix with a 1 to 3 degree fall on the top from the drain outlet. Take your time and obtain it right with the finished level as smooth as possible. When the sand cement mix has set but is just not dry (you can walk on it but you it's still somewhat soft) rub it over having a house brick. This will remove all the small highs and lows and check having a level as you go. Let the toilet floor fully dry and then you should have a fantastic surface to tile onto. Tip: the more work you place into the bottom screed the more your tiling is going to be.
37 Clever Small Master Bedroom Ideas Photos
Master Bedrooms with luxury bathrooms  Inspiration and Ideas from Maison Valentina

Step five: Tile floor and walls
Lay your tiles on the ground first and then grout. Then lay your wall tiles making certain that they are level because you lay. Once the bathroom tiles have been cut and laid, grout all of your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your bathroom vanity ensuring it really is level and sealed round the top with silicone and also seal around the bath. Tip: make sure they are in the right place prior to deciding to drill into your tiles.
South Shore Decorating Blog: Master Bedroom Full Reveal many beautiful pictures from different
37 Clever Small Master Bedroom Ideas Photos

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring things are fitted correctly and that there won't be any leaks within your plumbing. - Enjoy a new bathroom.