Lowe’s Spring Makeover Reveal! Bold Style Living room decor, Home living room, Living room

How To Decorate A Small Living Room With A Fireplace Design Ideas Lowe’s Spring Makeover Reveal! Bold Style Living room decor, Home living room, Living room

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms in the home and they are also the most expensive for renovate. Bathroom renovation is a job that, if done well, can add value with a home and a great space packed with design and light.
Lowe’s Spring Makeover Reveal!  Bold Style  Living room decor, Home living room, Living room

Bathroom design
Bathroom design could be the first part of your bathrooms renovation you should get right. Just replacing the existing bathroom sticking with the same design may not be enough. The key to great bathroom design is to design it with the folks that will put it to use in mind. However make certain that your bathroom design boasts an over-all use factor as well.

For example: If you were designing your bathroom for families you can still design the restroom with comfortable access towards the shower and bath. This would make sure that the design would also work for people with limited mobility. This means if you choose to sell your home or if you're renovating for profit your design has a wider market appeal. Great bathroom design also uses the space well, taking into consideration the sunshine or window space, sized fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of your room. Mark the current drainage points and after that and water inlet points. Write down a wish set of the toilet fittings to require and want making use of their sizes. Now marry both the together and find out what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at extra expense.
Mantel decorating ideas for spring and summer  Decorology

Bathroom remodel
If you decide to perform the project yourself or part of the work it really is time to hire a skip bin and take out the existing bathroom. If your home appeared pre 1980 you could have fibro bathroom wall linings with asbestos within it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing set up you do not need to turn water off for the complete house. Also you will need to jack hammer the ground tiles up along with the sand and cement bed that they're laid on.
asymmetrical living room  interior spaces  Pinterest  Living room layouts, Corner and Fireplaces

Bathroom Renovation and construction
Bathrooms have to be construction properly in the start to ensure that the finished job is correct and true. This also ensures the structure and appearance of the toilet can have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct late the floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Small Living Room Ideas – IKEA Home Tour Episode 212  YouTube


Paint ceiling and final  one - Plumbing and electrical
At this time brand new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the modern plumbing so your plumbing fittings are correct when the tiling ends. For example: To centre a fitting in a shower recess you have to take into account the thickness of the wall board, tile glue and tile so the fitting is going to be centred as soon as the tiles are available. The same relates to installing drainage pipes for a toilet; the wall lining and tile thickness must be looked at so the pipe is within the correct position once the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them to the mains power.
17+ Corner Fireplace Designs, Ideas  Design Trends  Premium PSD, Vector Downloads

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board with a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you are laying your tiles from floor to ceiling don't install the cornice because done after tiling. If you might be not tiling on the ceiling go ahead and install the cornice after the wallboard and ceiling lining happen to be installed. Also if your bath just isn't freestanding anyone can from the frame and install the tub. Ensure the bathtub is installed correctly permitting the thickness of the tiles and  sure to check all linings and pipes before you continue with your bathrooms renovation.

Mantel decorating ideas for spring and summer Decorology
Lowe’s Spring Makeover Reveal!  Bold Style  Living room decor, Home living room, Living room

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the bath. When waterproofing the bottom make sure that the waterproofing comes 100mm in the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the bathtub ought to be waterproofed 100mm across the lip from the bath right around and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water is only going to drop a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most significant.
Step four - Lay within the cement screed for the ground.

Before the floor tiles can laid the ground must be smooth and fairly flat with a slight fall towards the drainage outlet. To do this you need to use sand and cement mix and it's also advisable to add a waterproofing agent into this at the same time. With a level, set a floor level at the doorway. Use the top aluminum angle since the finished floor level and measure around the thickness from the tile plus 10mm for your glue. Mark about the lavatory using a level then screed inside your sand and cement mix with a 1 to 3 degree fall for the top from the drain outlet. Take your time and get it right with all the finished level as smooth as is possible. When the sand cement mix has set but is just not dry (you'll be able to walk about it however you it is a lttle bit soft) rub it over having a house brick. This will remove all of the small highs and lows and check which has a level as you go. Let the lavatory floor fully dry then you needs to have a great surface to tile onto. Tip: the more work you place into the ground screed the more your tiling is going to be.
asymmetrical living room interior spaces Pinterest Living room layouts, Corner and Fireplaces
Mantel decorating ideas for spring and summer  Decorology

Step five: Tile floor and walls
Lay your tiles on the floor first then grout. Then lay your wall tiles making sure that they're level as you lay. Once the toilet tiles happen to be cut and laid, grout your entire tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit a new bathroom vanity ensuring it can be level and sealed throughout the top with silicone as well as seal around the bathtub. Tip: make sure they come in the right place before you decide to drill to your tiles.
Small Living Room Ideas – IKEA Home Tour Episode 212 YouTube
asymmetrical living room  interior spaces  Pinterest  Living room layouts, Corner and Fireplaces

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring that everything is fitted correctly which there are no leaks inside your plumbing. - Enjoy a new bathroom.

Comments