log home interiors mountain+cabin Great Interior Design Greats interior design if

Log Homes Interior Designs Log Homes Interior Designs Log Cabin Homes Designs Decor Information log home interiors mountain+cabin Great Interior Design Greats interior design if

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the home and they are also one the most costly to renovate. Bathroom renovation can be a job that, if done well, will add value with a home plus a great space filled with design and lightweight.
log home interiors  mountain+cabin  Great Interior Design  Greats interior design   if

Bathroom design
Bathroom design will be the first section of your bathrooms renovation you need to get right. Just replacing the present bathroom with the exact same design will not be enough. The key to great bathroom design is always to design it with the individuals who are likely to utilize it in your mind. However make certain that a bath room design boasts a broad use factor at the same time.

For example: If you were designing your bathrooms for families you can still design the toilet with easy accessibility on the shower and bath. This would ensure that the structure would recieve treatment for those who have limited mobility. This means if you opt to sell your property or if you might be renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, considering the light or window space, height and width of fittings, and drainage options. Draw out an agenda to scale and right down the sizes of your room. Mark the existing drainage points and then and water inlet points. Write down a wish listing of the lavatory fittings to wish and need using their sizes. Now marry the 2 together and find out what fits. Note: Most bathroom drainage and water inlet points can be moved but this certainly does come at extra cost.
roger wade studio interior design photography of rustic handcrafted log home living room toward

Bathroom remodel
If you decide to accomplish the task yourself or part of the project it really is time to hire a skip bin and take out the previous bathroom. If your property is made pre 1980 you might have fibro bathroom wall linings with asbestos in it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing set up you do not ought to turn the lake off for the whole house. Also you should jack hammer a floor tiles up and the sand and cement bed that they're laid on.
Interioare rustice spectaculoase  inspiratie in imagini

Bathroom Renovation and construction
Bathrooms should be construction properly through the ground up to be sure that the finished job is correct and true. This also ensures the look and look of the lavatory can have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bath hob and bath.

Waterproof the floor and shower and bath recess.

Correct nov the floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
21 Rustic Log Cabin Interior Design Ideas  Style Motivation


Paint ceiling and final  one - Plumbing and electrical
At this aspect brand new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the modern plumbing so that the plumbing fittings are correct in the event the tiling is completed. For example: To centre a fitting in a shower recess you need to take into account the thickness from the wall board, tile glue and tile therefore the fitting will probably be centred following the tiles are in place. The same refers to installing drainage pipes for the toilet; the wall lining and tile thickness has to be taken into consideration so the pipe is in the correct position once the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
Top 60 Best Log Cabin Interior Design Ideas  Mountain Retreat Homes

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout onto your new wall board using a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you might be laying your tiles from floor to ceiling usually do not install the cornice as this is most effectively achieved after tiling. If you're not tiling on the ceiling go ahead and install the cornice following your wallboard and ceiling lining happen to be installed. Also if your bath is not freestanding you can now from the frame and install the bath. Ensure the bath is installed correctly permitting the thickness in the tiles and  sure to evaluate all linings and pipes when you continue with your bathrooms renovation.

roger wade studio interior design photography of rustic handcrafted log home living room toward
log home interiors  mountain+cabin  Great Interior Design  Greats interior design   if

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the ground be sure that the waterproofing comes 100mm inside the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the bath must be waterproofed 100mm over the lip of the bath around and to the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, so the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most crucial.
Step four - Lay in the cement screed for the bottom.

Before the floor tiles can laid the floor should be smooth and fairly flat having a slight fall for the drainage outlet. To do this you need to use sand and cement mix which is advisable to add a waterproofing agent into this at the same time. With a level, set a floor level in the doorway. Use the top aluminum angle since the finished floor level and measure on the thickness of the tile plus 10mm for that glue. Mark around the bathroom using a level and then screed inside your sand and cement mix which has a 1 to 3 degree fall to the top of the drain outlet. Take your time and obtain it right using the finished level as smooth as is possible. When the sand cement mix has set but is not dry (it is possible to walk into it however, you it is still a bit soft) rub it over having a house brick. This will remove each of the small highs and lows and look which has a level while you go. Let the bathroom floor fully dry and after that you must have a fantastic surface to tile onto. Tip: the greater work you place into the ground screed the simpler your tiling will probably be.
Interioare rustice spectaculoase inspiratie in imagini
roger wade studio interior design photography of rustic handcrafted log home living room toward

Step five: Tile floor and walls
Lay your tiles on a floor first then grout. Then lay your wall tiles making sure actually level as you lay. Once the lavatory tiles are actually cut and laid, grout your entire tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity making certain it really is level and sealed across the top with silicone and in addition seal around the bath. Tip: make sure they come in the right place when you drill to your tiles.
21 Rustic Log Cabin Interior Design Ideas Style Motivation
Interioare rustice spectaculoase  inspiratie in imagini

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making certain everything is fitted correctly knowning that there are no leaks inside your plumbing. - Enjoy a new bathroom.

Comments