Log home interior design ideas YouTube

Log Homes Interior Designs Log Homes Interior Designs Amusing Design Log Home Interior Design Log home interior design ideas YouTube

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house and they are generally also the most costly to renovate. Bathroom renovation is really a job that, if done well, can add value to your home as well as a great space full of design and light.
Log home interior design ideas  YouTube

Bathroom design
Bathroom design may be the first part of your bathroom renovation you should get right. Just replacing the present bathroom with similar design will not be enough. The key to great bathroom design would be to design it using the individuals who will certainly use it in your mind. However ensure that your bathrooms design also has an over-all use factor also.

For example: If you were designing your bathroom for families you might still design the toilet with comfortable access on the shower and bath. This would make certain that the design would recieve treatment for those who have limited mobility. This means if you choose to sell your property or if you're renovating for profit your design has a wider market appeal. Great bathroom design also uses the area well, considering the light or window space, height and width of fittings, and drainage options. Draw out a strategy to scale and right down the sizes of your respective room. Mark the existing drainage points after which and water inlet points. Write down a wish set of the restroom fittings to need and desire with their sizes. Now marry both the together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at expense.
Beautiful log home photo gallery

Bathroom remodel
If you decide to complete the project yourself or part of the project it really is time to work with a skip bin and grab the old bathroom. If your house is made pre 1980 you might have fibro bathroom wall linings with asbestos within it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing in position you won't need to turn the lake off for the complete house. Also you will likely need to jack hammer the floor tiles up and the sand and cement bed that they are laid on.
22 Luxurious Log Cabin Interiors You HAVE To See  Log Cabin Hub

Bathroom Renovation and construction
Bathrooms should be construction properly from the ground-up to make certain that the finished job is correct and true. This also ensures the look and search of the bathroom may have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof the bottom and shower and bath recess.

Correct december a floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Log Cabin Interior Ideas  Home Floor Plans Designed in PA


Paint ceiling and final  one - Plumbing and electrical
At this point many new plumbing is installed for clean cold and hot water and drainage. Careful attention should be taken when positioning the modern plumbing so your plumbing fittings are correct once the tiling is completed. For example: To centre a fitting in a shower recess you need to consider the thickness with the wall board, tile glue and tile therefore the fitting will probably be centred after the tiles are in place. The same refers to installing drainage pipes for the toilet; the wall lining and tile thickness have to be looked at and so the pipe is within the correct position if the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
21 Rustic Log Cabin Interior Design Ideas  Style Motivation

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board with a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice because best done after tiling. If you might be not tiling to the ceiling go on and install the cornice after the wallboard and ceiling lining are already installed. Also if your bath isn't freestanding now you can form the frame and install the bath. Ensure the bathtub is installed correctly enabling the thickness in the tiles and  sure to test all linings and pipes before you decide to continue with your bathroom renovation.

Beautiful log home photo gallery
Log home interior design ideas  YouTube

Step three - Waterproof your bathrooms
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing a floor make certain that the waterproofing comes 100mm up the walls. The shower recess will need to be waterproofed 100mm above the shower rose outlet. Also the bath must be waterproofed 100mm higher than the lip with the bath about and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, so the all water will simply drop a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay inside the cement screed for a floor.

Before a floor tiles can laid the floor has to be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you must use sand and cement mix which is far better to put in a waterproofing agent into this too. With a level, set the bottom level on the doorway. Use the top aluminum angle since the finished floor level and measure down the thickness in the tile plus 10mm for your glue. Mark about the lavatory with a level then screed within your sand and cement mix having a 1 to 3 degree fall on the top from the drain outlet. Take your time and get it right using the finished level as smooth as is possible. When the sand cement mix has set but isn't dry (you can walk on it however, you it's still a bit soft) rub it over using a house brick. This will remove each of the small highs and lows and check with a level because you go. Let the lavatory floor fully dry and then you needs to have an excellent surface to tile onto. Tip: the more work you place into the bottom screed the more your tiling will be.
22 Luxurious Log Cabin Interiors You HAVE To See Log Cabin Hub
Beautiful log home photo gallery

Step five: Tile floor and walls
Lay your tiles on the floor first and then grout. Then lay your wall tiles making certain that they are level when you lay. Once the bathroom tiles have been cut and laid, grout your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit a new bathroom vanity making certain it is level and sealed throughout the top with silicone and also seal around the tub. Tip: make sure they will be in the right place before you decide to drill in your tiles.
Log Cabin Interior Ideas Home Floor Plans Designed in PA
22 Luxurious Log Cabin Interiors You HAVE To See  Log Cabin Hub

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring things are all fitted correctly knowning that there aren't any leaks inside your plumbing. - Enjoy your brand-new bathroom.

Comments