Log Cabin mansion? Home Design Pinterest Log homes, Home and House

Log Homes Interior Designs Log Homes Interior Designs Cute Study Room Charming Of Log Homes Log Cabin mansion? Home Design Pinterest Log homes, Home and House

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house and they are also one the most costly to renovate. Bathroom renovation can be a job that, if done well, can add value to some home plus a great space full of design and lightweight.
Log Cabin mansion?  Home Design  Pinterest  Log homes, Home and House

Bathroom design
Bathroom design may be the first division of your bathrooms renovation you need right. Just replacing the prevailing bathroom with the same design will not be enough. The key to great bathroom design would be to design it with all the individuals who are going to utilize it in your mind. However make sure that your bathroom design also has an overall use factor also.

For example: If you were designing your bathroom for families you could still design the bathroom with easy accessibility on the shower and bath. This would make sure that the look would also work for people with limited mobility. This means if you sell your property or if you are renovating for profit your design features a wider market appeal. Great bathroom design also uses the area well, looking at the lighting or window space, size of fittings, and drainage options. Draw out a strategy to scale and down the sizes of the room. Mark the current drainage points and after that and water inlet points. Write down a wish listing of the bathroom fittings to wish and want using their sizes. Now marry the 2 together and discover what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at expense.
Log Home Interiors

Bathroom remodel
If you have chosen to accomplish the project yourself or part of the project it's time to engage a skip bin and take out that old bathroom. If your house was developed pre 1980 maybe you have fibro bathroom wall linings with asbestos within it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in position you'll not ought to turn water off for the entire house. Also you will have to jack hammer the ground tiles up as well as the sand and cement bed actually laid on.
Log Home Interiors  Yellowstone Log Homes

Bathroom Renovation and construction
Bathrooms has to be construction properly from your ground-up to make sure that the finished job is correct and true. This also ensures the design and appearance of the restroom can have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bathtub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct the fall of a floor with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Кујна од соништата  ИДИВИДИ форум  страница 5


Paint ceiling and final  one - Plumbing and electrical
At now brand new plumbing is installed for clean hot and cold water and drainage. Careful attention needs to be taken when positioning the brand new plumbing so the plumbing fittings are correct when the tiling is fully gone. For example: To centre a fitting inside a shower recess you should take into consideration the thickness with the wall board, tile glue and tile so the fitting will be centred following the tiles are set up. The same applies to installing drainage pipes for the toilet; the wall lining and tile thickness should be considered and so the pipe is within the correct position in the event the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them for the mains power.
Modern Log Cabin Kitchen Modern Log Cabin Interior Design, modern log homes design  Mexzhouse.com

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board with a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you might be laying your tiles from floor to ceiling usually do not install the cornice because most effectively achieved after tiling. If you're not tiling on the ceiling just install the cornice following the wallboard and ceiling lining happen to be installed. Also if your bath isn't freestanding anyone can make up the frame and install the bath. Ensure the bath is installed correctly allowing for the thickness from the tiles and  sure to check all linings and pipes when you continue with a bath room renovation.

Log Home Interiors
Log Cabin mansion?  Home Design  Pinterest  Log homes, Home and House

Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the bottom make certain that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm over the shower rose outlet. Also the bathtub should be waterproofed 100mm above the lip with the bath around and to the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, and so the all water is only going to decrease a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay within the cement screed for the ground.

Before the floor tiles can laid a floor have to be smooth and fairly flat which has a slight fall to the drainage outlet. To do this you must use sand and cement mix which is best to give a waterproofing agent into this as well. With a level, set the floor level in the doorway. Use the top aluminum angle because the finished floor level and measure along the thickness with the tile plus 10mm for that glue. Mark about the lavatory having a level then screed with your sand and cement mix having a 1 to 3 degree fall to the top from the drain outlet. Take your time and get it right with the finished level as smooth as you can. When the sand cement mix has set but is just not dry (you'll be able to walk into it however, you it is a lttle bit soft) rub it over using a house brick. This will remove all the small highs and lows and check which has a level while you go. Let the lavatory floor fully dry and after that you needs to have a great surface to tile onto. Tip: the harder work you add into the ground screed the simpler your tiling will probably be.
Log Home Interiors Yellowstone Log Homes
Log Home Interiors

Step five: Tile floor and walls
Lay your tiles on the floor first and after that grout. Then lay your wall tiles making certain they are level while you lay. Once the restroom tiles happen to be cut and laid, grout your entire tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your new bathroom vanity ensuring it can be level and sealed throughout the top with silicone plus seal around the bathtub. Tip: make sure they are in the right place when you drill into the tiles.
Кујна од соништата ИДИВИДИ форум страница 5
Log Home Interiors  Yellowstone Log Homes

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring things are fitted correctly which there are no leaks with your plumbing. - Enjoy your new bathroom.

Comments