How To Design and Build A Home Theater Room in 8 Steps

Home Theater Design Plans How To Design and Build A Home Theater Room in 8 Steps

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home and they are also certainly the most expensive for renovate. Bathroom renovation is a job that, if done well, may add value to a home plus a great space full of design and light-weight.
How To Design and Build A Home Theater Room in 8 Steps

Bathroom design
Bathroom design is the first area of a bath room renovation you need to get right. Just replacing the existing bathroom sticking with the same design is probably not enough. The key to great bathroom design is to design it with the individuals who will put it to use in mind. However ensure that your bathrooms design also has a general use factor too.

For example: If you were designing a bathroom for families you may still design the toilet with comfortable access towards the shower and bath. This would be sure that the style would work for people with limited mobility. This means if you choose to sell your home or if you're renovating for profit your design has a wider market appeal. Great bathroom design also uses the space well, taking into account the sunshine or window space, sized fittings, and drainage options. Draw out an idea to scale and right down the sizes of one's room. Mark the current drainage points after which and water inlet points. Write down a wish listing of the toilet fittings to wish and want using sizes. Now marry both the together and see what fits. Note: Most bathroom drainage and water inlet points might be moved but this will come at expense.
Three Common Home Theater Layout Mistakes Even the Pros Make  Acoustic Frontiers

Bathroom remodel
If you have chosen to do the project yourself or part of the task it really is time to hire a skip bin and take out the previous bathroom. If your property was developed pre 1980 you could have fibro bathroom wall linings with asbestos inside and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing in place you'll not must turn water off for your house. Also you should jack hammer the ground tiles up and also the sand and cement bed actually laid on.
HomeTheater Plans basement

Bathroom Renovation and construction
Bathrooms must be construction properly from the ground-up to ensure that the finished job is correct and true. This also ensures the look and look of the toilet will have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof the floor and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Basement Designed by Jooca Studio  Home theatre  Andover, US  Arcbazar


Paint ceiling and final  one - Plumbing and electrical
At now all new plumbing is installed for clean cold and hot water and drainage. Careful attention has to be taken when positioning the brand new plumbing so your plumbing fittings are correct once the tiling is fully gone. For example: To centre a fitting in the shower recess you must consider the thickness with the wall board, tile glue and tile so the fitting will probably be centred following your tiles are in place. The same pertains to installing drainage pipes for a toilet; the wall lining and tile thickness must be considered hence the pipe is in the correct position if the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them towards the mains power.
Интерьер и дизайн домашнего кинотеатра  25 современных идей на фото

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board using a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you happen to be laying your tiles from floor to ceiling usually do not install the cornice because this is most effectively achieved after tiling. If you might be not tiling towards the ceiling just install the cornice following your wallboard and ceiling lining are actually installed. Also if your bath isn't freestanding now you can make up the frame and install the bathtub. Ensure the bathtub is installed correctly enabling the thickness in the tiles and  sure to check on all linings and pipes prior to deciding to continue with a bath room renovation.

Three Common Home Theater Layout Mistakes Even the Pros Make Acoustic Frontiers
How To Design and Build A Home Theater Room in 8 Steps

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing a floor make certain that the waterproofing comes 100mm up the walls. The shower recess will need to be waterproofed 100mm above the shower rose outlet. Also the tub needs to be waterproofed 100mm above the lip of the bath about and towards the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, and so the all water is only going to go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most significant.
Step four - Lay inside the cement screed for a floor.

Before the bottom tiles can laid the bottom have to be smooth and fairly flat having a slight fall for the drainage outlet. To do this you need to use sand and cement mix and it's also best to give a waterproofing agent into this also. With a level, set the ground level at the doorway. Use the top aluminum angle as the finished floor level and measure on the thickness with the tile plus 10mm for the glue. Mark right around the toilet which has a level and then screed with your sand and cement mix using a 1 to 3 degree fall for the top with the drain outlet. Take your time and obtain it right with all the finished level as smooth as is possible. When the sand cement mix has set but is not dry (you'll be able to walk into it however, you will still be somewhat soft) rub it over which has a house brick. This will remove each of the small highs and lows and check with a level while you go. Let the restroom floor fully dry after which you should have a fantastic surface to tile onto. Tip: greater work you place into a floor screed the easier your tiling is going to be.
HomeTheater Plans basement
Three Common Home Theater Layout Mistakes Even the Pros Make  Acoustic Frontiers

Step five: Tile floor and walls
Lay your tiles on a floor first and then grout. Then lay your wall tiles ensuring that that they are level because you lay. Once the bathroom tiles have been cut and laid, grout your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your bathroom vanity ensuring it really is level and sealed around the top with silicone and in addition seal around the bath. Tip: make sure they have been in the right place before you drill in your tiles.
Basement Designed by Jooca Studio Home theatre Andover, US Arcbazar
HomeTheater Plans basement

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring things are fitted correctly knowning that there won't be any leaks in your plumbing. - Enjoy your new bathroom.

Comments