Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house and they are also one the most expensive for renovate. Bathroom renovation is a job that, if done well, may add value to your home along with a great space full of design and lightweight.
How To Decorate An Unfinished Basement In Designs 14  Dreamingincmyk.com

Bathroom design
Bathroom design will be the first part of a bath room renovation you need right. Just replacing the present bathroom sticking with the same design will not be enough. The key to great bathroom design would be to design it using the folks that will apply it in mind. However make sure that your bathrooms design also offers a broad use factor also.

For example: If you were designing your bathrooms for families you can still design the lavatory with comfortable access for the shower and bath. This would make sure that the design would work for those who have limited mobility. This means if you opt to sell your home or if you might be renovating for profit your design has a wider market appeal. Great bathroom design also uses space well, taking into account the lighting or window space, height and width of fittings, and drainage options. Draw out a strategy to scale and down the sizes of the room. Mark the present drainage points and then and water inlet points. Write down a wish report on the lavatory fittings to want and wish using their sizes. Now marry both together and discover what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at extra cost.
Rustic Home Design Ideas  sculptfusion.us  sculptfusion.us

Bathroom remodel
If you've decided to complete the project yourself or part of the job it's time to work with a skip bin and pull out that old bathroom. If your own home was made pre 1980 you could have fibro bathroom wall linings with asbestos within it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in position you will not need to turn the lake off for the entire house. Also you should jack hammer the bottom tiles up along with the sand and cement bed that they're laid on.
3505 best images about Home Decor on Pinterest  Chairs, Clock and Fireplaces

Bathroom Renovation and construction
Bathrooms have to be construction properly from the ground-up to be sure that the finished job is correct and true. This also ensures the structure and look of the restroom could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the tub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Household Decor Cheap  Decoration For Home


Paint ceiling and final  one - Plumbing and electrical
At now many new plumbing is installed for clean cold and hot water and drainage. Careful attention should be taken when positioning the new plumbing so that the plumbing fittings are correct in the event the tiling is finished. For example: To centre a fitting in the shower recess you have to take into consideration the thickness in the wall board, tile glue and tile hence the fitting will probably be centred as soon as the tiles are in place. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness has to be taken into account therefore the pipe is within the correct position if the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them on the mains power.
Charming home clipart  Clipground

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board which has a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice as this is done after tiling. If you might be not tiling on the ceiling proceed to install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding anyone can from the frame and install the bath. Ensure the bath is installed correctly enabling the thickness in the tiles and  sure to test all linings and pipes before you continue with your bathroom renovation.

Rustic Home Design Ideas sculptfusion.us sculptfusion.us
How To Decorate An Unfinished Basement In Designs 14  Dreamingincmyk.com

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing the floor be sure that the waterproofing comes 100mm in the walls. The shower recess will have to be waterproofed 100mm across the shower rose outlet. Also the bathtub must be waterproofed 100mm across the lip in the bath around and on the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, hence the all water is only going to decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most significant.
Step four - Lay inside cement screed for a floor.

Before the bottom tiles can laid the ground should be smooth and fairly flat using a slight fall on the drainage outlet. To do this you must use sand and cement mix and it is advisable to give a waterproofing agent into this as well. With a level, set the bottom level in the doorway. Use the top aluminum angle because the finished floor level and measure on the thickness of the tile plus 10mm for that glue. Mark about the restroom using a level and then screed within your sand and cement mix using a 1 to 3 degree fall to the top from the drain outlet. Take your time and obtain it right with the finished level as smooth as possible. When the sand cement mix has set but is not dry (you are able to walk onto it nevertheless, you it is a lttle bit soft) rub it over having a house brick. This will remove each of the small highs and lows and look having a level when you go. Let the bathroom floor fully dry and then you must have an excellent surface to tile onto. Tip: the more work you place into the ground screed the simpler your tiling is going to be.
3505 best images about Home Decor on Pinterest Chairs, Clock and Fireplaces
Rustic Home Design Ideas  sculptfusion.us  sculptfusion.us

Step five: Tile floor and walls
Lay your tiles on the ground first and then grout. Then lay your wall tiles making sure they are level when you lay. Once the lavatory tiles are actually cut and laid, grout all your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your brand-new bathroom vanity ensuring it's level and sealed throughout the top with silicone plus seal around the tub. Tip: make sure they come in the right place when you drill in your tiles.
Household Decor Cheap Decoration For Home
3505 best images about Home Decor on Pinterest  Chairs, Clock and Fireplaces

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring things are all fitted correctly and that there aren't any leaks with your plumbing. - Enjoy your bathroom.