House Plan 50250 at FamilyHomePlans.com

Single Family Home Designs Single Family Home Designs House Plan 50250 at FamilyHomePlans.com

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms inside your home and they are generally also one the most expensive for renovate. Bathroom renovation can be a job that, if done well, may add value to some home along with a great space filled with design and light.
House Plan 50250 at FamilyHomePlans.com

Bathroom design
Bathroom design is the first area of your bathroom renovation you need to get right. Just replacing the present bathroom sticking with the same design may not be enough. The key to great bathroom design is usually to design it while using folks that are likely to use it in your mind. However ensure that your bathrooms design also offers a broad use factor also.

For example: If you were designing a bath room for families you could still design the toilet with easy access to the shower and bath. This would make certain that the style would recieve treatment for those who have limited mobility. This means if you choose to sell your house or if you're renovating for profit your design includes a wider market appeal. Great bathroom design also uses space well, looking at the sunshine or window space, sized fittings, and drainage options. Draw out a strategy to scale and all the way down the sizes of the room. Mark the present drainage points after which and water inlet points. Write down a wish listing of the restroom fittings to want and want with their sizes. Now marry both together and see what fits. Note: Most bathroom drainage and water inlet points could be moved but this certainly does come at extra cost.
House Plan 72621  Family Home Plans

Bathroom remodel
If you decide to do the task yourself or part of the job it's time to hire a skip bin and grab the previous bathroom. If your house appeared pre 1980 maybe you have fibro bathroom wall linings with asbestos inside and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing in position you do not ought to turn water off for the whole house. Also you will need to jack hammer the ground tiles up as well as the sand and cement bed that they are laid on.
Single Family Home Designs  Home Design Interior

Bathroom Renovation and construction
Bathrooms must be construction properly in the ground-up to be sure that the finished job is correct and true. This also ensures the style and appear of the restroom may have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the tub hob and bath.

Waterproof a floor and shower and bath recess.

Correct december the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Building Plans  Single Family  Cross Creek


Paint ceiling and final  one - Plumbing and electrical
At this time brand new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the brand new plumbing so that the plumbing fittings are correct if the tiling is completed. For example: To centre a fitting in a shower recess you have to consider the thickness from the wall board, tile glue and tile so the fitting will probably be centred following the tiles are available. The same pertains to installing drainage pipes to get a toilet; the wall lining and tile thickness must be looked at and so the pipe influences correct position once the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
3D House View

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board which has a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling don't install the cornice because most effectively achieved after tiling. If you're not tiling to the ceiling go on and install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding you can now from the frame and install the tub. Ensure the bath is installed correctly making it possible for the thickness from the tiles and  sure to check on all linings and pipes prior to deciding to continue with your bathrooms renovation.

House Plan 72621 Family Home Plans
House Plan 50250 at FamilyHomePlans.com

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the bottom make sure that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm across the shower rose outlet. Also the bathtub must be waterproofed 100mm across the lip in the bath right around and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, and so the all water will still only go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay inside the cement screed for the bottom.

Before the floor tiles can laid the ground must be smooth and fairly flat having a slight fall on the drainage outlet. To do this you need to use sand and cement mix which is advisable to add a waterproofing agent into this also. With a level, set the floor level at the doorway. Use the top aluminum angle because finished floor level and measure down the thickness in the tile plus 10mm for the glue. Mark around the bathroom with a level and after that screed with your sand and cement mix having a 1 to 3 degree fall for the top with the drain outlet. Take your time and acquire it right with all the finished level as smooth as possible. When the sand cement mix has set but isn't dry (you are able to walk about it nevertheless, you it is still a little soft) rub it over using a house brick. This will remove all the small highs and lows and appearance which has a level when you go. Let the lavatory floor fully dry then you needs to have a fantastic surface to tile onto. Tip: the harder work you put into the floor screed the simpler your tiling will probably be.
Single Family Home Designs Home Design Interior
House Plan 72621  Family Home Plans

Step five: Tile floor and walls
Lay your tiles on the bottom first after which grout. Then lay your wall tiles ensuring that actually level when you lay. Once the lavatory tiles are actually cut and laid, grout all your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your bathroom vanity making certain it can be level and sealed across the top with silicone as well as seal around the tub. Tip: make sure they will be in the right place when you drill to your tiles.
Building Plans Single Family Cross Creek
Single Family Home Designs  Home Design Interior

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making certain things are all fitted correctly which there are no leaks within your plumbing. - Enjoy your brand-new bathroom.

Comments