House Plan 1491560 : 3 Bedroom, 2174 Sq Ft Craftsman Home TPC MSAP2174

3 Bedroom Home Design Plans House Plans House Plan 1491560 : 3 Bedroom, 2174 Sq Ft Craftsman Home TPC MSAP2174

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms inside your home and they are generally also the most costly to renovate. Bathroom renovation is a job that, if done well, can add value with a home and a great space full of design and light.
House Plan 1491560 : 3 Bedroom, 2174 Sq Ft Craftsman Home  TPC  MSAP2174

Bathroom design
Bathroom design will be the first division of a bath room renovation you need right. Just replacing the existing bathroom sticking with the same design is probably not enough. The key to great bathroom design is to design it while using folks that will apply it at heart. However make sure that your bathroom design also offers a broad use factor too.

For example: If you were designing your bathrooms for families you might still design the bathroom with easy access for the shower and bath. This would ensure that the style would recieve treatment for people with limited mobility. This means if you choose to sell your own home or if you are renovating for profit your design carries a wider market appeal. Great bathroom design also uses the area well, taking into consideration the light or window space, height and width of fittings, and drainage options. Draw out a plan to scale and down the sizes of one's room. Mark the existing drainage points after which and water inlet points. Write down a wish report on the restroom fittings to wish and need with their sizes. Now marry both the together to see what fits. Note: Most bathroom drainage and water inlet points might be moved but this certainly does come at extra cost.
Simple 3 Bedroom House Plans 3 Bedroom House Plans with Loft, upstairs living home designs

Bathroom remodel
If you decide to do the project yourself or part of the work it's time to work with a skip bin and pull out the old bathroom. If your house was developed pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in place you do not ought to turn the lake off for the whole house. Also you will have to jack hammer the ground tiles up along with the sand and cement bed actually laid on.
2 Bedroom House Plan  ID 12209  House Plans by Maramani

Bathroom Renovation and construction
Bathrooms should be construction properly in the start to ensure that the finished job is correct and true. This also ensures the structure and look of the lavatory can have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the tub hob and bath.

Waterproof the floor and shower and bath recess.

Correct the fall of the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Mockingbird Hill 5722  3 Bedrooms and 2.5 Baths  The House Designers


Paint ceiling and final  one - Plumbing and electrical
At this time all new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the modern plumbing so that the plumbing fittings are correct if the tiling is finished. For example: To centre a fitting inside a shower recess you must take into consideration the thickness in the wall board, tile glue and tile hence the fitting will be centred following the tiles are in position. The same pertains to installing drainage pipes to get a toilet; the wall lining and tile thickness have to be taken into account hence the pipe is within the correct position when the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
50 Three “3” Bedroom Apartment/House Plans  Architecture  Design

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on to your new wall board having a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling do not install the cornice as this is most effectively achieved after tiling. If you might be not tiling towards the ceiling go on and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath is just not freestanding now you can form the frame and install the bath. Ensure the tub is installed correctly allowing for the thickness with the tiles and  sure to evaluate all linings and pipes prior to deciding to continue with your bathroom renovation.

Simple 3 Bedroom House Plans 3 Bedroom House Plans with Loft, upstairs living home designs
House Plan 1491560 : 3 Bedroom, 2174 Sq Ft Craftsman Home  TPC  MSAP2174

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the bottom be sure that the waterproofing comes 100mm the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the tub should be waterproofed 100mm higher than the lip in the bath around and towards the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, so the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay in the cement screed for a floor.

Before a floor tiles can laid a floor should be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you have to use sand and cement mix and it is far better to put in a waterproofing agent into this as well. With a level, set the ground level in the doorway. Use the top aluminum angle because finished floor level and measure along the thickness in the tile plus 10mm to the glue. Mark around the bathroom with a level and after that screed with your sand and cement mix with a 1 to 3 degree fall to the top of the drain outlet. Take your time and obtain it right while using finished level as smooth as you possibly can. When the sand cement mix has set but just isn't dry (it is possible to walk on it but you it is still somewhat soft) rub it over with a house brick. This will remove each of the small highs and lows and look having a level because you go. Let the restroom floor fully dry then you should have an incredible surface to tile onto. Tip: the harder work you set into the ground screed the more your tiling is going to be.
2 Bedroom House Plan ID 12209 House Plans by Maramani
Simple 3 Bedroom House Plans 3 Bedroom House Plans with Loft, upstairs living home designs

Step five: Tile floor and walls
Lay your tiles on the ground first and then grout. Then lay your wall tiles making sure actually level as you lay. Once the bathroom tiles happen to be cut and laid, grout your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your brand-new bathroom vanity making sure it is level and sealed round the top with silicone plus seal around the bathtub. Tip: make sure they are in the right place before you drill in your tiles.
Mockingbird Hill 5722 3 Bedrooms and 2.5 Baths The House Designers
2 Bedroom House Plan  ID 12209  House Plans by Maramani

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that everything is fitted correctly which there won't be any leaks inside your plumbing. - Enjoy your brand-new bathroom.

Comments