Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home and they are also the most expensive to renovate. Bathroom renovation is often a job that, if done well, will add value to your home as well as a great space full of design and light.
Home Painting? Here is All you need to know!

Bathroom design
Bathroom design could be the first area of your bathrooms renovation you need to get right. Just replacing the prevailing bathroom sticking with the same design may not be enough. The key to great bathroom design is always to design it using the folks that will utilize it in your mind. However ensure that your bathroom design boasts an overall use factor also.

For example: If you were designing a bath room for families you can still design the toilet with quick access to the shower and bath. This would be sure that the design would work if you have limited mobility. This means if you decide to sell your house or if you happen to be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the space well, looking at the lighting or window space, size fittings, and drainage options. Draw out a strategy to scale and down the sizes of your respective room. Mark the existing drainage points and then and water inlet points. Write down a wish list of the toilet fittings to want and wish using their sizes. Now marry the 2 together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this certainly does come at extra cost.
Home Painting Color Schemes Interior  Decoratingspecial.com

Bathroom remodel
If you have chosen to complete the work yourself or part of the work it can be time to work with a skip bin and retrieve the old bathroom. If your property appeared pre 1980 maybe you have fibro bathroom wall linings with asbestos within it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in position you do not need to turn the river off for your house. Also you should jack hammer the bottom tiles up and also the sand and cement bed they are laid on.
Gallery  Repairs  Paints

Bathroom Renovation and construction
Bathrooms should be construction properly through the ground up to make certain that the finished job is correct and true. This also ensures the design and appear of the restroom will have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof the floor and shower and bath recess.

Correct december the ground with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Home Painting :: 123 Home Paints


Paint ceiling and final  one - Plumbing and electrical
At this time all new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the new plumbing so your plumbing fittings are correct once the tiling is finished. For example: To centre a fitting in the shower recess you need to think about the thickness of the wall board, tile glue and tile hence the fitting is going to be centred as soon as the tiles are set up. The same relates to installing drainage pipes for a toilet; the wall lining and tile thickness has to be taken into account therefore the pipe is incorporated in the correct position when the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them on the mains power.
Professional House Painting Services for Your Home  Asian Paints

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout onto your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice because most effectively achieved after tiling. If you might be not tiling on the ceiling proceed to install the cornice after the wallboard and ceiling lining are already installed. Also if your bath is just not freestanding it's simple to form the frame and install the bathtub. Ensure the bath is installed correctly enabling the thickness of the tiles and  sure to test all linings and pipes before you continue with your bathrooms renovation.

Home Painting Color Schemes Interior Decoratingspecial.com
Home Painting? Here is All you need to know!

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the floor be sure that the waterproofing comes 100mm in the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the bathtub ought to be waterproofed 100mm higher than the lip of the bath about and to the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, therefore the all water is only going to decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most critical.
Step four - Lay in the cement screed for the floor.

Before a floor tiles can laid the ground have to be smooth and fairly flat with a slight fall to the drainage outlet. To do this you have to use sand and cement mix in fact it is advisable to add a waterproofing agent into this as well. With a level, set the ground level on the doorway. Use the top aluminum angle because finished floor level and measure down the thickness from the tile plus 10mm for your glue. Mark around the restroom with a level after which screed with your sand and cement mix with a 1 to 3 degree fall on the top with the drain outlet. Take your time and get it right with all the finished level as smooth as possible. When the sand cement mix has set but is not dry (it is possible to walk about it however, you it is still a little soft) rub it over with a house brick. This will remove every one of the small highs and lows and look using a level because you go. Let the bathroom floor fully dry and after that you should have an incredible surface to tile onto. Tip: the more work you set into the ground screed the easier your tiling will be.
Gallery Repairs Paints
Home Painting Color Schemes Interior  Decoratingspecial.com

Step five: Tile floor and walls
Lay your tiles on the bottom first and after that grout. Then lay your wall tiles making certain actually level as you lay. Once the lavatory tiles happen to be cut and laid, grout your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity making sure it really is level and sealed across the top with silicone plus seal around the bathtub. Tip: make sure they come in the right place when you drill to your tiles.
Home Painting :: 123 Home Paints
Gallery  Repairs  Paints

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making certain things are fitted correctly knowning that there won't be any leaks in your plumbing. - Enjoy your new bathroom.