Home Design Ideas idee arredamento casa

Narrow Block Home Designs Home Designs For Narrow Blocks | Home Design Ideas Home Design Ideas idee arredamento casa

Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms in the house plus they are also the most costly to renovate. Bathroom renovation can be a job that, if done well, will add value with a home and a great space brimming with design and light-weight.
Home Design Ideas  idee arredamento casa

Bathroom design
Bathroom design could be the first part of your bathrooms renovation you need to get right. Just replacing the existing bathroom sticking with the same design will not be enough. The key to great bathroom design would be to design it while using people that are likely to apply it planned. However be sure that your bathrooms design even offers an over-all use factor as well.

For example: If you were designing your bathroom for families you can still design the lavatory with comfortable access towards the shower and bath. This would be sure that the design would recieve treatment for people with limited mobility. This means if you decide to sell your home or if you might be renovating for profit your design carries a wider market appeal. Great bathroom design also uses space well, looking at the sunlight or window space, size of fittings, and drainage options. Draw out a plan to scale and right down the sizes of one's room. Mark the existing drainage points after which and water inlet points. Write down a wish report on the toilet fittings to need and wish using their sizes. Now marry both together to see what fits. Note: Most bathroom drainage and water inlet points might be moved but this certainly does come at extra cost.
Insolite, arts, autres — New Post has been published on 2Tout2Rien

Bathroom remodel
If you have decided to accomplish the work yourself or part of the task it is time to employ a skip bin and grab the previous bathroom. If your property was developed pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in position you do not need to turn water off for the entire house. Also you will have to jack hammer a floor tiles up and also the sand and cement bed that they are laid on.
Arquitectura verde y sus ventajas  Arkiplus.com

Bathroom Renovation and construction
Bathrooms should be construction properly from your ground-up to make sure that the finished job is correct and true. This also ensures the look and appearance of the bathroom could have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof the ground and shower and bath recess.

Correct nov the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Salón de diseño: cómo es la decoración de estos salones


Paint ceiling and final  one - Plumbing and electrical
At this time new plumbing is installed for clean hot and cold water and drainage. Careful attention must be taken when positioning the modern plumbing so your plumbing fittings are correct in the event the tiling is completed. For example: To centre a fitting in a shower recess you need to think about the thickness of the wall board, tile glue and tile so the fitting is going to be centred following your tiles are in place. The same pertains to installing drainage pipes to get a toilet; the wall lining and tile thickness must be looked at hence the pipe influences correct position when the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them for the mains power.
Stoneleigh  Modern Home Design Ideas  Dale Alcock Homes  YouTube

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout onto your new wall board using a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because this is done after tiling. If you are not tiling for the ceiling go ahead and install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath isn't freestanding you can now make up the frame and install the bath. Ensure the bath is installed correctly making it possible for the thickness from the tiles and  sure to check all linings and pipes before you continue with your bathrooms renovation.

Insolite, arts, autres — New Post has been published on 2Tout2Rien
Home Design Ideas  idee arredamento casa

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing a floor make certain that the waterproofing comes 100mm the walls. The shower recess should be waterproofed 100mm across the shower rose outlet. Also the bath must be waterproofed 100mm higher than the lip in the bath around and on the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water is only going to go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay in the cement screed for the floor.

Before the floor tiles can laid the ground should be smooth and fairly flat using a slight fall on the drainage outlet. To do this you have to use sand and cement mix in fact it is best to put in a waterproofing agent into this at the same time. With a level, set the bottom level in the doorway. Use the top aluminum angle because the finished floor level and measure down the thickness in the tile plus 10mm for your glue. Mark about the toilet having a level and after that screed within your sand and cement mix which has a 1 to 3 degree fall towards the top from the drain outlet. Take your time and acquire it right with the finished level as smooth as is possible. When the sand cement mix has set but isn't dry (you'll be able to walk about it nevertheless, you will still be somewhat soft) rub it over with a house brick. This will remove every one of the small highs and lows and check which has a level while you go. Let the lavatory floor fully dry then you really should have an incredible surface to tile onto. Tip: the greater work you put into a floor screed the simpler your tiling will probably be.
Arquitectura verde y sus ventajas Arkiplus.com
Insolite, arts, autres — New Post has been published on 2Tout2Rien

Step five: Tile floor and walls
Lay your tiles on the ground first then grout. Then lay your wall tiles making sure they are level while you lay. Once the lavatory tiles have been cut and laid, grout your entire tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your brand-new bathroom vanity making certain it is level and sealed round the top with silicone and also seal around the bathtub. Tip: make sure they will be in the right place before you decide to drill in your tiles.
Salón de diseño: cómo es la decoración de estos salones
Arquitectura verde y sus ventajas  Arkiplus.com

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean making sure things are fitted correctly which there aren't any leaks within your plumbing. - Enjoy your new bathroom.

Comments