Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the home and they are also one the most expensive to renovate. Bathroom renovation is often a job that, if done well, will add value to your home and a great space full of design and light.
Home Bar Ideas: 89 Design Options  HGTV

Bathroom design
Bathroom design will be the first division of your bathroom renovation you ought to get right. Just replacing the existing bathroom sticking with the same design will not be enough. The key to great bathroom design is usually to design it using the people that will use it in your mind. However be sure that your bathroom design even offers an over-all use factor too.

For example: If you were designing your bathrooms for families you can still design the bathroom with comfortable access for the shower and bath. This would make sure that the design would also work if you have limited mobility. This means if you decide to sell your property or if you happen to be renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, taking into consideration the sunshine or window space, height and width of fittings, and drainage options. Draw out a plan to scale and right down the sizes of the room. Mark the existing drainage points and then and water inlet points. Write down a wish set of the lavatory fittings to want and wish using their sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at extra expense.
photo by photo courtesy abi skipp

Bathroom remodel
If you have chosen to perform the task yourself or part of the task it's time to engage a skip bin and pull out the previous bathroom. If your property was made pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you do not need to turn the water off for the whole house. Also you will need to jack hammer the bottom tiles up as well as the sand and cement bed they are laid on.
Home Bar Ideas: 89 Design Options  Bonus rooms, Bar and Design

Bathroom Renovation and construction
Bathrooms has to be construction properly from the start to ensure that the finished job is correct and true. This also ensures the structure and appearance of the lavatory could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof the floor and shower and bath recess.

Correct december the floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Home Bar Ideas: 89 Design Options  HGTV


Paint ceiling and final  one - Plumbing and electrical
At this time many new plumbing is installed for clean cold and hot water and drainage. Careful attention needs to be taken when positioning the brand new plumbing so your plumbing fittings are correct if the tiling is fully gone. For example: To centre a fitting in a shower recess you should take into consideration the thickness from the wall board, tile glue and tile therefore the fitting will be centred following the tiles are available. The same refers to installing drainage pipes for any toilet; the wall lining and tile thickness must be taken into account therefore the pipe influences correct position in the event the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
Home Bar Ideas: 89 Design Options  For the Home  Bar under stairs, Home bar designs, Bars for home

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board having a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because this is done after tiling. If you might be not tiling for the ceiling go ahead and install the cornice as soon as the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding it's simple to form the frame and install the tub. Ensure the tub is installed correctly making it possible for the thickness of the tiles and  sure to check on all linings and pipes when you continue with a bath room renovation.

photo by photo courtesy abi skipp
Home Bar Ideas: 89 Design Options  HGTV

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the ground make sure that the waterproofing comes 100mm up the walls. The shower recess should be waterproofed 100mm over the shower rose outlet. Also the tub should be waterproofed 100mm across the lip in the bath around and on the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, therefore the all water will simply drop a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most crucial.
Step four - Lay inside cement screed for the floor.

Before the ground tiles can laid the bottom has to be smooth and fairly flat which has a slight fall to the drainage outlet. To do this you should use sand and cement mix which is advisable to give a waterproofing agent into this too. With a level, set the ground level with the doorway. Use the top aluminum angle because finished floor level and measure along the thickness from the tile plus 10mm for the glue. Mark right around the toilet having a level and then screed in your sand and cement mix which has a 1 to 3 degree fall to the top from the drain outlet. Take your time and have it right while using finished level as smooth as possible. When the sand cement mix has set but just isn't dry (you are able to walk into it however, you it is a lttle bit soft) rub it over which has a house brick. This will remove every one of the small highs and lows and check with a level while you go. Let the restroom floor fully dry after which you really should have a fantastic surface to tile onto. Tip: the harder work you place into a floor screed the easier your tiling will be.
Home Bar Ideas: 89 Design Options Bonus rooms, Bar and Design
photo by photo courtesy abi skipp

Step five: Tile floor and walls
Lay your tiles on the ground first and after that grout. Then lay your wall tiles making sure that they are level as you lay. Once the bathroom tiles are actually cut and laid, grout your entire tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit a new bathroom vanity making certain it's level and sealed round the top with silicone and in addition seal around the bath. Tip: make sure they will be in the right place before you drill into your tiles.
Home Bar Ideas: 89 Design Options HGTV
Home Bar Ideas: 89 Design Options  Bonus rooms, Bar and Design

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean making certain things are fitted correctly which there isn't any leaks with your plumbing. - Enjoy your bathroom.