Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms in the house and they are generally also the most costly to renovate. Bathroom renovation is really a job that, if done well, can add value to a home as well as a great space filled with design and light.
Historic New Orleans Estate Features Vintage Bath Design

Bathroom design
Bathroom design may be the first section of a bath room renovation you should get right. Just replacing the current bathroom with the same design is probably not enough. The key to great bathroom design is to design it with the folks that will certainly utilize it in your mind. However make certain that your bathroom design boasts a broad use factor at the same time.

For example: If you were designing your bathroom for families you could still design the bathroom with easy accessibility on the shower and bath. This would make sure that the design would also work for those who have limited mobility. This means if you sell your own home or if you are renovating for profit your design includes a wider market appeal. Great bathroom design also uses the space well, looking at the sunlight or window space, sized fittings, and drainage options. Draw out a strategy to scale and right down the sizes of your respective room. Mark the prevailing drainage points and then and water inlet points. Write down a wish report on the bathroom fittings to need and want making use of their sizes. Now marry both the together and see what fits. Note: Most bathroom drainage and water inlet points can be moved but this will come at extra cost.
Bathroom plans, bathroom designs

Bathroom remodel
If you have decided to perform the task yourself or part of the work it's time to hire a skip bin and pull out the existing bathroom. If your house was made pre 1980 you might have fibro bathroom wall linings with asbestos in it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing set up you will not must turn the river off for the entire house. Also you will need to jack hammer the bottom tiles up as well as the sand and cement bed that they're laid on.
Hunsinger Addition major renovation Lake Leann – Monahan Design LLC

Bathroom Renovation and construction
Bathrooms have to be construction properly through the ground up to make sure that the finished job is correct and true. This also ensures the style and appear of the restroom may have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof the ground and shower and bath recess.

Correct the fall of the floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Vizimac » Master Bathroom Floor Plans Ideas Master Bathroom Floor Plans


Paint ceiling and final  one - Plumbing and electrical
At now new plumbing is installed for clean hot and cold water and drainage. Careful attention must be taken when positioning the newest plumbing in order that the plumbing fittings are correct once the tiling is finished. For example: To centre a fitting inside a shower recess you have to think about the thickness in the wall board, tile glue and tile hence the fitting is going to be centred as soon as the tiles are available. The same refers to installing drainage pipes to get a toilet; the wall lining and tile thickness has to be considered hence the pipe is in the correct position in the event the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them to the mains power.
Bathroom plans, bathroom designs

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on your new wall board which has a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you might be laying your tiles from floor to ceiling do not install the cornice because this is best done after tiling. If you are not tiling towards the ceiling go ahead and install the cornice following the wallboard and ceiling lining have been installed. Also if your bath is just not freestanding now you can make up the frame and install the tub. Ensure the bath is installed correctly permitting the thickness with the tiles and  sure to check all linings and pipes before you continue with a bath room renovation.

Bathroom plans, bathroom designs
Historic New Orleans Estate Features Vintage Bath Design

Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the ground make sure that the waterproofing comes 100mm in the walls. The shower recess will have to be waterproofed 100mm higher than the shower rose outlet. Also the bathtub ought to be waterproofed 100mm over the lip with the bath around and for the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, therefore the all water will still only drop a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay inside cement screed for the floor.

Before a floor tiles can laid a floor should be smooth and fairly flat using a slight fall for the drainage outlet. To do this you should use sand and cement mix and it's also advisable to include a waterproofing agent into this at the same time. With a level, set a floor level in the doorway. Use the top aluminum angle because finished floor level and measure on the thickness in the tile plus 10mm to the glue. Mark around the toilet with a level and then screed with your sand and cement mix having a 1 to 3 degree fall towards the top of the drain outlet. Take your time and get it right using the finished level as smooth as you possibly can. When the sand cement mix has set but is just not dry (you can walk into it but you it is still somewhat soft) rub it over with a house brick. This will remove all of the small highs and lows and appearance using a level because you go. Let the restroom floor fully dry then you needs to have a great surface to tile onto. Tip: the more work you put into the bottom screed the simpler your tiling will be.
Hunsinger Addition major renovation Lake Leann – Monahan Design LLC
Bathroom plans, bathroom designs

Step five: Tile floor and walls
Lay your tiles on the bottom first and then grout. Then lay your wall tiles ensuring that that they're level while you lay. Once the restroom tiles have been cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring that it is level and sealed across the top with silicone plus seal around the bathtub. Tip: make sure they come in the right place before you drill in your tiles.
Vizimac » Master Bathroom Floor Plans Ideas Master Bathroom Floor Plans
Hunsinger Addition major renovation Lake Leann – Monahan Design LLC

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring that things are all fitted correctly knowning that there aren't any leaks inside your plumbing. - Enjoy your new bathroom.