Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms at home and they are also one the most costly to renovate. Bathroom renovation is really a job that, if done well, can add value with a home plus a great space brimming with design and lightweight.
Floorplans

Bathroom design
Bathroom design could be the first section of a bath room renovation you should get right. Just replacing the existing bathroom with the exact same design is probably not enough. The key to great bathroom design is to design it using the people that are going to use it in your mind. However make certain that your bathrooms design also offers a broad use factor at the same time.

For example: If you were designing your bathroom for families you may still design the restroom with easy access for the shower and bath. This would make certain that the look would also work for those who have limited mobility. This means if you sell your house or if you might be renovating for profit your design has a wider market appeal. Great bathroom design also uses the room well, taking into account the sunshine or window space, sized fittings, and drainage options. Draw out an idea to scale and right down the sizes of one's room. Mark the existing drainage points and then and water inlet points. Write down a wish report on the bathroom fittings to want and want making use of their sizes. Now marry both the together and discover what fits. Note: Most bathroom drainage and water inlet points could be moved but this certainly does come at extra expense.
Two Bedroom Apartment Floor Plan  Larksfield Place

Bathroom remodel
If you've decided to do the project yourself or part of the project it's time to employ a skip bin and take out the existing bathroom. If your property appeared pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing set up you will not need to turn water off for your house. Also you will likely need to jack hammer a floor tiles up and also the sand and cement bed that they're laid on.
50 Plans en 3D d’appartement avec 1 chambres

Bathroom Renovation and construction
Bathrooms should be construction properly through the ground up to ensure that the finished job is correct and true. This also ensures the structure and search of the restroom can have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct december the bottom with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
50 One “1” Bedroom Apartment/House Plans  Architecture  Design


Paint ceiling and final  one - Plumbing and electrical
At this aspect new plumbing is installed for clean cold and hot water and drainage. Careful attention needs to be taken when positioning the modern plumbing so the plumbing fittings are correct once the tiling is finished. For example: To centre a fitting in a shower recess you should think about the thickness in the wall board, tile glue and tile therefore the fitting will probably be centred following your tiles are available. The same relates to installing drainage pipes for a toilet; the wall lining and tile thickness have to be looked at hence the pipe is within the correct position in the event the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them on the mains power.
50 Three “3” Bedroom Apartment/House Plans  Architecture  Design

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout onto your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because this is best done after tiling. If you happen to be not tiling to the ceiling go on and install the cornice after the wallboard and ceiling lining happen to be installed. Also if your bath isn't freestanding you can now from the frame and install the bath. Ensure the tub is installed correctly enabling the thickness with the tiles and  sure to check all linings and pipes before you decide to continue with your bathroom renovation.

Two Bedroom Apartment Floor Plan Larksfield Place
Floorplans

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the floor make sure that the waterproofing comes 100mm in the walls. The shower recess will have to be waterproofed 100mm higher than the shower rose outlet. Also the tub must be waterproofed 100mm over the lip in the bath about and to the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, therefore the all water will simply go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay in the cement screed for the ground.

Before the bottom tiles can laid the ground has to be smooth and fairly flat using a slight fall towards the drainage outlet. To do this you need to use sand and cement mix and it is best to include a waterproofing agent into this at the same time. With a level, set the ground level with the doorway. Use the top aluminum angle because finished floor level and measure around the thickness with the tile plus 10mm for your glue. Mark right around the restroom using a level then screed with your sand and cement mix using a 1 to 3 degree fall towards the top in the drain outlet. Take your time and get it right with the finished level as smooth as you can. When the sand cement mix has set but is just not dry (it is possible to walk about it but you it's still a little soft) rub it over which has a house brick. This will remove each of the small highs and lows and appearance having a level as you go. Let the lavatory floor fully dry after which you really should have a fantastic surface to tile onto. Tip: the more work you set into the floor screed the simpler your tiling will likely be.
50 Plans en 3D d’appartement avec 1 chambres
Two Bedroom Apartment Floor Plan  Larksfield Place

Step five: Tile floor and walls
Lay your tiles on a floor first then grout. Then lay your wall tiles making sure they are level when you lay. Once the restroom tiles are already cut and laid, grout all your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your brand-new bathroom vanity making sure it really is level and sealed around the top with silicone as well as seal around the bath. Tip: make sure they have been in the right place before you drill in your tiles.
50 One “1” Bedroom Apartment/House Plans Architecture Design
50 Plans en 3D d’appartement avec 1 chambres

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring that things are fitted correctly which there isn't any leaks in your plumbing. - Enjoy your new bathroom.