Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house and they're also one the most expensive to renovate. Bathroom renovation is really a job that, if done well, can also add value to a home plus a great space brimming with design and light.
Five Basic Kitchen Layouts  Homeworks Hawaii

Bathroom design
Bathroom design is the first division of your bathrooms renovation you need to get right. Just replacing the current bathroom with similar design may not be enough. The key to great bathroom design would be to design it with all the people who will use it planned. However make sure that a bath room design also has a broad use factor at the same time.

For example: If you were designing a bath room for families you may still design the restroom with comfortable access for the shower and bath. This would make certain that the style would also work for people with limited mobility. This means if you choose to sell your house or if you're renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, looking at the light or window space, size fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of your respective room. Mark the prevailing drainage points and after that and water inlet points. Write down a wish list of the restroom fittings to want and want with their sizes. Now marry both the together and discover what fits. Note: Most bathroom drainage and water inlet points may be moved but this may come at expense.
Interior Design Ideas  Home Bunch Interior Design Ideas

Bathroom remodel
If you decide to do the work yourself or part of the job it's time to hire a skip bin and take out the previous bathroom. If your property appeared pre 1980 you could have fibro bathroom wall linings with asbestos inside it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you do not need to turn the river off for the whole house. Also you should jack hammer a floor tiles up as well as the sand and cement bed that they're laid on.
Best Small Kitchen Design Ideas  Home Design

Bathroom Renovation and construction
Bathrooms must be construction properly from your ground up to ensure that the finished job is correct and true. This also ensures the structure and appearance of the restroom could have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the tub hob and bath.

Waterproof the floor and shower and bath recess.

Correct late a floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Kitchen Layouts  Best Kitchen Design Layout


Paint ceiling and final  one - Plumbing and electrical
At this point new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the brand new plumbing in order that the plumbing fittings are correct if the tiling is finished. For example: To centre a fitting in a shower recess you need to take into account the thickness with the wall board, tile glue and tile and so the fitting will probably be centred following your tiles are in position. The same pertains to installing drainage pipes for a toilet; the wall lining and tile thickness should be considered and so the pipe influences correct position if the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
90 Different Kitchen Island Ideas and Designs Photos  Kitchens  Kitchen island with stove

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board using a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you might be laying your tiles from floor to ceiling don't install the cornice because this is best done after tiling. If you might be not tiling to the ceiling go on and install the cornice following your wallboard and ceiling lining are already installed. Also if your bath is just not freestanding it's simple to from the frame and install the bath. Ensure the bath is installed correctly permitting the thickness in the tiles and  sure to test all linings and pipes before you decide to continue with your bathrooms renovation.

Interior Design Ideas Home Bunch Interior Design Ideas
Five Basic Kitchen Layouts  Homeworks Hawaii

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the ground ensure that the waterproofing comes 100mm in the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the bathtub ought to be waterproofed 100mm over the lip from the bath around and towards the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water will only decrease a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay within the cement screed for a floor.

Before the ground tiles can laid the ground has to be smooth and fairly flat using a slight fall on the drainage outlet. To do this you should use sand and cement mix in fact it is best to include a waterproofing agent into this at the same time. With a level, set the floor level in the doorway. Use the top aluminum angle since the finished floor level and measure around the thickness from the tile plus 10mm for that glue. Mark about the lavatory with a level and then screed within your sand and cement mix using a 1 to 3 degree fall for the top with the drain outlet. Take your time and get it right with all the finished level as smooth as possible. When the sand cement mix has set but is not dry (you are able to walk onto it but you it is somewhat soft) rub it over using a house brick. This will remove all the small highs and lows and look which has a level as you go. Let the lavatory floor fully dry then you must have an excellent surface to tile onto. Tip: greater work you set into a floor screed the simpler your tiling will be.
Best Small Kitchen Design Ideas Home Design
Interior Design Ideas  Home Bunch Interior Design Ideas

Step five: Tile floor and walls
Lay your tiles on the floor first and after that grout. Then lay your wall tiles ensuring that that they're level while you lay. Once the toilet tiles have been cut and laid, grout all of your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring it is level and sealed throughout the top with silicone as well as seal around the bath. Tip: make sure they come in the right place before you decide to drill in your tiles.
Kitchen Layouts Best Kitchen Design Layout
Best Small Kitchen Design Ideas  Home Design

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making certain things are fitted correctly knowning that there isn't any leaks with your plumbing. - Enjoy a new bathroom.