Encimeras de cemento para la cocina

Kitchen Countertops Design 40 Best Kitchen Countertops Design Ideas Types Of Kitchen Counters Encimeras de cemento para la cocina

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms at home plus they are also one the most costly to renovate. Bathroom renovation can be a job that, if done well, can add value to a home as well as a great space full of design and light.
Encimeras de cemento para la cocina

Bathroom design
Bathroom design is the first part of a bath room renovation you ought to get right. Just replacing the prevailing bathroom with the exact same design might not be enough. The key to great bathroom design would be to design it while using people who will certainly apply it in mind. However be sure that a bath room design also has an overall use factor as well.

For example: If you were designing a bathroom for families you could still design the toilet with easy access towards the shower and bath. This would ensure that the look would recieve treatment if you have limited mobility. This means if you sell your home or if you are renovating for profit your design has a wider market appeal. Great bathroom design also uses the space well, taking into account the sunshine or window space, size of fittings, and drainage options. Draw out an agenda to scale and all the way down the sizes of one's room. Mark the current drainage points and after that and water inlet points. Write down a wish listing of the toilet fittings to wish and need making use of their sizes. Now marry the two together and discover what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at extra cost.
Best 25+ Wood countertops ideas on Pinterest

Bathroom remodel
If you have chosen to do the work yourself or part of the project it is time to work with a skip bin and grab the previous bathroom. If your own home is made pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing set up you'll not have to turn water off for your house. Also you should jack hammer a floor tiles up and also the sand and cement bed actually laid on.
Choosing the Right Kitchen Countertops  HGTV

Bathroom Renovation and construction
Bathrooms should be construction properly from your ground-up to make certain that the finished job is correct and true. This also ensures the design and search of the toilet can have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the tub hob and bath.

Waterproof the ground and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Kitchen Countertops 101  Bob Vila


Paint ceiling and final  one - Plumbing and electrical
At this aspect all new plumbing is installed for clean cold and hot water and drainage. Careful attention has to be taken when positioning the newest plumbing so that the plumbing fittings are correct in the event the tiling is fully gone. For example: To centre a fitting in a very shower recess you have to take into consideration the thickness of the wall board, tile glue and tile therefore the fitting will probably be centred following the tiles are in position. The same relates to installing drainage pipes for the toilet; the wall lining and tile thickness should be taken into consideration therefore the pipe influences correct position once the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them for the mains power.
kitchen countertop ideas Orlando

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board having a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you might be laying your tiles from floor to ceiling do not install the cornice as this is most effectively achieved after tiling. If you're not tiling to the ceiling go on and install the cornice after the wallboard and ceiling lining are already installed. Also if your bath is not freestanding you can now make up the frame and install the bath. Ensure the bathtub is installed correctly enabling the thickness from the tiles and  sure to evaluate all linings and pipes before you continue with a bath room renovation.

Best 25+ Wood countertops ideas on Pinterest
Encimeras de cemento para la cocina

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing the floor make sure that the waterproofing comes 100mm the walls. The shower recess will have to be waterproofed 100mm higher than the shower rose outlet. Also the tub needs to be waterproofed 100mm higher than the lip from the bath about and towards the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, so the all water will still only drop a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most important.
Step four - Lay within the cement screed for a floor.

Before the ground tiles can laid the bottom must be smooth and fairly flat having a slight fall on the drainage outlet. To do this you need to use sand and cement mix and it is better to give a waterproofing agent into this too. With a level, set the bottom level at the doorway. Use the top aluminum angle because the finished floor level and measure down the thickness in the tile plus 10mm for the glue. Mark about the restroom which has a level after which screed within your sand and cement mix using a 1 to 3 degree fall to the top of the drain outlet. Take your time and have it right with the finished level as smooth as you can. When the sand cement mix has set but isn't dry (it is possible to walk onto it however, you it is still a little soft) rub it over having a house brick. This will remove every one of the small highs and lows and appearance with a level as you go. Let the bathroom floor fully dry and after that you must have a great surface to tile onto. Tip: the more work you add into a floor screed the simpler your tiling will be.
Choosing the Right Kitchen Countertops HGTV
Best 25+ Wood countertops ideas on Pinterest

Step five: Tile floor and walls
Lay your tiles on the bottom first and after that grout. Then lay your wall tiles ensuring that they are level while you lay. Once the lavatory tiles have been cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit a new bathroom vanity ensuring it really is level and sealed across the top with silicone and also seal around the tub. Tip: make sure they will be in the right place before you drill into the tiles.
Kitchen Countertops 101 Bob Vila
Choosing the Right Kitchen Countertops  HGTV

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring that things are all fitted correctly knowning that there isn't any leaks with your plumbing. - Enjoy your brand-new bathroom.

Comments