Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms at home plus they are also one the most expensive to renovate. Bathroom renovation is really a job that, if done well, may add value with a home as well as a great space filled with design and light-weight.
Early New England Homes  Gallery

Bathroom design
Bathroom design will be the first division of your bathroom renovation you need to get right. Just replacing the prevailing bathroom sticking with the same design will not be enough. The key to great bathroom design is always to design it while using folks that will certainly utilize it planned. However ensure that your bathrooms design even offers a general use factor at the same time.

For example: If you were designing your bathrooms for families you can still design the lavatory with quick access for the shower and bath. This would ensure that the design would recieve treatment if you have limited mobility. This means if you choose to sell your house or if you might be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the room well, taking into consideration the light or window space, height and width of fittings, and drainage options. Draw out a strategy to scale and right down the sizes of one's room. Mark the existing drainage points after which and water inlet points. Write down a wish set of the toilet fittings to want and desire using sizes. Now marry both the together and discover what fits. Note: Most bathroom drainage and water inlet points can be moved but this may come at extra expense.
Acquired Objects: New Orleans Style

Bathroom remodel
If you have chosen to do the job yourself or part of the task it's time to work with a skip bin and grab the existing bathroom. If your property appeared pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing available you will not need to turn the river off for the whole house. Also you will likely need to jack hammer the floor tiles up and also the sand and cement bed that they are laid on.
Brevard Tiny House Company  Tiny House Design

Bathroom Renovation and construction
Bathrooms has to be construction properly from your start to make sure that the finished job is correct and true. This also ensures the style and search of the restroom could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof the floor and shower and bath recess.

Correct nov a floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Asheville Model Home Interior Design 1264f  Traditional  Kitchen  Tampa  by Arthur Rutenberg


Paint ceiling and final  one - Plumbing and electrical
At this time new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the brand new plumbing in order that the plumbing fittings are correct if the tiling is finished. For example: To centre a fitting inside a shower recess you should take into consideration the thickness with the wall board, tile glue and tile therefore the fitting will probably be centred following the tiles are set up. The same relates to installing drainage pipes for any toilet; the wall lining and tile thickness have to be looked at hence the pipe is within the correct position once the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them to the mains power.
ALLU ARJUN NEW HOUSE IN HYDERABAD  YouTube

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board using a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you happen to be laying your tiles from floor to ceiling tend not to install the cornice because this is best done after tiling. If you are not tiling towards the ceiling go on and install the cornice as soon as the wallboard and ceiling lining are actually installed. Also if your bath is not freestanding you can now make up the frame and install the tub. Ensure the bath is installed correctly allowing for the thickness with the tiles and  sure to test all linings and pipes before you continue with a bath room renovation.

Acquired Objects: New Orleans Style
Early New England Homes  Gallery

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the bottom be sure that the waterproofing comes 100mm up the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the bath should be waterproofed 100mm over the lip from the bath right around and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, hence the all water will simply go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most important.
Step four - Lay inside the cement screed for the ground.

Before a floor tiles can laid the floor has to be smooth and fairly flat having a slight fall to the drainage outlet. To do this you need to use sand and cement mix which is far better to put in a waterproofing agent into this at the same time. With a level, set the floor level with the doorway. Use the top aluminum angle since the finished floor level and measure around the thickness with the tile plus 10mm to the glue. Mark right around the bathroom having a level and then screed in your sand and cement mix having a 1 to 3 degree fall to the top with the drain outlet. Take your time and have it right with the finished level as smooth as you possibly can. When the sand cement mix has set but is not dry (you'll be able to walk into it but you it is a lttle bit soft) rub it over having a house brick. This will remove all the small highs and lows and check with a level when you go. Let the bathroom floor fully dry after which you needs to have a great surface to tile onto. Tip: the harder work you add into a floor screed the easier your tiling is going to be.
Brevard Tiny House Company Tiny House Design
Acquired Objects: New Orleans Style

Step five: Tile floor and walls
Lay your tiles on the floor first then grout. Then lay your wall tiles making sure that they are level while you lay. Once the restroom tiles happen to be cut and laid, grout your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your bathroom vanity ensuring it's level and sealed across the top with silicone as well as seal around the bathtub. Tip: make sure they have been in the right place before you decide to drill into your tiles.
Asheville Model Home Interior Design 1264f Traditional Kitchen Tampa by Arthur Rutenberg
Brevard Tiny House Company  Tiny House Design

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring things are all fitted correctly and that there aren't any leaks in your plumbing. - Enjoy your brand-new bathroom.