Decorating with a Television In the Living Room The Inspired Room

How To Decorate A Small Living Room With A Fireplace Design Ideas Decorating with a Television In the Living Room The Inspired Room

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home plus they are also certainly the most expensive for renovate. Bathroom renovation is a job that, if done well, can add value to your home and a great space brimming with design and light.
Decorating with a Television In the Living Room  The Inspired Room

Bathroom design
Bathroom design may be the first division of a bath room renovation you ought to get right. Just replacing the present bathroom with the exact same design is probably not enough. The key to great bathroom design is to design it while using people that are going to put it to use in your mind. However make sure that a bath room design also has an over-all use factor as well.

For example: If you were designing a bath room for families you may still design the toilet with quick access towards the shower and bath. This would ensure that the style would work if you have limited mobility. This means if you opt to sell your house or if you happen to be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the room well, considering the sunlight or window space, height and width of fittings, and drainage options. Draw out an idea to scale and down the sizes of the room. Mark the prevailing drainage points and after that and water inlet points. Write down a wish list of the toilet fittings to want and want using their sizes. Now marry the 2 together and find out what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at expense.
50 Modern And Traditional Fireplace Interior Design Ideas

Bathroom remodel
If you decide to perform the task yourself or part of the work it really is time to engage a skip bin and grab the existing bathroom. If your property appeared pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing available you'll not have to turn the river off for the whole house. Also you will have to jack hammer the bottom tiles up along with the sand and cement bed actually laid on.
20 Bedroom Fireplace Designs  HGTV

Bathroom Renovation and construction
Bathrooms should be construction properly through the ground up to make sure that the finished job is correct and true. This also ensures the style and appearance of the toilet will have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the tub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct december a floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
17+ Corner Fireplace Designs, Ideas  Design Trends  Premium PSD, Vector Downloads


Paint ceiling and final  one - Plumbing and electrical
At this aspect many new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the new plumbing so the plumbing fittings are correct when the tiling is finished. For example: To centre a fitting in a very shower recess you must think about the thickness from the wall board, tile glue and tile therefore the fitting is going to be centred as soon as the tiles are available. The same relates to installing drainage pipes for any toilet; the wall lining and tile thickness must be looked at hence the pipe is within the correct position if the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
How to Arrange Your Living Room Furniture  CCD Engineering Ltd

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board which has a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling tend not to install the cornice as this is done after tiling. If you happen to be not tiling towards the ceiling go on and install the cornice after the wallboard and ceiling lining happen to be installed. Also if your bath isn't freestanding you can now form the frame and install the bath. Ensure the tub is installed correctly allowing for the thickness in the tiles and  sure to check all linings and pipes prior to deciding to continue with your bathroom renovation.

50 Modern And Traditional Fireplace Interior Design Ideas
Decorating with a Television In the Living Room  The Inspired Room

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing the ground be sure that the waterproofing comes 100mm in the walls. The shower recess will need to be waterproofed 100mm over the shower rose outlet. Also the bath ought to be waterproofed 100mm higher than the lip of the bath around and to the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, therefore the all water will simply decrease a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay inside the cement screed for a floor.

Before the floor tiles can laid the bottom have to be smooth and fairly flat using a slight fall for the drainage outlet. To do this you have to use sand and cement mix and it is far better to include a waterproofing agent into this also. With a level, set the ground level with the doorway. Use the top aluminum angle as the finished floor level and measure on the thickness in the tile plus 10mm to the glue. Mark right around the restroom using a level then screed with your sand and cement mix with a 1 to 3 degree fall to the top of the drain outlet. Take your time and get it right using the finished level as smooth as you possibly can. When the sand cement mix has set but is just not dry (you can walk about it however you it's still somewhat soft) rub it over with a house brick. This will remove each of the small highs and lows and check with a level when you go. Let the bathroom floor fully dry and then you must have a great surface to tile onto. Tip: the greater work you add into the ground screed the easier your tiling will likely be.
20 Bedroom Fireplace Designs HGTV
50 Modern And Traditional Fireplace Interior Design Ideas

Step five: Tile floor and walls
Lay your tiles on a floor first and then grout. Then lay your wall tiles making sure actually level as you lay. Once the toilet tiles are already cut and laid, grout all of your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit a new bathroom vanity making sure it can be level and sealed round the top with silicone and also seal around the tub. Tip: make sure they will be in the right place before you decide to drill into your tiles.
17+ Corner Fireplace Designs, Ideas Design Trends Premium PSD, Vector Downloads
20 Bedroom Fireplace Designs  HGTV

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring everything is fitted correctly understanding that there won't be any leaks inside your plumbing. - Enjoy your new bathroom.

Comments