Cottage House Plan with 3 Bedrooms and 2.5 Baths Plan 5517

3 Bedroom Home Design Plans Plan For A House Of 3 Bedroom Homes Floor Plans Cottage House Plan with 3 Bedrooms and 2.5 Baths Plan 5517

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms at home and they are generally also the most costly to renovate. Bathroom renovation is a job that, if done well, may add value to a home and a great space packed with design and light.
Cottage House Plan with 3 Bedrooms and 2.5 Baths  Plan 5517

Bathroom design
Bathroom design may be the first area of your bathroom renovation you need to get right. Just replacing the prevailing bathroom sticking with the same design is probably not enough. The key to great bathroom design is to design it while using individuals who will certainly put it to use in your mind. However make sure that your bathroom design also has an over-all use factor as well.

For example: If you were designing a bath room for families you could still design the bathroom with easy accessibility on the shower and bath. This would make sure that the look would recieve treatment for those who have limited mobility. This means if you sell your property or if you are renovating for profit your design has a wider market appeal. Great bathroom design also uses space well, taking into consideration the sunlight or window space, size fittings, and drainage options. Draw out an idea to scale and down the sizes of one's room. Mark the current drainage points then and water inlet points. Write down a wish report on the restroom fittings to wish and wish using their sizes. Now marry both together and see what fits. Note: Most bathroom drainage and water inlet points can be moved but this certainly does come at extra cost.
Craftsman Style House Plan  3 Beds 2 Baths 1749 Sq/Ft Plan 43417

Bathroom remodel
If you've decided to perform the work yourself or part of the job it can be time to employ a skip bin and grab that old bathroom. If your house is made pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing available you do not have to turn the lake off for the whole house. Also you should jack hammer the floor tiles up and also the sand and cement bed that they are laid on.
3 Bedroom House Plans  Home Designs  Celebration Homes

Bathroom Renovation and construction
Bathrooms have to be construction properly through the ground-up to be sure that the finished job is correct and true. This also ensures the style and appearance of the restroom could have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct nov the floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
3 Bedroom House Plans  Home Designs  Celebration Homes


Paint ceiling and final  one - Plumbing and electrical
At this point all new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the brand new plumbing so the plumbing fittings are correct when the tiling is completed. For example: To centre a fitting in a very shower recess you need to consider the thickness of the wall board, tile glue and tile hence the fitting will be centred after the tiles are set up. The same pertains to installing drainage pipes to get a toilet; the wall lining and tile thickness must be taken into consideration so the pipe influences correct position if the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them on the mains power.
3 Bedroom House Plans One Story  Marceladick.com

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout onto your new wall board using a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you're laying your tiles from floor to ceiling don't install the cornice because this is most effectively achieved after tiling. If you are not tiling to the ceiling go on and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath is just not freestanding now you can make up the frame and install the bath. Ensure the bath is installed correctly making it possible for the thickness from the tiles and  sure to evaluate all linings and pipes before you continue with your bathroom renovation.

Craftsman Style House Plan 3 Beds 2 Baths 1749 Sq/Ft Plan 43417
Cottage House Plan with 3 Bedrooms and 2.5 Baths  Plan 5517

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing the bottom ensure that the waterproofing comes 100mm up the walls. The shower recess will need to be waterproofed 100mm above the shower rose outlet. Also the bath should be waterproofed 100mm across the lip from the bath about and towards the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, so the all water will simply decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most significant.
Step four - Lay in the cement screed for the floor.

Before a floor tiles can laid the bottom must be smooth and fairly flat having a slight fall for the drainage outlet. To do this you have to use sand and cement mix in fact it is advisable to add a waterproofing agent into this at the same time. With a level, set a floor level in the doorway. Use the top aluminum angle because finished floor level and measure around the thickness in the tile plus 10mm to the glue. Mark around the restroom using a level and then screed within your sand and cement mix using a 1 to 3 degree fall on the top from the drain outlet. Take your time and get it right while using finished level as smooth as you can. When the sand cement mix has set but isn't dry (you'll be able to walk onto it however you will still be a bit soft) rub it over which has a house brick. This will remove each of the small highs and lows and appearance which has a level while you go. Let the toilet floor fully dry then you really should have an excellent surface to tile onto. Tip: greater work you add into a floor screed the more your tiling will be.
3 Bedroom House Plans Home Designs Celebration Homes
Craftsman Style House Plan  3 Beds 2 Baths 1749 Sq/Ft Plan 43417

Step five: Tile floor and walls
Lay your tiles on the bottom first after which grout. Then lay your wall tiles ensuring that that they're level when you lay. Once the restroom tiles happen to be cut and laid, grout all your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your bathroom vanity ensuring it really is level and sealed around the top with silicone as well as seal around the bath. Tip: make sure they are in the right place before you decide to drill into your tiles.
3 Bedroom House Plans Home Designs Celebration Homes
3 Bedroom House Plans  Home Designs  Celebration Homes

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring things are all fitted correctly understanding that there won't be any leaks in your plumbing. - Enjoy your brand-new bathroom.

Comments