Contemporary Home Office Furniture / design bookmark 14565

Home Office Modern Furniture Home Office Modern Furniture For Well Office Modern Modern Office Contemporary Home Office Furniture / design bookmark 14565

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms at home and they are also one the most expensive to renovate. Bathroom renovation is really a job that, if done well, will add value with a home along with a great space packed with design and light.
Contemporary Home Office Furniture / design bookmark 14565

Bathroom design
Bathroom design will be the first section of a bath room renovation you need right. Just replacing the existing bathroom with the exact same design might not be enough. The key to great bathroom design is usually to design it with the folks that will apply it in mind. However make sure that your bathrooms design also has an over-all use factor as well.

For example: If you were designing a bath room for families you might still design the lavatory with easy access for the shower and bath. This would make sure that the style would work for people with limited mobility. This means if you opt to sell your home or if you might be renovating for profit your design has a wider market appeal. Great bathroom design also uses the area well, looking at the sunlight or window space, sized fittings, and drainage options. Draw out a plan to scale and down the sizes of one's room. Mark the prevailing drainage points and then and water inlet points. Write down a wish list of the restroom fittings to wish and need with their sizes. Now marry both the together and find out what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at extra expense.
Best 20+ Modern desk ideas on Pinterest  Modern office desk, Minimalist study furniture and

Bathroom remodel
If you've decided to perform the work yourself or part of the task it really is time to employ a skip bin and take out the previous bathroom. If your house was developed pre 1980 you could have fibro bathroom wall linings with asbestos inside it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing available you won't have to turn the lake off for the complete house. Also you will likely need to jack hammer the ground tiles up as well as the sand and cement bed actually laid on.
Italian contemporary furniture

Bathroom Renovation and construction
Bathrooms have to be construction properly in the ground-up to be sure that the finished job is correct and true. This also ensures the style and look of the toilet can have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof the bottom and shower and bath recess.

Correct the fall of the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Twitter Office Plans By Design Simple But Modern / Designs Ideas And Photos Of House Home And


Paint ceiling and final  one - Plumbing and electrical
At this point many new plumbing is installed for clean hot and cold water and drainage. Careful attention should be taken when positioning the new plumbing so your plumbing fittings are correct when the tiling is fully gone. For example: To centre a fitting in the shower recess you need to take into consideration the thickness of the wall board, tile glue and tile and so the fitting will probably be centred following the tiles are available. The same applies to installing drainage pipes for any toilet; the wall lining and tile thickness should be considered and so the pipe is in the correct position if the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
Modern Office Desk Inspirations for Home Workspace  Traba Homes

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board with a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you are laying your tiles from floor to ceiling do not install the cornice because this is done after tiling. If you are not tiling to the ceiling proceed to install the cornice following your wallboard and ceiling lining are actually installed. Also if your bath isn't freestanding now you can make up the frame and install the tub. Ensure the bath is installed correctly allowing for the thickness of the tiles and  sure to check on all linings and pipes before you continue with a bath room renovation.

Best 20+ Modern desk ideas on Pinterest Modern office desk, Minimalist study furniture and
Contemporary Home Office Furniture / design bookmark 14565

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the floor ensure that the waterproofing comes 100mm up the walls. The shower recess must be waterproofed 100mm over the shower rose outlet. Also the bath ought to be waterproofed 100mm across the lip of the bath right around and on the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, so the all water is only going to go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most important.
Step four - Lay in the cement screed for the floor.

Before a floor tiles can laid a floor has to be smooth and fairly flat with a slight fall towards the drainage outlet. To do this you need to use sand and cement mix which is advisable to give a waterproofing agent into this also. With a level, set the ground level on the doorway. Use the top aluminum angle because the finished floor level and measure down the thickness of the tile plus 10mm for your glue. Mark about the bathroom with a level and then screed inside your sand and cement mix using a 1 to 3 degree fall for the top from the drain outlet. Take your time and obtain it right using the finished level as smooth as is possible. When the sand cement mix has set but is not dry (you are able to walk about it but you it's still somewhat soft) rub it over using a house brick. This will remove each of the small highs and lows and look using a level because you go. Let the bathroom floor fully dry after which you should have an excellent surface to tile onto. Tip: greater work you add into the floor screed the easier your tiling will likely be.
Italian contemporary furniture
Best 20+ Modern desk ideas on Pinterest  Modern office desk, Minimalist study furniture and

Step five: Tile floor and walls
Lay your tiles on the bottom first and then grout. Then lay your wall tiles making sure that they are level when you lay. Once the toilet tiles have been cut and laid, grout your entire tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your new bathroom vanity making sure it's level and sealed round the top with silicone and also seal around the tub. Tip: make sure they come in the right place before you drill into the tiles.
Twitter Office Plans By Design Simple But Modern / Designs Ideas And Photos Of House Home And
Italian contemporary furniture

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making sure it is all totally fitted correctly and that there aren't any leaks within your plumbing. - Enjoy a new bathroom.

Comments