Color Ideas for kitchen/living room open floor plan, fireplace, paint, colors Home Interior

Interior Design Ideas For Kitchen And Living Room Color Ideas for kitchen/living room open floor plan, fireplace, paint, colors Home Interior

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house and they are also one the most expensive to renovate. Bathroom renovation is a job that, if done well, can also add value to your home and a great space brimming with design and light.
Color Ideas for kitchen/living room open floor plan, fireplace, paint, colors  Home Interior

Bathroom design
Bathroom design may be the first area of your bathrooms renovation you should get right. Just replacing the existing bathroom with the same design will not be enough. The key to great bathroom design is always to design it with all the people that are going to use it in your mind. However be sure that your bathroom design even offers a broad use factor also.

For example: If you were designing your bathroom for families you may still design the toilet with easy accessibility to the shower and bath. This would be sure that the structure would recieve treatment if you have limited mobility. This means if you sell your home or if you happen to be renovating for profit your design features a wider market appeal. Great bathroom design also uses the room well, considering the lighting or window space, size fittings, and drainage options. Draw out an idea to scale and all the way down the sizes of your room. Mark the existing drainage points then and water inlet points. Write down a wish listing of the restroom fittings to need and need using sizes. Now marry both together and discover what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at extra cost.
Home Ideas  House Designs Photos  Decorating Ideas

Bathroom remodel
If you have decided to perform the project yourself or part of the job it is time to hire a skip bin and pull out the previous bathroom. If your home was developed pre 1980 you might have fibro bathroom wall linings with asbestos within it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in position you won't ought to turn water off for the entire house. Also you should jack hammer the ground tiles up and also the sand and cement bed they are laid on.
Scandinavian Style interior design ideas

Bathroom Renovation and construction
Bathrooms have to be construction properly from the ground up to ensure that the finished job is correct and true. This also ensures the look and appearance of the toilet can have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the tub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct the fall of the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Open Concept Kitchen Living Room Design Ideas


Paint ceiling and final  one - Plumbing and electrical
At now all new plumbing is installed for clean hot and cold water and drainage. Careful attention must be taken when positioning the brand new plumbing so the plumbing fittings are correct if the tiling ends. For example: To centre a fitting in the shower recess you must think about the thickness from the wall board, tile glue and tile hence the fitting will be centred following the tiles are available. The same refers to installing drainage pipes to get a toilet; the wall lining and tile thickness have to be looked at so the pipe is in the correct position if the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them towards the mains power.
Open Concept Kitchen and Living Room – 55 Designs  Ideas  InteriorZine

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you happen to be laying your tiles from floor to ceiling don't install the cornice because this is most effectively achieved after tiling. If you happen to be not tiling for the ceiling just install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath just isn't freestanding now you can make up the frame and install the bathtub. Ensure the bath is installed correctly making it possible for the thickness from the tiles and  sure to check all linings and pipes when you continue with a bath room renovation.

Home Ideas House Designs Photos Decorating Ideas
Color Ideas for kitchen/living room open floor plan, fireplace, paint, colors  Home Interior

Step three - Waterproof your bathrooms
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the ground be sure that the waterproofing comes 100mm the walls. The shower recess will need to be waterproofed 100mm over the shower rose outlet. Also the bathtub must be waterproofed 100mm higher than the lip with the bath about and for the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, therefore the all water will still only go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay inside the cement screed for a floor.

Before the bottom tiles can laid the ground should be smooth and fairly flat using a slight fall towards the drainage outlet. To do this you need to use sand and cement mix in fact it is far better to add a waterproofing agent into this also. With a level, set the floor level with the doorway. Use the top aluminum angle since the finished floor level and measure on the thickness from the tile plus 10mm for the glue. Mark about the lavatory with a level then screed within your sand and cement mix having a 1 to 3 degree fall towards the top from the drain outlet. Take your time and acquire it right with all the finished level as smooth as possible. When the sand cement mix has set but just isn't dry (you are able to walk onto it however, you it is a lttle bit soft) rub it over having a house brick. This will remove all the small highs and lows and check which has a level as you go. Let the toilet floor fully dry after which you really should have a great surface to tile onto. Tip: the greater work you add into the floor screed the easier your tiling will be.
Scandinavian Style interior design ideas
Home Ideas  House Designs Photos  Decorating Ideas

Step five: Tile floor and walls
Lay your tiles on the floor first and after that grout. Then lay your wall tiles ensuring that actually level while you lay. Once the restroom tiles happen to be cut and laid, grout all of your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring that it's level and sealed round the top with silicone and in addition seal around the bathtub. Tip: make sure they are in the right place prior to deciding to drill into your tiles.
Open Concept Kitchen Living Room Design Ideas
Scandinavian Style interior design ideas

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that things are all fitted correctly understanding that there won't be any leaks with your plumbing. - Enjoy your brand-new bathroom.

Comments